Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD06-02638
StatusFinaled
Name JORDAN-WILCOMB CO
Site Address 1249 S VINNELL WAY
Project NameBLM BLDG
Customer Number 
ePlanReviewNo
Description
(RCE-6350 JORDAN WILCOMB CONST.) (SOCIAL SECURITY ADMINISTRATION - LOBBY REMODEL - 1ST STORY) This building is fire sprinklered for area increase. To expand and remodel the reception and customer service area of an existing office tenant space. After the expansion, the customer area will have a floor area of about 1,485 square feet. Work is to include interior nonbearing walls, an accessible service counter, relocated doors, interior finishes, and alterations to the suspended acoustical ceiling system. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  4/28/2010 DONE
Third Notice BLD5/25/20075/25/20072/27/2009 DONE
DetailsPatricia Smith
Second Notice has not been responded to.
Meeting  2/27/2009 DONE
Details
no final cert of value ever received - signed off per RAD
Telephone call  10/4/2007 DONE
lft vm with tim wilcomb ###-#### regarding havent recd final values yet since 6/21/2007 9:00 am
Second Notice BLD5/9/20075/9/20075/25/2007 DONE
First Notice has not been responded to.
First Notice 4/19/20075/9/2007 DONE
Permanent occupancy  4/13/2007 DONE
Perm. Occ. Cert. # 11528 issued 4-13-07 to the Social Security Administration offices.
BLD-Final4/11/20074/12/20074/12/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/11/2007 at 11:14:49 AM. Contact: ###-####. Final ok. All issues resolved.
Permanent Occupancy 4/12/20074/12/2007 DONE
Details
BLD-Final4/6/20074/10/20074/10/2007PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 4/6/2007 at 11:30:44 AM. Contact: ###-####. Needs to install max. occ. load sign (70). Also needs to instal smoke seal on new 20 min door out of reception area into 1hr. corridor.
FIRE-Final Inspection4/9/20074/10/20074/10/2007APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection4/6/20074/9/20074/9/2007PFAIL
DetailsTroy Cobbley
Three exit lights did not operate on battery backup.
BLD-Final2/21/20072/22/20072/22/2007PNR
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/21/2007 at 12:53:04 PM. Contact: ###-####. Called and spoke with Collin (gen contr) and noted to him that he still needed otrher trades finaled prior to bldg. final.
BLD-Other2/1/20072/2/20072/2/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/1/2007 at 2:09:55 PM. Contact: ###-####. Reinspection of ceiling grid. grid ok. Phase 1 work.
BLD-Other2/1/20072/1/20072/1/2007PFAIL
DetailsMike Jordan
Scheduled by a contractor via Hello! on 2/1/2007 at 7:58:01 AM. Contact: ###-####. ceiling grid. New grid installed was floating system, Needs to comply with 94 UBC standard 25. systems can not be mixed and matched.
BLD-Framing/Rough-in1/18/20071/19/20071/19/2007APASS
DetailsMike Jordan
Scheduled by a contractor via Hello! on 1/18/2007 at 11:47:52 AM. Contact: ###-####. Phase 1 interior non load bearing walls.
Issue PAID IN FULL permit  11/7/2006 DONE
Telephone call  11/2/2006 DONE
left mess for andy erstad at ###-#### that permit is ready
Permit Ready to Issue  11/2/2006 DONE
Print Occupancy Form  11/1/2006 DONE
Routing - FIRE10/27/2006 10/31/2006 PASS
Attached updated review comments to plans.
Routing - PLAN CHECK10/31/2006 10/31/2006  
PLANS/APPL TAKEN TO FRONT DESK  10/31/2006  
Plan assigned to (CJW)9/25/2006 10/31/2006 PASS
10/31/2006 15:30:41 CJW - activity updated through activity BLDA022 from case BLD06-02638.
Routing - PLAN CHECK10/16/2006 10/27/2006 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  10/26/2006  
received a letter from erstad architects & a transmittal letter. also "2" sheets each of a2.11, & a3.21--plans taken to carl westfall
Routing - FIRE10/13/2006 10/16/2006 FAIL
Faxed resubmittal items to architect. Inserted review comments into plans.
1st review completed  10/16/2006 FAIL
Routing - PLAN CHECK9/25/2006 10/13/2006 FAIL
The IBC plan review was started on October 12, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS9/25/2006 9/25/2006 PASS
Plans ACCEPTED BY PLAN TECH  9/14/2006  
Application received  9/13/2006  
Recd Pcfee & Taken To Pln CK  9/13/2006 DONE