Information based on query as of Friday, August 16, 2024.
Permit Information
Permit NumberBLD06-02534
StatusFinaled
Name STEED CONSTRUCTION
Site Address 7960 W RIFLEMAN ST
Project NameTowne Square Station Bldg B
Customer Number 
ePlanReviewNo
Description
(ARTISAN OPTICS - TOWNE SQUARE STATION BLDG B) To complete a two story 6,320 sq.ft. (3,296 sq. ft. 1st floor / 3,024 sq. ft. 2nd floor) first time tenant build-out for Artisan Optometry clinic with retail sales (852 sq. ft.) & medical services, office and support areas (5,468 sq. ft.) in new shell building. Shell permit is BLD06-00212. Work includes structural modifications and infill of approximately 850 sq. feet on the second floor in an area previously open to below under shell permit; modification of structure to install new elevator, enclosure, support structure and equipment; to construct interior non-bearing walls on all levels to create exam, therapy, treatment, optical support areas, a build area and a display / sales area; to construct two fully accessible restrooms on the first floor and an accessible unisex restroom on the second floor; to install a drinking fountain and service sink on the main level with a water cooler called out on second floor in breakroom; to perform electrical, mechanical, plumbing, sprinkler & alarm systems installations to meet tenant needs and to comply with minimum adopted codes and ordinances of Boise City. NOTE: Separate applications, plans, approvals and permits are required from the Boise City fire dept. before any additions or modifications can be performed. This building is fully sprinklered for allowable area increase. DRH05-00395 drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD5/25/20075/25/200710/12/2007 DONE
Second Notice has not been responded to.
Telephone call  10/4/2007 DONE
tlk to scott rames ###-#### concerning the final values that should be ready - faxed new final sheet for him 10:20 am
Second Notice BLD5/9/20075/9/20075/25/2007 DONE
First Notice has not been responded to.
First Notice 4/23/20075/9/2007 DONE
BLD-Final4/10/20074/10/20074/10/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/10/2007 at 11:06:33 AM. Contact: ###-####. ok for perm occ. ele. Needs to final permit on computer, card was signed.
Permanent Occupancy 4/10/20074/10/2007 DONE
Details
Permanent occupancy UNPAID FEE  4/10/2007 DONE
Perm. Occ. Cert. # 11525 issued to Artisan Optics
BLD-Final4/6/20074/6/20074/6/2007PCANC
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/6/2007 at 11:30:05 AM. Contact: ###-####.
FIRE-Final Inspection3/8/20073/8/20073/8/2007APASS
DetailsTroy Cobbley
Life safety passed
BLD-Final3/8/20073/8/20073/8/2007APART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/8/2007 at 6:53:38 AM. Contact: ###-####. ok temp for temp.
Temporary occupancy  3/8/2007 DONE
Temp.Occ. Cert. # 5552 issued 3-8-07 to Artisan Optics.
BLD-Final3/7/20073/7/20073/7/2007PNR
DetailsMike Jordan
BLD-Final3/7/20073/7/20073/7/2007ANR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 3/7/2007 at 7:30:15 AM. Contact: ###-####. Still needs other trades.
FIRE-Final Inspection3/7/20073/7/20073/7/2007ACANC
DetailsAlan Hauser
Scheduled by a contractor via Hello! on 3/7/2007 at 7:19:50 AM. Contact: ###-####.
FIRE-Final Inspection3/6/20073/6/20073/6/2007PCANC
DetailsTroy Cobbley
waiting on fire alarm
FIRE-Final Inspection3/5/20073/5/20073/5/2007PCANC
DetailsTroy Cobbley
Fire alarm is not ready yet. No inspection was performed.
FIRE-Final Inspection3/1/20073/1/20073/2/2007PFAIL
DetailsTroy Cobbley
Need fire alarm and fire sprinkler signed off first. No inspection performed.
FIRE-Final Inspection3/1/20073/2/20073/2/2007AFAIL
DetailsTroy Cobbley
Need to get the sprinkler permit and fire alarm permits finaled first. No inspection performed.
BLD-Other2/9/20072/9/20072/9/2007PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/9/2007 at 10:56:32 AM. Contact: ###-####. Ceiling grid. ok.
BLD-Energy code compliance12/12/200612/12/200612/12/2006PPASS
DetailsJim Sly
Scheduled by a contractor via Hello! on 12/12/2006 at 7:34:28 AM. Contact: ###-####.
Fireblocking done.
BLD-Energy code compliance12/5/200612/5/200612/5/2006PPART
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/5/2006 at 10:11:28 AM. Contact: ###-####. 1st floor interior and exterior walls, firestop not done. Will verify at grid insp.
BLD-Framing/Rough-in12/1/200612/1/200612/1/2006PPASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 12/1/2006 at 9:01:00 AM. Contact: ###-####. Interior framed walls.
Issue PAID IN FULL permit  11/28/2006 DONE
Telephone call  11/27/2006 DONE
lft vm with jeff johnson ###-#### that permit and fees are ready to be picked but needs GC/RCE #
Permit Ready to Issue  11/27/2006 DONE
Print Occupancy Form  11/24/2006 DONE
Plan assigned to (DRS)9/14/2006 11/22/2006 PASS
11/22/2006 13:14:21 DRS - activity updated through activity BLDA022 from case BLD06-02534.
Routing - PLAN CHECK11/15/2006 11/22/2006 PASS
Received resubmittals from architect. New sheets inserted into plans. Plans red-lined with additional clarification not provided by architect and comments / conditions added to attached plan review report as a part of the approved plans. Taking plans to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  11/22/2006 PASS
Approved per red-lined conditions on plans and attached plan review comments, all part of approved plans..
Plan resubmittals received  11/21/2006  
Received transmittal document, 1pg. response letter from Wes Steele (Arch.), 1pg. response letter from Tru Engineering, 2 copies of the following: 6pg. elevator submitals, 4pg. elevator design and finishes, A12, S-0, S-4, S-5, S-7, E-1, E-2, E-3, E-4, E-5, E1.0, E2.1, E2.2, E2.3, E3.0; taken to Dan Stuart
Telephone call  11/15/2006 DONE
Call from Perry Foster, Romar Electric. He had received my review report and said project could not be done in accordance with my review and pass. He said the AR1 fixtures are for lighting of art not displays for glass frames annd associated items, I told him to indicate this in his response. He said the place would be dark if he had to meet code items specified. I suggested he review with Wes Smith (Romar), wes Steele (Habitec) & tenant.
Routing - PLAN CHECK10/23/2006 11/15/2006 FAIL
Inserted new plan resubmittals of 11/13/06 into original plans. All data & information requested was not provided; new structural plans referenced additional sheets for details that were not provided; lighting compliance certificate data compared to data in light fixture schedule show differences in wattage and lamping; automatic lighting shutoff for areas over 5000 sq. ft. was indicated in compliance statement but not indicated on plans for method, equipment to be provided for complaince; an additional fixture not in compliance statement would cause compliance to fail; future display lighting indicated on E4 with 600W transformers included as part of this project but not added into certificate as the allowable watts would be exceeded.
Plan resubmittals requested  11/15/2006 DONE
Faxed and e-mailed copy of plan review items remaining to be addressed for code compliance. Copy also faxed to Perry Foster, Romar Electric.
Telephone call  11/14/2006 DONE
Called Romar Electric to talk with Wes Smith who stamped the electrical plans. Wes was not available and I talked with Perry Foster concerning the Lighting Compliance Certificate and data that would indicate the project failed energy code requirements. Perry said he had to try and provide a way to meet the requirements of the Interior Designer and the owner/tenant and they wanted all the lighting. I also asked about the future lighting specified on E4 with what appears to be 6 - 600W transformers to be installed in preparation of the future display lighting. These additional amounts would add to the actual wattage and make the project more non-compliant. I will send him copy of plan review comments after second review is completed.
Telephone call  11/14/2006 DONE
Called to talk with Wes Steele. He is on vacation. I talked with Brandi and I expressed I had concerns on the Lighting Compliance Certificate which appears that it should have failed. Cursory review of resubmittals raised several questions. I ask Brandi who Wes Smith is with as he stamped the electrical plans. she told me Romar Electric.
Plan resubmittals received  11/13/2006 DONE
Received 1 comments,2 calcs & 2 copys of sheets A0,A1,A2,A3,A4,A5,A6,A7,A12,M1.0,M2.1,M3.0,M4.0,E-1,E-2,E-3,E-4,E-5,S-1,S-2,S-4,S-6,S-8 taken to Dan S.
1st review completed  10/23/2006 FAIL
Failed plan check.
Routing - FIRE10/18/2006 10/23/2006 PASS
Attached revew comments to plans.
Plan resubmittals requested  10/18/2006 DONE
Faxed and e-mailed copy of plan review comments to Wes Steele.
Routing - PLAN CHECK9/22/2006 10/18/2006 FAIL
Resubmittals required. E-mailed and faxed copy of plan review corrections to architect. Routing plans to fire code analyst for review.
Routing - PLUMBING9/15/2006 9/22/2006 PASS
approved per plan and 2003 UPC
Routing - PUBLIC WORKS9/14/2006 9/15/2006 PASS
Plans ACCEPTED BY PLAN TECH  9/1/2006  
Recd Pcfee & Taken To Pln CK  8/31/2006  
Application received  8/30/2006