Third Notice BLD | 12/11/2007 | 12/11/2007 | 1/30/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 11/19/2007 | 11/19/2007 | 12/11/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/5/2007 | 11/19/2007 | | DONE |
|
|
|
|
PubWorks Occupancy Approval | 11/5/2007 | 11/5/2007 | 11/5/2007 | | DONE |
|
|
|
Signed off permit per Brian Murphy 11/05/07.
|
Permanent Occupancy UNPAID FEE | | | 11/5/2007 | | DONE |
|
|
|
|
BLD-Final | 11/2/2007 | 11/2/2007 | 11/2/2007 | P | PASS |
Tony Young
|
|
|
ross Phone #: ###-#### ok for perm occ. pending others
|
BLD-Final | 11/1/2007 | 11/2/2007 | 11/2/2007 | A | NR |
Tony Young
|
|
|
ross Phone #: ###-####
|
BLD-Final | 10/30/2007 | 10/31/2007 | 10/31/2007 | P | PART |
Tony Young
|
|
|
ross Phone #: ###-#### Note: if possible 3:00 or later temp ok,, need elec final on built ins
|
FIRE-Final Inspection | 10/29/2007 | 10/29/2007 | 10/29/2007 | P | PASS |
Forrest France
|
|
|
C/N is complete, fire life safety inspection passed.
|
Code Occupancy Approval | 10/26/2007 | 10/26/2007 | 10/26/2007 | P | PASS |
Michael Garner
|
|
|
SITE INSPECTION COMPLETE - PARKING LOT AND LANDSCAPING COMPLETED ACCORDING TO APPROVED PLANS/PERMITS - PASS
|
BLD-Conference | 10/26/2007 | 10/26/2007 | 10/26/2007 | P | PART |
Tony Young
|
|
|
ross Phone #: ###-#### extensive conf on final
|
FIRE-Final Inspection | 10/24/2007 | 10/25/2007 | 10/25/2007 | P | FAIL |
Forrest France
|
|
|
Provide building address numbers, remove the manual thumbturn at the door from the SW office, provide signage at the door the to fire riser room.
|
Plan resubmittals received | | | 10/2/2007 | | |
|
|
|
Received letter from Erstad Arch. addressed to Tony Young and staircase details; put in Tony's box
|
BLD-Conference | 10/1/2007 | 10/1/2007 | 10/1/2007 | P | PART |
Tony Young
|
|
|
erstad - conference set up at 2:00 Phone #: ###-#### conf on stairs,, they will send in paper to me for research etc.
|
BLD-Framing/Rough-in | 9/14/2007 | 9/14/2007 | 9/14/2007 | P | PART |
Tony Young
|
|
|
ROSS ceiling grids ok pending trades
|
BLD-Framing/Rough-in | 9/13/2007 | 9/14/2007 | 9/14/2007 | A | CANC |
Tony Young
|
|
|
ross Note: above the ceiling grid Phone #: ###-####
|
BLD-Framing/Rough-in | 8/30/2007 | 8/30/2007 | 8/30/2007 | P | PART |
Tony Young
|
|
|
Ross; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt beam RFI ok,, verified welding S. I. report,, need trades before ceiling tile drop in
|
(F) Reprint permit | | | 6/29/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 6/29/2007 | | DONE |
|
|
|
picked up and paid for plan mod
|
Routing - PLAN CHECK | 6/21/2007 | | 6/21/2007 | | PASS |
|
|
|
PLAN MODIFICATION (Marlene). No additional or new plan review comments. Revised permit wording.
|
Routing - FIRE | 6/19/2007 | | 6/21/2007 | | PASS |
|
|
|
PLAN MODIFICATION
|
PLANS/APPL TAKEN TO FRONT DESK | | | 6/21/2007 | | DONE |
|
|
|
PLAN MODIFICATION
|
Print Occupancy Form | | | 6/21/2007 | | DONE |
|
|
|
|
Telephone call | | | 6/21/2007 | | DONE |
|
|
|
t/c w cheryl pearse at ###-#### - permit ready and fees given
|
Permit Ready to Issue | | | 6/21/2007 | | |
|
|
|
|
Plan assigned to (MYS) | 6/4/2007 | | 6/21/2007 | | PASS |
|
|
|
6/21/2007 12:17:24 MYS - activity updated through activity BLDA022 from case BLD06-02598.
|
BLD-Framing/Rough-in | 6/15/2007 | 6/15/2007 | 6/15/2007 | P | PASS |
Tony Young
|
|
|
Ross, ###-####
|
Override - Parcel Holds | | | 6/15/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 6/15/2007 | | |
|
|
|
|
BLD-Framing/Rough-in | 6/11/2007 | 6/11/2007 | 6/11/2007 | P | PART |
Tony Young
|
|
|
ross - ###-#### ok to one side int walls,, need elec. r/in 1st
|
Override - Parcel Holds | | | 6/11/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 6/4/2007 | | |
|
|
|
|
BLD-Framing/Rough-in | 5/31/2007 | 6/1/2007 | 6/1/2007 | P | PART |
Tony Young
|
|
|
ross; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles remainder of exterior ok to cover
|
Plan Modification Accepted | | | 6/1/2007 | | DONE |
|
|
|
PLAN MODIFICATION accepted for Bld06-02598 to add sound room and adjacent office on first floor and final modular furniture layout. Submitted on pages a0.01, a2.11, a6.11, f2.11, f2.12, m1.10, m1.11, m3.12, m4.11, e2.11, e2.12, e2.21; taken to Marlene Southard
|
BLD-Framing/Rough-in | 5/15/2007 | 5/16/2007 | 5/16/2007 | A | PART |
Dave Hannah
|
|
|
Ross; Phone #: ###-#### Internet Inspection Request from: Victoria Beall second floor east wall ok to cover ext need ok on weld tabs also ext sheeting and sheer on north wall ok
|
BLD-Framing/Rough-in | 5/4/2007 | 5/7/2007 | 5/7/2007 | A | PART |
Tony Young
|
|
|
ross Note: no wall from evelator pit to east; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles north and east exterior walls ok to cover
|
BLD-Framing/Rough-in | 5/1/2007 | 5/1/2007 | 5/1/2007 | P | PART |
Tony Young
|
|
|
Ross; Phone #: ###-#### pan deck ok pending special inspection and engineer approval
|
BLD-Framing/Rough-in | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | CANC |
Tony Young
|
|
|
ross; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Framing/Rough-in | 4/3/2007 | 4/4/2007 | 4/4/2007 | A | PART |
Tony Young
|
|
|
ross; Phone #: ###-#### Internet Inspection Request from: Victoria Beall new int. walls in existing building ok pending trades
|
BLD-Footing | 2/13/2007 | 2/14/2007 | 2/14/2007 | A | PART |
Tony Young
|
|
|
ross; Phone #: ###-#### Internet Inspection Request from: Victoria Beall pending S. I.report,, interior north/south ftg,, north /west exterior ftg,, w i p
|
BLD-Footing | 2/5/2007 | 2/6/2007 | 2/6/2007 | A | PART |
Jim Sly
|
|
|
ROSS; Phone #: ###-#### Internet Inspection Request from: Victoria Beall Wall at gridline B and E .....N. wall and elevator pit footing OK pending special insp, tests, and approvals (MTI)
|
BLD-Footing | 1/26/2007 | 1/26/2007 | 1/26/2007 | P | PART |
Jim Sly
|
|
|
ross; Phone #: ###-#### Internet Inspection Request from: Victoria Beall Called Eng......Bryce Stapley.......Design 2500 PSI Footings OK at gridline E A & B.......and N. (wall) footing OK Note: Need sub grade approval for elevator pit area
|
Override - Parcel Holds | | | 1/16/2007 | | |
|
|
|
|
Telephone call | | | 1/11/2007 | | DONE |
|
|
|
tlk to secretary for andy erstad ###-#### that the mod plan is ready to be picked up and the fee
|
Override - Parcel Holds | | | 1/11/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 1/11/2007 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 1/5/2007 | 1/5/2007 | 1/10/2007 | | PASS |
|
|
|
1/10/2007 14:08:03 MLO - activity updated through activity BLDA022 from case BLD06-02598.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/10/2007 | | DONE |
|
|
|
modification approved
|
Print Occupancy Form | | | 1/10/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/6/2007 | | 1/9/2007 | | PASS |
|
|
|
|
Routing - PLANNING | 1/9/2007 | | 1/9/2007 | | PASS |
|
|
|
|
Plan Modification Accepted | | | 1/4/2007 | | |
|
|
|
Accepted plan modification on Bld06-02598 to add (4) offices on the second floor and add (2) offices and (3) skylights on the first floor. Plans submitted on pages a0.01, a2.11, a2.12, a2.31, a2.32, a2.41, a2.43, a4.11, a6.11, s2.3, s7.4, m1.10, m1.11, m4.11, p1.11, p1.12, e0.0, e2.11, e2.12, e2.21, e2.22, e4.1. Routed to Mike Otto
|
CHANGE ISSUED DATE | | | 12/27/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/27/2006 | | |
|
|
|
|
Telephone call | | | 12/21/2006 | | DONE |
|
|
|
tlk to secretary ###-#### for andy e that permit and fees are ready to be picked up but needs RP and ACHD
|
Permit Ready to Issue | | | 12/21/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/20/2006 | | DONE |
|
|
|
|
Routing - Erosion and Sediment | 12/18/2006 | | 12/19/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 12/19/2006 | | 12/19/2006 | | PASS |
|
|
|
Approved.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/19/2006 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 9/11/2006 | | 12/19/2006 | | PASS |
|
|
|
12/19/2006 14:41:04 MLO - activity updated through activity BLDA022 from case BLD06-02598.
|
Plan resubmittals received | | | 12/18/2006 | | |
|
|
|
Recieved 1 cover transmittal, 2 copies of ESC waiver letter from Andrew Erstad (2 pgs) and taken to Mike Otto
|
Routing - PUBLIC WORKS | 12/18/2006 | | 12/18/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 12/15/2006 | | |
|
|
|
received tealeys land surveying transmittal to mike otto & letter to brain murphy from tealey's land surveying including (4) pages. also received "5" sets of plans 1 sheet each of c1.O, c2.O1, & c2.O2--plans taken to mike otto
|
Routing - PLAN CHECK | 12/13/2006 | | 12/13/2006 | | |
|
|
|
|
Routing - Erosion and Sediment | 12/11/2006 | | 12/12/2006 | | FAIL |
|
|
|
ESC plan failed, does not meet BCC 8-17 requirements. Faxed checklist to PD, copy of checklist is in ESC binder
|
Routing - PLANNING Land Div | 12/6/2006 | | 12/7/2006 | | FAIL |
|
|
|
A Record of Survey is still in process. Do not issue building permit until it has received approval and all documents have been recorded.
|
Plan resubmittals received | | | 12/6/2006 | | |
|
|
|
Recieved 2 copies of sheets C1.0, C2.01, C2.02 and given to Mike Otto
|
Routing - PUBLIC WORKS | 12/6/2006 | | 12/6/2006 | | FAIL |
|
|
|
Requires drainage plan revisions. Contact Brian Murphy at ###-#### or Jim Wylie at ###-####.
|
Plan resubmittals received | | | 12/6/2006 | | |
|
|
|
Received transmittal letter and 3 copies of 1pg.(double sided) erosion and sediment control narrative; taken to Mike Otto
|
Routing - PLAN CHECK | 10/20/2006 | | 10/26/2006 | | PASS |
|
|
|
|
Routing Off Site - STRUCTURAL | 10/20/2006 | | 10/26/2006 | | PASS |
|
|
|
Called Action Couriers for pick up
|
1st review completed | | | 10/20/2006 | | FAIL |
|
|
|
|
Routing - FIRE | 10/17/2006 | | 10/20/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Plan resubmittals received | | | 10/19/2006 | | |
|
|
|
received transmittal letter from erstad architects, a (2) page) letter from stapley eng, and "3" sheets of s2.2-plans taken to mike otto
|
Routing - PLAN CHECK | 10/6/2006 | | 10/17/2006 | | PEND |
|
|
|
pending structural approval
|
Routing Off Site - STRUCTURAL | 9/11/2006 | | 10/17/2006 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 10/17/2006 | | DONE |
|
|
|
structural corrections
|
Routing - PLANNING | 10/4/2006 | | 10/6/2006 | | PASS |
|
|
|
PASS per DRH06-00251 Josh W.
|
Routing - PLUMBING | 9/29/2006 | | 10/4/2006 | | PASS |
|
|
|
ceiling space is a return air plenum, no plastic piping. per plans and 2003 upc.
|
Routing - Erosion and Sediment | 9/29/2006 | | 9/29/2006 | | FAIL |
|
|
|
ESC plan failed, no narrative included with submittal, notified applicant (Andrew Erstad ###-####).
|
Routing - PUBLIC WORKS | 9/26/2006 | | 9/29/2006 | | FAIL |
|
|
|
Revisions required. Contact Brian Murphy ###-####
|
Routing - PLANNING Land Div | 9/11/2006 | | 9/26/2006 | | FAIL |
|
|
|
A Record of Survey has been submitted for this property. However, that Record of Survey has not been approved or recorded yet. As such, do not issued a Building Permit until the ROS has been finalized.
|
Telephone call | | | 9/11/2006 | | DONE |
|
|
|
called Action Couriers for pick up and deliver to outside engineer
|
Plans ACCEPTED BY PLAN TECH | | | 9/11/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 9/11/2006 | | |
|
|
|
|
Application received | | | 9/8/2006 | | |
|
|
|
|