Permit Information
Permit NumberBLD06-02555
StatusFinaled
Name GATEWAY OFFICE BUILDING LLC
Site Address 2215 W STATE ST
Project NameGATEWAY OFFICE BLDG
Customer Number 
ePlanReviewNo
Description
(CONVERT DWELLING TO OFFICE - NO TENANT) To convert a 2,346 sq.ft. one story dwelling with basement (1,535 sq. ft. main floor / 811 sq. ft. basement) to office & associated support uses throughout for compliance with current code, per approved plans and CUP06-00041, DRH06-00093 and DRH06-00311. Separate permit created for parking lot under BLD06-02556. Work includes selective demolition per plans; construction of new exterior accessible ramp, landings and railings; remodel of existing restroom on main level for full accessibility unisex compliance; modify or rebuild stairs and landings at exterior doors and to basement to comply with current code to include handrails with extensions and returns; all exterior doors have been reversed to swing out over landings; to modify existing structural support to carry all new loads and as necessary to accomodate new opening widths and lengths; to alter all areas of the new basement offices to be accessible including all doors leading to and serving within the areas; and upgrade electrical, mechanical & plumbing to meet tenant needs and comply with current adopted codes & ordinances. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD12/11/200712/11/20071/23/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Telephone call  1/23/2008 DONE
tlk to sam langstan regarding the differences in the plum co and his co; I faxed the plm bill from the co and he is supposed to call be back 12:30 pm
Second Notice BLD11/13/200711/13/200712/11/2007 DONE
First Notice has not been responded to.
First Notice 10/16/200711/13/2007 DONE
BLD-Final10/15/200710/16/200710/16/2007APASS
DetailsDave Hannah
PATSY Phone #: ###-#### ok for perm occ
Permanent Occupancy  10/16/2007 DONE
FIRE-Final Inspection10/1/200710/1/200710/1/2007PPASS
DetailsForrest France
Fire life safety is satisfactory, noted two fire extinguishers on site to be installed per review notes and plan annotations sheet A2.2, can be verified at structural final.
Code Occupancy Approval9/28/20079/28/20079/28/2007PPASS
DetailsMichael Garner
site inspection complete - landscaping in compliance with approved plan - PASS
Print Occupancy Form  9/11/2007 DONE
BLD-Conference9/6/20079/7/20079/7/2007ADONE
DetailsDave Hannah
Sam, please call 30 minutes prior; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
BLD-Conference8/15/20078/16/20078/16/2007APASS
DetailsDave Hannah
Sam; Phone #: ###-#### Internet Inspection Request from: Hattie James
BLD-Energy code compliance3/16/20073/19/20073/19/2007APASS
DetailsDave Hannah
Dan; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD-Framing/Rough-in3/19/20073/19/20073/19/2007PPASS
DetailsDave Hannah
Dan; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD-Conference3/8/20073/9/20073/9/2007APASS
DetailsDave Hannah
Sam pls call 30 prior; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD-Conference12/20/200612/20/200612/20/2006PDONE
DetailsDave Hannah
Sam; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
BLD-Conference12/18/200612/20/200612/20/2006ADEFR
DetailsDave Hannah
Sam; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett rescheduled for pm
Issue PAID IN FULL permit  12/7/2006 DONE
Print Occupancy Form  12/6/2006  
Telephone call  12/6/2006 DONE
lft vm with james murray ###-#### that permit and fees are ready to be picked up but needs ACHD/GC/RCE #
Permit Ready to Issue  12/6/2006 DONE
Routing - PLUMBING12/1/2006 12/5/2006 PASS
thermol expantion protection required
Routing - PLAN CHECK12/5/2006 12/5/2006 PASS
Plans back from plumbing review. To permit desk to issue permit.
PLANS/APPL TAKEN TO FRONT DESK  12/5/2006 PASS
Plan assigned to (DRS)9/22/2006 12/5/2006 PASS
12/5/2006 17:16:52 DRS - activity updated through activity BLDA022 from case BLD06-02555.
Routing - PLAN CHECK11/29/2006 12/1/2006 PEND
Inserted resubmittals of 11/30/06 into plans. Red-lined on plans and in attached plan review conditions attached to plans those few remaining items needing to be corrected and will be verified in the field by inspection.Re-routing back to plumbing plan reviewer.
Plan resubmittals received  12/1/2006  
Received 1 cover transmittal, 1 copy of response letter from CSHQA, 2 copies of sheets--G1.0, A2.0, A2.1, A2.3 and taken to Dan Stuart
Plan resubmittals requested  11/29/2006 DONE
E-mailed architect of items of previous review that were not corrected or were still incorrect based on resubmittals provided.
Routing - PLAN CHECK11/9/2006 11/29/2006 FAIL
Resubmittals of 11/22/06 were incomplete or new information provided pointed out continuing non-compliance needing to be addressed. Jim Murray e-mailed copy of items remaining to be addressed for compliance.
Plan resubmittals received  11/22/2006  
Received 1 cover transmittal, 1 response letter from CSHQA (3 pg), 1 page letter from CSHQA for request for code relief, 1 picture of a doorway, 2 copies of sheets G1.0, A2.1, A2.2, A2.3, P2, E1.1 and taken to Dan Stuart
Plan resubmittals requested  11/15/2006 DONE
Additional plan review clarifications and details required. Comments sent to architect.
Routing - PLAN CHECK10/23/2006 11/15/2006 FAIL
Inserted new plans for house conversion into original and reviewed. Additional information details and clarifications are required. Faxed and e-mailed copy of plan review items to architect, Jim Murray.
Plan resubmittals received  11/9/2006  
Received 1 cover transmittal, 1 two pg response letter from Aaron Harrigfeld (CSHQA), 2 copies of Structural Design Calcs, 2 copies of the following sheets--G1.0, A1.1, A2.0, A2.1, A2.2, A3.1, M1, M2, M3, P1, P2, E1.1 and taken to Dan Stuart
1st review completed  10/23/2006 FAIL
Failed plan check.
Routing - FIRE10/19/2006 10/23/2006 PASS
Attached review comments to plans.
Telephone call  10/20/2006 DONE
Aaron Harrigfeld, CSHQA, called to say he had received the comment on plan review and items needed befor the plan review could continue. Told him to follow items noted in dwelling conversion app / checklist to bring buidling into compliance with current code. Energy code per Ch. 1 for increase in fuel or energy requirements. More lighting indicated, new furnace indicated. Any new ducting, new furnace control, water service compliance, is the existing electrical service large enough or will new panel be installed; stairs & landing code compliant, structural evaluation, etc.
Plan resubmittals requested  10/18/2006 DONE
Faxed and e-mailed directions and list of some items not submitted with plans so review cannot be performed until corrected plans are submitted.
Routing - PLAN CHECK10/6/2006 10/18/2006 FAIL
Plan submittals were incomplete. Information required as stated in "How To Convert a Dwelling Into and Office" application & checklist did not accompany the plans and the major items required (stairs, landings, structural review, accessibility, etc) were not included in submittals. Much was called out as design build. Copy of comments of missing data e-mailed and faxed to architect.
Routing - PLANNING10/6/2006 10/6/2006 PASS
Approver per DRH06-00311 Andrea Tuning.
CUP06-00041 Susan Riggs
Routing - Erosion and Sediment10/2/2006 10/6/2006 PASS
ESC permit not required for TI.
Routing - PLUMBING10/4/2006 10/4/2006 FAIL
premise protection required. thermol expantion pretection required. drinking fountain and service sink required. drainage for the water heater required.
Routing - PUBLIC WORKS9/27/2006 10/2/2006 PASS
Routing - PLANNING Land Div9/22/2006 9/27/2006 PASS
Plans ACCEPTED BY PLAN TECH  9/5/2006  
Application received  9/1/2006  
Recd Pcfee & Taken To Pln CK  9/1/2006