Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD06-02599
StatusFinaled
Name NORTHVIEW CONSTRUCTION CORP
Site Address 650 N ARMSTRONG PL
Project NameWINCO OFFICE
Customer Number04065
ePlanReviewNo
Description
(WINCO FOODS CORPORATE OFFICE - INTERIOR REMODEL) To remodel several areas within an existing 31,680 square, 1 story office building. About 16,000 square feet of area is affected. An A-3 Occupancy breakroom will be created. Work is to include interior nonbearing walls, interior doors, suspended ceilings, and interior finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD8/11/20088/11/20089/4/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 5/1/20088/11/2008 DONE
BLD-Final5/1/20085/1/20085/1/2008ADONE
DetailsCathy Weisshaupt
Final for perm. occ. per Mike Jordan
Permanent Occupancy  5/1/2008 DONE
DetailsCathy Weisshaupt
Print Occupancy Form  5/1/2008 DONE
BLD-Conference4/28/20084/29/20084/29/2008APASS
DetailsMike Jordan
This dosent show completed for final in the computer? it is still under active permits. Phone #: ###-#### Internet Inspection Request from: Nick Downing. Final is ok. No card to sign. Contacted Nick and let him know that this will not show final until he goes to city hall and gets the occ. cert.
BLD-Final2/20/20082/21/20082/21/2008ACANC
DetailsMike Jordan
I recieved fire final today, do you want to walk the job again for the BLD final if so I need to get my prints back from my electricain. Call me and let me know what you want to do? Thanks Nick. Phone #: ###-#### Internet Inspection Request from: Nick Downing. final ok. no card!!
FIRE-Final Inspection2/18/20082/20/20082/20/2008PPASS
DetailsTroy Cobbley
Life safety passed.
FIRE-Final Inspection2/5/20082/5/20082/5/2008PFAIL
DetailsTroy Cobbley
Repair the emergency lights as marked on the city approved plans. Provide current inspections for the fire extinguishers in the breakroom and the computer room.
BLD-Final2/4/20082/5/20082/5/2008APEND
DetailsMike Jordan
I have attained.. APP plans, Review notes, and specialty inspection letter of welds.
30 min heads up and I can meet you down there. Will be ok for perm occ once life/safet y finals. No card to sign.

Thanks Nick Phone #: ###-#### Internet Inspection Request from: Nick Downing
BLD-Conference1/25/20081/28/20081/28/2008ADONE
DetailsMike Jordan
Is this BLD Final outstanding? Can some one call me and confirm BLD Final Status please. Phone #: ###-#### Internet Inspection Request from: Nick Downing. Spoke with Nick and noted to him that no final had been done yet. Contractor to get documents together, and access and will call in for final.
BLD-Framing/Rough-in1/31/20071/31/20071/31/2007PPASS
DetailsMike Jordan
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Interior framed non load bearing wall, phase 3.
BLD-Framing/Rough-in1/17/20071/17/20071/17/2007PPASS
DetailsMike Jordan
rick ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie. Phase b3 interior framing.
BLD-Other1/12/20071/16/20071/16/2007APASS
DetailsMike Jordan
dave - grid ceiling ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Phase 1 and 2 ceiling grids.
BLD-Framing/Rough-in1/9/20071/10/20071/10/2007APASS
DetailsMike Jordan
rick ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Interior framing, non load bearing walls, phase 3.
BLD-Framing/Rough-in12/27/200612/28/200612/28/2006APASS
DetailsMike Jordan
rick ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Interior non load bearing walls in phase 2. ok to cover.
BLD-Framing/Rough-in12/21/200612/21/200612/21/2006PPART
DetailsMike Jordan
Rick; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett. interior non load bearing walls in phase 2. Ok to one side. Needs ri insp. Will call for framing again after ri insp. are complete.
BLD-Conference12/19/200612/19/200612/19/2006PPASS
DetailsMike Jordan
Rick Note: ceiling insp; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett. Phase 1 grid ok, pend. mech. prior to cover.
BLD-Other12/15/200612/18/200612/18/2006APASS
DetailsTom Arcoraci
rick - ceiling grid ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith partial ok
BLD-Conference12/13/200612/14/200612/14/2006APASS
DetailsMike Jordan
Rick; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett. Screws from top track to grid removed. ok to cover.
BLD-Framing/Rough-in12/11/200612/12/200612/12/2006PFAIL
DetailsMike Jordan
dave ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs to remove screws connecting top track of wall to ceiling grid. Needs to brace wall as per approved plans.
BLD-Framing/Rough-in12/7/200612/7/200612/7/2006PPASS
DetailsMike Jordan
rick ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Phase 1 interior walls. Need to add bracing to top of walls and fireblock at top of walls.
Issue PAID IN FULL permit  11/13/2006 DONE
Telephone call  10/27/2006 DONE
tlk to tim perry ###-#### that permit and fees are ready to be picked up but needs GC/RCE #
Permit Ready to Issue  10/27/2006  
Print Occupancy Form  10/26/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/25/2006 DONE
Plan assigned to (CJW)9/22/2006 10/25/2006 PASS
10/25/2006 15:30:30 CJW - activity updated through activity BLDA022 from case BLD06-02599.
Routing - PLAN CHECK10/13/2006 10/25/2006 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  10/20/2006 DONE
Received letter of transmittal,2 response,1 plan review report,2 structural calcs, & 2 copys of sheets A-1,A-2,A-3,P-1,P-2,M-0,M-1,M-2,E-1,E-2,E-3,EC-1,EC-2 taken to Carl W.
Routing - FIRE10/11/2006 10/13/2006 PASS
Attached fire review comments to plans.
1st review completed  10/13/2006 FAIL
Failed plan check.
Routing - PLAN CHECK9/25/2006 10/11/2006 FAIL
The IBC plan review was started on October 10, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS9/22/2006 9/25/2006 PASS
Plans ACCEPTED BY PLAN TECH  9/11/2006  
Application received  9/8/2006  
Recd Pcfee & Taken To Pln CK  9/8/2006 DONE