Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD06-02690
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 11311 W CHINDEN BLVD
Project NameHP #3
Customer Number 
ePlanReviewNo
Description
(HEWLETT PACKARD BLDG #3 - PHASE II UPGRADE - INDUSTRIAL EQUIPMENT PLATFORM)To perform selective demolition of specified HVAC equipment and associated ducts, controls and utilities and at all four corners of Building #3 HP in preparation for expansion of existing corner equipment mezzanine floor area by approximately 375 sq. ft. each; reinstalling existing sunscreen against wall of new build-out. Work includes construction of new reinforced footing and pier, new structural steel columns, floor & roof beamsand strengthening of specific existing columns; new steel deck & concrete overlay at mezzanine level and steel deck with single ply roof membrane; modify specific structural framing to allow new openings for ducts at mezzanine & roof; installation of 4 HVAC units, 4 circulating hot water units and all associated equipment and utilities to make new systems operate; complete all exterior finishes (new & reinstalled) & glazing. Special Inspection is required. This building is fully sprinklered for allowable area increase. Expansion area is not normally occupied, mechanical equipment mezzanine. DRH06-00360. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Print permit w/o conditions  2/2/2010 DONE
Case Summary (BLD)  6/23/2009  
Third Notice BLD12/11/200712/11/200710/22/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD11/13/200711/13/200712/11/2007 DONE
First Notice has not been responded to.
First Notice10/24/200710/24/200711/13/2007 DONE
DetailsJim Sly
BLD-Final10/23/200710/24/200710/24/2007PPASS
DetailsJim Sly
jim Phone #: ###-####
C/C issued
DOC - Permit Finaled10/24/200710/24/200710/24/2007PPASS
DetailsJim Sly
BLD-Framing/Rough-in2/26/20072/28/20072/28/2007APART
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Met with Jim (super).....Walked jobsite......WIP
BLD-Framing/Rough-in12/13/200612/13/200612/13/2006PPART
DetailsJim Sly
jim; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Met with Jim and walked job site.
BLD-Foundation12/6/200612/8/200612/8/2006PPART
DetailsJim Sly
jim - at 2:00 if possible ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
OK pending MTI tests and approvals.
Issue PAID IN FULL permit  11/8/2006 DONE
Telephone call  11/2/2006 DONE
left mess for sam burrows at 3456677 that permit is ready
Routing - PLAN CHECK10/27/2006 11/1/2006 PASS
Resubmittals of 10/26/06 inserted into plans. Routing to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  11/1/2006 PASS
Inspection Record Card- Bld  11/1/2006 DONE
Plan assigned to (DRS)9/29/2006 11/1/2006 PASS
11/1/2006 07:24:44 DRS - activity updated through activity BLDA022 from case BLD06-02690.
Routing - FIRE10/25/2006 10/27/2006 PASS
Attached review comments to plans.
Plan resubmittals received  10/27/2006 DONE
Received 1 letter, 3 review comments and 3 copys of sheets A9.1,S2.02 taken to Dan S.
1st review completed  10/27/2006 FAIL
Failed plan check.
Routing - PLANNING10/20/2006 10/25/2006 PASS
Josh W. DRH06-00360
Plan resubmittals requested  10/20/2006 DONE
E-mailed and faxed review comments to architect.
Routing - PLAN CHECK10/2/2006 10/20/2006 FAIL
Plan review comments faxed and e-mailed to architect for response. Routing plans to planning & fire for review.
Routing - PUBLIC WORKS9/29/2006 10/2/2006 PASS
Application received  9/19/2006  
Plans ACCEPTED BY PLAN TECH  9/19/2006