Case Summary (BLD) | | | 4/28/2010 | | DONE |
|
|
|
|
Third Notice BLD | 5/25/2007 | 5/25/2007 | 2/27/2009 | | DONE |
Patricia Smith
|
|
|
Second Notice has not been responded to.
|
Meeting | | | 2/27/2009 | | DONE |
|
|
|
no final cert of value ever received - signed off per RAD
|
Telephone call | | | 10/4/2007 | | DONE |
|
|
|
lft vm with tim wilcomb ###-#### regarding havent recd final values yet since 6/21/2007 9:00 am
|
Second Notice BLD | 5/9/2007 | 5/9/2007 | 5/25/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/19/2007 | 5/9/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/13/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11528 issued 4-13-07 to the Social Security Administration offices.
|
BLD-Final | 4/11/2007 | 4/12/2007 | 4/12/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/11/2007 at 11:14:49 AM. Contact: ###-####. Final ok. All issues resolved.
|
Permanent Occupancy | | 4/12/2007 | 4/12/2007 | | DONE |
|
|
|
|
BLD-Final | 4/6/2007 | 4/10/2007 | 4/10/2007 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/6/2007 at 11:30:44 AM. Contact: ###-####. Needs to install max. occ. load sign (70). Also needs to instal smoke seal on new 20 min door out of reception area into 1hr. corridor.
|
FIRE-Final Inspection | 4/9/2007 | 4/10/2007 | 4/10/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 4/6/2007 | 4/9/2007 | 4/9/2007 | P | FAIL |
Troy Cobbley
|
|
|
Three exit lights did not operate on battery backup.
|
BLD-Final | 2/21/2007 | 2/22/2007 | 2/22/2007 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/21/2007 at 12:53:04 PM. Contact: ###-####. Called and spoke with Collin (gen contr) and noted to him that he still needed otrher trades finaled prior to bldg. final.
|
BLD-Other | 2/1/2007 | 2/2/2007 | 2/2/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/1/2007 at 2:09:55 PM. Contact: ###-####. Reinspection of ceiling grid. grid ok. Phase 1 work.
|
BLD-Other | 2/1/2007 | 2/1/2007 | 2/1/2007 | P | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/1/2007 at 7:58:01 AM. Contact: ###-####. ceiling grid. New grid installed was floating system, Needs to comply with 94 UBC standard 25. systems can not be mixed and matched.
|
BLD-Framing/Rough-in | 1/18/2007 | 1/19/2007 | 1/19/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/18/2007 at 11:47:52 AM. Contact: ###-####. Phase 1 interior non load bearing walls.
|
Issue PAID IN FULL permit | | | 11/7/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/2/2006 | | DONE |
|
|
|
left mess for andy erstad at ###-#### that permit is ready
|
Permit Ready to Issue | | | 11/2/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 11/1/2006 | | DONE |
|
|
|
|
Routing - FIRE | 10/27/2006 | | 10/31/2006 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLAN CHECK | 10/31/2006 | | 10/31/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2006 | | |
|
|
|
|
Plan assigned to (CJW) | 9/25/2006 | | 10/31/2006 | | PASS |
|
|
|
10/31/2006 15:30:41 CJW - activity updated through activity BLDA022 from case BLD06-02638.
|
Routing - PLAN CHECK | 10/16/2006 | | 10/27/2006 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 10/26/2006 | | |
|
|
|
received a letter from erstad architects & a transmittal letter. also "2" sheets each of a2.11, & a3.21--plans taken to carl westfall
|
Routing - FIRE | 10/13/2006 | | 10/16/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architect. Inserted review comments into plans.
|
1st review completed | | | 10/16/2006 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 9/25/2006 | | 10/13/2006 | | FAIL |
|
|
|
The IBC plan review was started on October 12, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 9/25/2006 | | 9/25/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/14/2006 | | |
|
|
|
|
Application received | | | 9/13/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 9/13/2006 | | DONE |
|
|
|
|