Permit Information
Permit NumberBLD06-02616
StatusFinaled
Name PETRA INC
Site Address 1405 N MILWAUKEE ST
Project NameFAIRVIEW/MILWAUKEE PLAZA
Customer Number 
ePlanReviewNo
Description
(RCE-1875 PETRA) (FAIRVIEW / MILWAUKEE PLAZA - FACADE REMODEL) This building is fire sprinklered for area increase and for fire area. To remodel the façade (about 967 lineal feet) of an existing 77,058 square foot retail sales strip mall. Structural work includes concrete footings, steel columns, steel beams, epoxy anchors, and knee braces. Other work includes interior nonbearing walls, 2 restrooms accessible to the disabled, storefront doors and windows, concrete slab on grade, new cornices, new coping caps, stucco, and soffits. This is a shell permit only. This permit does not establish a Certificate of Occupancy for any tenant. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. CZC06-00123 **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice 11/2/200910/23/2009 DONE
Second Notice 10/31/200910/23/2009 DONE
First Notice10/9/200910/9/200910/21/2009 DONE
DetailsMike Jordan
BLD-Final10/9/200910/9/200910/9/2009APASS
DetailsMike Jordan
Ron Phone #: ###-####
DOC - Permit Finaled10/9/200910/9/200910/9/2009PPASS
DetailsMike Jordan
All work was completed and inspected. The only fascade work done was at the vanilla finish address and not the entire strip mall.
Telephone call  10/15/2007  
lft ms with ron junke regarding this permit does not meet with project - his values are very low
Third Notice BLD3/21/20073/21/200710/9/2007 DONE
Second Notice has not been responded to.
Telephone call  10/9/2007 DONE
lft vm with ron juhnke about no plm values on cert of value but is on the permit 12:30 pm
Telephone call  10/4/2007 DONE
tlk to adam 2:30 regarding the final values he said that he will being looking at bld05-02719, bld05-03054, bld06-00569 and bld05-2616 will be given to Ron Juhnke
Telephone call  5/2/2007 DONE
call to adam w/ petra, he said he is working on the fv and will send it to us asap
Reopen Permit (ISS)  4/26/2007 DONE
REOPEN PER GEORGE SLANE
Second Notice BLD3/21/20073/21/20074/2/2007 DONE
First Notice has not been responded to.
Second Notice BLD3/8/20073/8/20073/21/2007 DONE
First Notice has not been responded to.
First Notice2/28/20072/28/20073/21/2007 DONE
DetailsMike Jordan
First Notice2/5/20072/5/20073/8/2007 DONE
DetailsMike Jordan
BLD-Final2/27/20072/28/20072/28/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/27/2007 at 4:47:59 PM. Contact: ###-####. All issues have been resolved. Additional restrroms and interior demissing walls to be done when space is leased.
DOC - Permit Finaled2/28/20072/28/20072/28/2007PPASS
DetailsMike Jordan
BLD-Final2/27/20072/27/20072/27/2007PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/27/2007 at 11:07:32 AM. Contact: ###-####. No approved plans on site. Still has elec. permit that is not finaled.
CHANGE STATUS TO (ISS)  2/6/2007  
per george slane reactive this permit not completed yet
BLD-Final2/2/20072/5/20072/5/2007APASS
DetailsMike Jordan
CLINT; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
DOC - Permit Finaled2/5/20072/5/20072/5/2007PPASS
DetailsMike Jordan
Shell and core work complete. Letter of Compliance was issued.
FIRE-Final Inspection2/2/20072/2/20072/2/2007PPASS
DetailsTroy Cobbley
life safety finaled
Telephone call  2/2/2007  
Spoke with Drew from Petra, he told me no mech work here so why on sign off sheet. I spoke with Carl W. and he has restrooms on this scope with exhaust fans and gave initial mech value of $2,200. Drew said this work was picked up by the TI Bld06-02704. Told him he needs to talk to inspector to verify which contractor actually performed the work in the field.
Plan Reviewer's activity  1/24/2007 PASS
Reviewed and approved revised drawings.
Telephone call  1/24/2007 DONE
Called Tony @ ###-#### & Barb woth Petra to let know that plans are ready for pick up///1:17pm BAS
(F) Reprint permit  1/24/2007 DONE
Print Occupancy Form  1/24/2007 DONE
Plan resubmittals received  1/18/2007 DONE
Rec'd 1 cover transmittal - 1 4 pg response letter fromTreasure Valley Engineers to Erstad Architects - 1 structural calculations booket from Treasure Valley Engineers - 3 copies of center plan a2.11, t.i. enlarged plan a2.12, bld/restroom elevations a3.11 - taken to Carl Westfall
BLD-Conference1/16/20071/16/20071/16/2007PDONE
DetailsMike Jordan
clint; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Other11/30/200612/1/200612/1/2006ADONE
DetailsDave Hannah
john Note: dry wall screw inspection; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in11/28/200611/28/200611/28/2006PPASS
DetailsMike Jordan
john low ###-####
Issue PAID IN FULL permit  11/1/2006 DONE
Inspection Record Card- Bld  10/31/2006  
Telephone call  10/31/2006 DONE
lft vm with tim harris ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  10/31/2006  
Routing - PUBLIC WORKS10/27/2006 10/27/2006 PASS
Drinking fountain added.
Routing - PLAN CHECK10/27/2006 10/27/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  10/27/2006 DONE
Routing - PLAN CHECK10/24/2006 10/27/2006 PASS
The drawings were approved after the resubmittal review.
Plan assigned to (CJW)9/22/2006 10/27/2006 PASS
10/27/2006 13:07:53 CJW - activity updated through activity BLDA022 from case BLD06-02616.
Plan resubmittals received  10/26/2006  
received transmittal letter from erstad architects, "2" sets of structural calculations. also "3" sheets each of a2.12, a3.11, & a6.11--plans taken to carl westfall
Routing - Erosion and Sediment10/23/2006 10/24/2006 PASS
ESC waiver request approved with attached conditions.
1st review completed  10/23/2006 FAIL
Failed ESC & Plan Check.
Routing - FIRE10/19/2006 10/23/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK9/26/2006 10/19/2006 FAIL
The IBC plan review was started on October 18, 2006 and was finished the next day. Revised drawings and engineering calculations were required. See the plan review report.
Plan resubmittals received  10/5/2006  
Received transmittal sheet, Erosian and Sediment control application, 1 pg. labeled "waiver request from erosion and sediment control", 2 copies of 1pg. ESC narrative with cover sheet, 2 copies of page a1.11; taken to Carl Westfall
Routing - PLANNING9/26/2006 9/26/2006 PASS
Andrea Tuning CZC06-00123
Routing - Erosion and Sediment9/25/2006 9/26/2006 FAIL
No esc plan waiver or application included in routing package. ESC is required for project. Informed Contractor--EKC.
Routing - PUBLIC WORKS9/22/2006 9/25/2006 PASS
Application received  9/12/2006  
Recd Pcfee & Taken To Pln CK  9/12/2006  
Plans ACCEPTED BY PLAN TECH  9/12/2006