BLD-Aging Inspection | 11/27/2009 | 11/27/2009 | 11/30/2009 | | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 11/30/2009 | 11/30/2009 | 11/30/2009 | A | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 11/30/2009 | 11/30/2009 | 11/30/2009 | A | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 3/11/2008 | 3/11/2008 | 3/11/2008 | P | PART |
Dave Hannah
|
|
|
sean Phone #: ###-#### ok to final after plb finals
|
BLD-Final | 2/19/2008 | 2/22/2008 | 2/22/2008 | A | NR |
Dave Hannah
|
|
|
shawn Phone #: ###-#### needs mec final and hand rails not finished will do full inspection at final
|
BLD-Energy code compliance | 12/10/2007 | 12/11/2007 | 12/11/2007 | A | PASS |
Mike Jordan
|
|
|
jerry - insulation Phone #: ###-####
|
BLD-Framing/Rough-in | 12/7/2007 | 12/7/2007 | 12/7/2007 | P | PASS |
Dave Hannah
|
|
|
shawn Phone #: ###-#### ok to insulate after mec r/i
|
BLD-Framing/Rough-in | 12/5/2007 | 12/6/2007 | 12/6/2007 | P | NR |
Mike Jordan
|
|
|
sean Phone #: ###-####. Needs mech/elec ri and complete airseal package.
|
BLD-Framing/Rough-in | 5/14/2007 | 5/14/2007 | 5/14/2007 | P | NR |
Tony Young
|
|
|
SEAN ; Phone #: ###-#### Internet Inspection Request from: Darla Downs need trades 1st,, phone conf
|
BLD-Footing | 2/26/2007 | 2/27/2007 | 2/27/2007 | A | FAIL |
Dave Hannah
|
|
|
matt ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith no forms set no one on site
|
BLD-Other | 1/19/2007 | 1/19/2007 | 1/22/2007 | P | PASS |
Dave Hannah
|
|
|
matt Note: basement rebar; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Foundation | 1/22/2007 | 1/22/2007 | 1/22/2007 | A | PASS |
Dave Hannah
|
|
|
matt Note: basement rebar; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 1/11/2007 | 1/11/2007 | 1/11/2007 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/11/2007 at 6:53:17 AM. Contact: ###-####.
|
BLD-Footing | 12/6/2006 | 12/6/2006 | 12/6/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/6/2006 at 7:26:32 AM. Contact: ###-####. garage ok to pour
|
BLD-Conference | 10/23/2006 | 10/24/2006 | 10/24/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 10/23/2006 at 8:41:39 PM. Contact: ###-####. needs to have prop lines set
|
Inspection Record Card- Bld | | | 10/6/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/6/2006 | | DONE |
|
|
|
tlk to sean ###-#### that permit and fees are ready to be picked up but nees RP/GC/RCE
|
Permit Ready to Issue | | | 10/6/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/6/2006 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 9/28/2006 | 9/28/2006 | 10/5/2006 | | PASS |
|
|
|
10/5/2006 11:36:36 SRZ - activity updated through activity BLDA022 from case BLD06-02517.
|
Routing - PLAN CHECK | 8/30/2006 | | 10/5/2006 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 10/5/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/5/2006 | | DONE |
|
|
|
ONE SET APPROVED. (SRZ)
|
Plan assigned to (SAM) | 8/29/2006 | 8/29/2006 | 9/28/2006 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 9/28/2006 | | PASS |
|
|
|
Retaining wall Engineering required, and Garage plans needed to finish Plan review. (SRZ) Applicant changed design that meets prescriptive Code. (SRZ)
|
Telephone call | | | 9/28/2006 | | DONE |
|
|
|
Called Applicant and requested Engineering for basement retaining wall. Called Designer and Left message.(SRZ)
|
Routing - PLANNING | 8/29/2006 | | 8/30/2006 | | PASS |
|
|
|
Doesn't meet 2 off street parking requirement. Talked with Sean on 8/29, then talked to Bob A, and then left a mesg. with Sean on 8/30. After discussion, I redlined the plans as per Sean. He will add a parking pad and move the house 1" east to accomodate the stairs.
|
Routing - PUBLIC WORKS | 8/30/2006 | | 8/30/2006 | | PASS |
|
|
|
|
Routing - Addressing | 8/29/2006 | | 8/29/2006 | | PASS |
|
|
|
|
Application received | | | 8/29/2006 | | |
|
|
|
|
Routing - PLANNING | 9/1/2006 | | | | |
|
|
|
site plan not signed
|