Third Notice BLD | 1/8/2007 | 1/8/2007 | 1/29/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 12/27/2006 | 12/27/2006 | 1/8/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/8/2006 | 12/27/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/8/2006 | | DONE |
|
|
|
|
Permanent occupancy | | | 12/8/2006 | | DONE |
|
|
|
Perm. Occ. Cert. # 11350 issued 12-8-06 to Fancy Pants.
|
BLD-Final | 12/5/2006 | 12/6/2006 | 12/6/2006 | A | PASS |
Dave Hannah
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok for perm occ
|
BLD-Final | 10/30/2006 | 10/31/2006 | 10/31/2006 | P | PART |
Jim Sly
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Patricia Smith OK for Temp Occ....... OK for Perm Occ. when Electr, and Plumb Perms.
|
FIRE-Final Inspection | 10/30/2006 | 10/31/2006 | 10/31/2006 | P | PASS |
Forrest France
|
|
|
Life safety inspection passed per final field inspection completed by S. Arellano.
|
BLD-Framing/Rough-in | 10/20/2006 | 10/23/2006 | 10/23/2006 | P | PASS |
Dave Hannah
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
FIRE-Conference | 10/20/2006 | 10/23/2006 | 10/23/2006 | P | DONE |
Forrest France
|
|
|
On site confrence to discuss fire code review notes.
|
Routing - PUBLIC WORKS | 10/18/2006 | | 10/18/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/18/2006 | | 10/18/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/18/2006 | | |
|
|
|
|
Telephone call | | | 10/18/2006 | | |
|
|
|
lft vm with scott cockerman ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 10/18/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/18/2006 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 9/14/2006 | | 10/18/2006 | | PASS |
|
|
|
10/18/2006 07:51:04 CJW - activity updated through activity BLDA022 from case BLD06-02515.
|
Routing - PLAN CHECK | 10/6/2006 | | 10/18/2006 | | PASS |
|
|
|
Drawings approved after 2nd resubmittal review.
|
Plan resubmittals received | | | 10/12/2006 | | |
|
|
|
Received transmittal letter and two copies of A1.0; taken to Carl Westfall//10/16/06 LEG
|
Telephone call | | | 10/11/2006 | | DONE |
|
|
|
Called the Architect. Left a voice mail message. Key locking hardware is allowed only on the main exterior door. Interior doors cannot have key locking hardware with the posted sign. The accessible fitting room must be redesigned to show a side approach to the end of the bench. The drawings are on hold.
|
Plan resubmittals received | | | 10/10/2006 | | |
|
|
|
Received 1pg. response letter, revised certificate of value, 2 copies of pages T1.0, A1.0, A3.0; taken to Carl Westfall
|
Routing - FIRE | 10/3/2006 | | 10/6/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 10/6/2006 | | FAIL |
|
|
|
Failed plan check.
|
Routing - PLAN CHECK | 9/15/2006 | | 10/3/2006 | | FAIL |
|
|
|
The IBC plan review was started on September 29, 2006 and was finished on October 3, 2006. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 9/14/2006 | | 9/15/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 8/30/2006 | | |
|
|
|
|
Application received | | | 8/29/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/29/2006 | | |
|
|
|
|