Case Summary (BLD) | | | 2/16/2016 | | DONE |
|
|
|
|
First Notice | 9/2/2010 | 9/2/2010 | 9/14/2010 | | DONE |
Tony Young
|
|
|
|
BLD-Aging Inspection | 9/1/2010 | 9/1/2010 | 9/2/2010 | | FAIL |
Tony Young
|
|
|
|
DOC - Permit Finaled | 9/2/2010 | 9/2/2010 | 9/2/2010 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Aging Inspection | 6/28/2010 | 6/28/2010 | 7/1/2010 | | PASS |
Tony Young
|
|
|
|
Plan Reviewer's activity | | | 6/21/2010 | | DONE |
|
|
|
Took office copy to Records.
|
BLD-Final | 4/27/2010 | 4/28/2010 | 4/28/2010 | A | PASS |
Tony Young
|
|
|
joe Phone #: ###-####
|
BLD-Aging Inspection | 4/21/2010 | 4/21/2010 | 4/22/2010 | | PEND |
Tony Young
|
|
|
|
BLD-Conference | 11/5/2009 | 11/6/2009 | 11/6/2009 | A | PASS |
Tony Young
|
|
|
gus Phone #: ###-#### plumbing not trimmed out w/ fixtures,, see notes on permit,, will submit for T. I. soon and request to finish out then,, ok,, shell basically ok,, can do final on shell and T I at same time if ok w/ plan review,, call 415 w/ any ?s
|
BLD-Conference | 11/4/2009 | 11/5/2009 | 11/5/2009 | A | PART |
Tony Young
|
|
|
gus Phone #: ###-#### research for applicant
|
Reopen Permit (ISS) | | | 10/23/2009 | | DONE |
Tisha Gallop
|
|
|
paid 2 hr admin paid by owner to reopen expired per approved by Bob A., told him need to have elec. contractor reopen expired electrical permit ele07-00770 and get final inspection before can get fire and bld finals on building permit.
|
DOC - Permit Expired | 5/29/2009 | 5/29/2009 | 5/29/2009 | P | FAIL |
Tony Young
|
|
|
no inspections called in
|
BLD-Aging Inspection | 5/29/2009 | 5/29/2009 | 5/29/2009 | P | FAIL |
Tony Young
|
|
|
No work has been done as of OCT 07
|
BLD-Energy code compliance | 10/3/2007 | 10/3/2007 | 10/3/2007 | P | PASS |
Tony Young
|
|
|
august Phone #: ###-####
|
BLD-Energy code compliance | 7/9/2007 | 7/9/2007 | 7/9/2007 | P | FAIL |
Jim Sly
|
|
|
gus - pls call 30 mins prior; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang Walk thru with owner.......Exposed Kraft facing on insul. Lots of fireblocking needed....at double walls etc. Quality of Insulation installation .....not even close...... Short...gaps....missing....
|
BLD-Framing/Rough-in | 5/3/2007 | 5/3/2007 | 5/3/2007 | P | PASS |
Tony Young
|
|
|
Gus; Phone #: ###-#### Internet Inspection Request from: Andrea Whiteman
|
BLD-Conference | 3/14/2007 | 3/15/2007 | 3/15/2007 | P | FAIL |
Tony Young
|
|
|
Gus; Phone #: ###-#### Internet Inspection Request from: Stacie Backus frame and job conference,, need structural engineer to give letter of ok, since the job has varied from plan on details some,, also ftgs were poured w/out inspection
|
BLD-Framing/Rough-in | 3/14/2007 | 3/14/2007 | 3/14/2007 | P | FAIL |
Tony Young
|
|
|
gus; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie need trades 1st,, c/n to that effect,, can cover one side if needed
|
BLD-Aging Inspection | 2/26/2007 | 2/26/2007 | 2/27/2007 | | PEND |
Tony Young
|
|
|
|
Plan Reviewer's activity | | | 2/6/2007 | | PASS |
|
|
|
Revised drawings were submitted on February 2, 2007. The area in the vicinity of the North restrooms was changed. The existing restroom, although not totaly compliant with current accessibility standards, was allowed to remain without alteration because the obligation to upgrade under the "20% rule" was satisfied by creating 3 new accessible toilet rooms and by creating accessible entry doors. Narrow doors were allowed to serve the mechanical rooms and janitor's closets because these are equipment spaces and are not available to the public or used by the public. Mop or service sinks are NOT required to be accessible to the disabled. CJW
|
Plan resubmittals received | | | 2/2/2007 | | |
|
|
|
Ok to log in as resubmittals per Carl Westfall ;Received 3 copies of page A-1; taken to Carl Westfall
|
Inspection Record Card- Bld | | | 11/27/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/27/2006 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 9/22/2006 | | 11/22/2006 | | PASS |
|
|
|
11/22/2006 11:13:49 CJW - activity updated through activity BLDA022 from case BLD06-02545.
|
Routing - PLAN CHECK | 10/25/2006 | | 11/22/2006 | | PASS |
|
|
|
Drawings approved after 2nd resubmittal review.
|
Routing - PUBLIC WORKS | 11/22/2006 | | 11/22/2006 | | PASS |
|
|
|
More fixtures added.
|
Routing - PLAN CHECK | 11/22/2006 | | 11/22/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/22/2006 | | |
|
|
|
|
Plan resubmittals received | | | 11/20/2006 | | |
|
|
|
Received 1 cover transmittal, 1 copy of response letter, 2 copies of the following sheets--G-1, A-1, A-5, A-6 and taken to Carl Westfall
|
Plan resubmittals received | | | 11/15/2006 | | |
|
|
|
Received transmittal letter and one copy of pages S1.1 & S0.1; taken to Carl Westfall
|
Plan resubmittals received | | | 11/7/2006 | | |
|
|
|
Received transmittal letter, 2pg. letter of response, 2 copies of 4pg. letter with structural calculations from Stapley Engineering, 2 copies of the following pages: SD-2, A1-1, A-2, A-3, A-5, A-6, S7.1 and one copy of the following pages: S0.1, S1.1; taken to Carl Westfall
|
1st review completed | | | 10/25/2006 | | FAIL |
|
|
|
Failed plan check.
|
Routing - FIRE | 10/21/2006 | | 10/25/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 9/29/2006 | | 10/21/2006 | | FAIL |
|
|
|
The IBC plan review was started on October 20, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PLANNING | 9/29/2006 | | 9/29/2006 | | PASS |
|
|
|
Approved per DRH06-00279
|
Routing - Erosion and Sediment | 9/27/2006 | | 9/29/2006 | | PASS |
|
|
|
ESC waiver request approved with attached conditions.
|
Routing - Erosion and Sediment | 9/25/2006 | | 9/26/2006 | | FAIL |
|
|
|
Refer to Bld06-02546
|
Routing - PUBLIC WORKS | 9/22/2006 | | 9/25/2006 | | PASS |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/6/2006 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2006 | | |
|
|
|
|
Application received | | | 8/31/2006 | | |
|
|
|
|