Third Notice BLD | 3/5/2008 | 3/5/2008 | 4/28/2008 | | DONE |
Cathy Brown
|
|
|
This permit finaled on the web by Danielle Groat
|
Second Notice BLD | 1/9/2008 | 1/9/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 12/3/2007 | 1/9/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 12/3/2007 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 10/8/2007 | 10/8/2007 | 10/8/2007 | | DONE |
|
|
|
|
BLD-Final | 9/24/2007 | 9/25/2007 | 9/25/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 9/24/2007 at 9:55:52 AM. Contact: ###-####.
|
Code Occupancy Approval | 9/17/2007 | 9/17/2007 | 9/17/2007 | P | PASS |
Joe R Venneman
|
|
|
|
BLD-Final | 9/13/2007 | 9/14/2007 | 9/14/2007 | P | PART |
Jim Storey
|
|
|
jerel Phone #: ###-#### handrai and gaurdrail ok/pending ele/pw/p&z perms
|
FIRE-Final Inspection | 9/13/2007 | 9/14/2007 | 9/14/2007 | A | PASS |
Forrest France
|
|
|
Correction notice items verified for completion, fire life safety passed.
|
Code Occupancy Approval | 8/1/2007 | 8/1/2007 | 8/1/2007 | P | PASS |
Joe R Venneman
|
|
|
Landscaping meets plan requirements. This was a minor install of trees and sod.
|
BLD-Final | 7/31/2007 | 8/1/2007 | 8/1/2007 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/31/2007 at 3:22:57 PM. Contact: ###-####. office only 1 st floor. handrail guard rail/ dead bolt indactor.
|
FIRE-Final Inspection | 7/30/2007 | 7/31/2007 | 7/31/2007 | A | FAIL |
Forrest France
|
|
|
Missing visual indicator at the keyed locking main entry/exit door, exit sign at the south side of the office area does not function on backup power, three emergency lights in the warehouse area are not functional.
|
BLD-Other | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 7/26/2007 at 3:44:56 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 6/20/2007 | 6/21/2007 | 6/21/2007 | A | PASS |
Jim Storey
|
|
|
dennis; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
|
BLD-Footing | 4/17/2007 | 4/17/2007 | 4/17/2007 | P | PASS |
Jim Storey
|
|
|
rico; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Footing | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | PART |
Jim Storey
|
|
|
Dan ; Phone #: ###-#### Internet Inspection Request from: Stacie Backus core board firestopping ok
|
BLD-Footing | 3/15/2007 | 3/15/2007 | 3/15/2007 | P | PASS |
Jim Storey
|
|
|
lito; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
(F) Reprint permit | | | 3/8/2007 | | |
|
|
|
|
(F) Reprint permit | | | 2/28/2007 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 2/28/2007 | | |
|
|
|
already issued previously
|
Plan assigned to (MLO) | 2/15/2007 | 2/15/2007 | 2/26/2007 | | PASS |
|
|
|
2/26/2007 09:14:08 MLO - activity updated through activity BLDA022 from case BLD06-02547.
|
Routing - PLAN CHECK | 2/16/2007 | | 2/26/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 2/26/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 2/26/2007 | | DONE |
|
|
|
|
Telephone call | | | 2/26/2007 | | DONE |
|
|
|
t/c w marcie at ###-#### - permit ready and fees given
|
Override - Parcel Holds | | | 2/26/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 2/26/2007 | | DONE |
|
|
|
|
MISC ACTIONS | | | 2/14/2007 | | DONE |
|
|
|
contractor came in to inquire on what needs for plan mod, got plan reviewer Mike Otto, told him needs 3 sets plans plan mod app and revised cert of value for the whole project. Per Mike Otto waive $500 submittal fee, will just charge hourly//2/14/07 LEG
|
Plan Modification Accepted | | | 2/14/2007 | | |
|
|
|
Plan modification accepted for Bld06-02547 to add a free standing 5 ton bridge crane submitted on two copies of pages D_87140_01 and D_87140_02; routed to Mike Otto (plan mod app fee of $500.00 waived per Mike Otto)
|
BLD-Foundation | 12/4/2006 | 12/5/2006 | 12/5/2006 | A | PART |
Jim Storey
|
|
|
lito; Phone #: ###-#### Internet Inspection Request from: Patricia Smith need leter from engineer to justfy 8" ft at front west corrner.
|
BLD-Footing | 11/30/2006 | 12/1/2006 | 12/1/2006 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/30/2006 at 2:54:27 PM. Contact: ###-####.
|
(F) Reprint permit | | | 12/1/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 11/30/2006 | | DONE |
|
|
|
|
(F) Reprint permit | | | 11/30/2006 | | |
|
|
|
|
Telephone call | | | 10/27/2006 | | DONE |
|
|
|
lft ms for rick b ###-#### that permit and fees are ready to be picked up but nees GC/RCE and ACHD Fees
|
Permit Ready to Issue | | | 10/27/2006 | | DONE |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/18/2006 | | 10/26/2006 | | PASS |
|
|
|
Called Action Couriers for pick up
|
Routing - PLAN CHECK | 10/26/2006 | | 10/26/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 10/26/2006 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 9/6/2006 | | 10/26/2006 | | PASS |
|
|
|
10/26/2006 13:25:15 MLO - activity updated through activity BLDA022 from case BLD06-02547.
|
Routing - PUBLIC WORKS | 10/20/2006 | | 10/25/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 10/19/2006 | | 10/20/2006 | | PASS |
|
|
|
The row of parking originally approved for the west side of the drive aisle was moved to the east side of the drive aisle. This change still complies with the original Design Review approval.
|
Routing - PLAN CHECK | 10/12/2006 | | 10/18/2006 | | PEND |
|
|
|
PENDING STRUCTURAL REVIEW
|
Plan resubmittals received | | | 10/11/2006 | | |
|
|
|
Received 1 cover transmittal letter, 1 copy of response letter from Architect to plan review comments, 1 copy of response letter HVAC Engineer to Plan review comments, 1 copy of response letter Structural Engineer to Plan review comments, 1 copy of response letter Civil Engineer to Plan review comments, 1 copy of Project start up special inspections, 2 copies of structural calcs, 2 copies of sheets A1, A2, A3P1.1, 3 copies of sheets C1.0, C2.
0, C3.0, S1.0, S2.0, S3.0 and taken to Mike Otto
|
Routing - PLUMBING | 10/3/2006 | | 10/6/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
1st review completed | | | 10/2/2006 | | FAIL |
|
|
|
Failed plumbing, structural and plan check.
|
Routing - PLAN CHECK | 10/2/2006 | | 10/2/2006 | | |
|
|
|
|
Routing - FIRE | 9/28/2006 | | 10/2/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing Off Site - STRUCTURAL | 9/6/2006 | | 9/28/2006 | | FAIL |
|
|
|
called action courier for pickup. corrections sent to architect
|
Plan resubmittals received | | | 9/28/2006 | | |
|
|
|
Received 1 copy of cover tranmittal, 1 copy of Plumbing plan review comments, 3 copies of sheets P1.1 & P1.2 and taken to Mike Otto
|
Plan resubmittals requested | | | 9/28/2006 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 9/26/2006 | | 9/28/2006 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLANNING | 9/25/2006 | | 9/26/2006 | | PASS |
|
|
|
Approved per DRH06-00281 and red line comments.
|
Routing - PLUMBING | 9/14/2006 | | 9/25/2006 | | FAIL |
|
|
|
IBC will require a mop sink, show location and piping. additional cross connection protection may be required on water to shop.
|
Routing - Erosion and Sediment | 9/13/2006 | | 9/14/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 9/8/2006 | | 9/13/2006 | | FAIL |
|
|
|
Per Brian Murphy @ ###-####
GEO-TECH PERC TEST
|
Routing - PLANNING Land Div | 9/6/2006 | | 9/8/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/6/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/6/2006 | | |
|
|
|
|
Application received | | | 8/31/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 8/31/2006 | | |
|
|
|
|