Permit Information
Permit NumberBLD06-02700
StatusFinaled
Name STATEHOUSE INN
Site Address 981 W GROVE ST
Project NameSTATEHOUSE INN
Customer Number 
ePlanReviewNo
Description
(STATEHOUSE INN - REMODEL ON FLRS 2, 3, 4, & 5) ** PLAN MODIFICATION, 3/30/07. ADDING REMODEL OF ROOM SUITE 516 AS PART OF THIS PERMIT. PERFORM SELECT INTERIOR DEMOLITION TO PREPARE FOR NEW FULLY ACCESSIBLE RESTROOM, BATH AND ACCESSIBLE ROUTE WITHIN SUITE 516. CONSTRUCT NON-COMBUSTIBLE WALLS TO SEPARATE THE RESTROOM / BATH FROM SLEEPING AREA; REPAIR & MAINTAIN 2-HOUR OCCUPANCY SEPARATION WALL BETWEEN NEW RESTROOM /BATH AND MECHANICAL ROOM WITH ALL PENETRATIONS PROTECTED BY APPROVED FIRESTOP ASSEMBLIES; MAINTAIN INTEGRITY OF TWO HOUR CONCRETE FLOOR ABOVE AND BELOW THIS UNIT; INSTALL NEW FINISHES. REMAINING SCOPE OF WORK TO BE AS ORIGINALLY APPROVED.** To replace the suspended ceiling system and lighting fixture's in the existing corridors on the 2nd, 3rd, 4th & 5th floors of the Statehouse Inn. Each area of remodel is 1,724 sq. feet in area, serving the guest rooms on each level. The required exit system (1-hour rated exit corridor & 2 exit enclosure stairways) serving each floor shall be maintained usable at all times. Corridors shall not be used for staging area. Ceiling & lighting components that are demolished shall be removed from the area of demolition as it is removed. The existing sprinkler and alarm systems shall be maintained at all times or as otherwise approved by the Boise City Fire Department. DO NOT ALTER OR TURN OFF the sprinkler and or alarm systems without prior approval by the fire department. A Letter of Compliance is required for final of this permit. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD7/31/20077/31/20078/1/2007 DONE
First Notice has not been responded to.
First Notice7/20/20077/20/20077/31/2007 DONE
DetailsDave Hannah
BLD-Final7/20/20077/20/20077/20/2007PPASS
DetailsDave Hannah
barak - please call 1/2 hr prior to inspection Phone #: ###-####
DOC - Permit Finaled7/20/20077/20/20077/20/2007PPASS
DetailsDave Hannah
FIRE-Final Inspection7/19/20077/20/20077/20/2007APASS
DetailsTroy Cobbley
Life safety passed
PRINT Activities  7/19/2007 DONE
FIRE-Final Inspection7/5/20077/5/20077/5/2007PFAIL
DetailsForrest France
Emergency light at the elevator lobby 5th floor failed to function, one fire door at the 3rd floor west side atrium pair failed to close on general alarm, exit sign at the 2nd floor east side does not illuminate on power fail.
FIRE-Sprinkler Rough-in7/5/20077/5/20077/5/2007PPASS
DetailsForrest France
Required corrections for the corridor fire sprinklers on the 2nd, 3rd, 4th, and 5th levels completed satisfactory.
FIRE-Final Inspection5/23/20075/23/20075/23/2007PFAIL
DetailsForrest France
Missing escutcheons at fire sprinkler heads at various locations in the corridors, some heads are in need of adjustment as the deflector is above or even with the ceiling tile, need to repair emergency lighting at several locations, missing a/v fire alarm notification for ADA room 516.
FIRE-Sprinkler Rough-in5/22/20075/23/20075/23/2007PCANC
DetailsForrest France
barak ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD-Framing/Rough-in4/17/20074/18/20074/18/2007PPASS
DetailsDave Hannah
gordon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover bathroom
BLD-Framing/Rough-in4/12/20074/13/20074/13/2007AFAIL
DetailsDave Hannah
gordon ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith remove sheet rock from ceiling fire stop all pent in walls and floor criling
CHANGE STATUS TO (ISS)  4/4/2007  
already pd for- plan mod
Plan assigned to (DRS)3/29/20073/29/20074/2/2007 PASS
4/2/2007 14:41:36 DRS - activity updated through activity BLDA022 from case BLD06-02700.
Routing - FIRE3/30/2007 4/2/2007 PASS
See attached plan review comments.
Plan Reviewer's activity  4/2/2007 PASS
Plan modification approved with attached comments
Override - Parcel Holds  4/2/2007  
Routing - PLAN CHECK4/2/2007 4/2/2007 PASS
Plan Modification approved as noted on plans and all attached documents & plan review conditions of all agencies.
PLANS/APPL TAKEN TO FRONT DESK  4/2/2007 PASS
Override - Parcel Holds  4/2/2007  
Inspection Record Card- Bld  4/2/2007  
Telephone call  4/2/2007 DONE
left vm for craig at CSHQA ###-#### - permit (plan mod) ready and fees given
Override - Parcel Holds  4/2/2007  
Permit Ready to Issue  4/2/2007  
Override - Parcel Holds  3/30/2007  
Routing - PLAN CHECK3/30/2007 3/30/2007 PEND
Plan modifications reviewed and scope of permit changed and plan review conditions to match modification. Suite 516 was converted from conference room to residential suite under BLD98-03865, plan Sheet a2.15. Routing to fire code analyst.
(F) Reprint permit  3/29/2007  
Plan Modification Accepted  3/29/2007  
plan mod excepted for bld#06-02700 for the redesign A1.3 to demolish existing shower, walls, plumbing, lights & doors. A2.1 replace walls, plumbing, lights, ceiling--routed to Dan Stuart
BLD-Other2/8/20072/8/20072/8/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/8/2007 at 7:26:06 AM. Contact: ###-####. 4th floor ceiling
BLD-Other1/17/20071/18/20071/18/2007APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/15/2007 at 6:37:35 AM. Contact: ###-####.grid ok but need to patch up holes in corr wall
BLD-Other1/16/20071/17/20071/17/2007ACANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/15/2007 at 6:37:35 AM. Contact: ###-####.
BLD-Other1/15/20071/16/20071/16/2007ADEFR
DetailsDave Hannah
Scheduled by a contractor via Hello! on 1/15/2007 at 6:37:35 AM. Contact: ###-####.
BLD-Other12/1/200612/4/200612/4/2006APART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 12/1/2006 at 10:48:05 AM. Contact: ###-####. third floor ceiling grid ok tocover after all other trades ok
BLD-Other11/20/200611/20/200611/20/2006PPART
DetailsDave Hannah
Scheduled by a contractor via Hello! on 11/20/2006 at 9:07:29 AM. Contact: ###-####.second flr ceiling grid souyh half ok
Issue PAID IN FULL permit  11/3/2006  
Telephone call  10/27/2006 DONE
lft vm with craig sl that permit and fees are ready to be picked up but needs GC/RCE
Permit Ready to Issue  10/27/2006  
Plan assigned to (DRS)10/2/2006 10/26/2006 PASS
10/26/2006 13:26:17 DRS - activity updated through activity BLDA022 from case BLD06-02700.
Routing - FIRE10/23/2006 10/26/2006 PASS
Attached review comments to plans.
1st review completed  10/26/2006 PASS
Routing - PLAN CHECK10/26/2006 10/26/2006 PASS
To permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  10/26/2006 PASS
Inspection Record Card- Bld  10/26/2006 DONE
Routing - PLAN CHECK10/2/2006 10/23/2006 PEND
No resubmittals required. Routing to fire code analyst for review. Copy of review e-mailed to architect.
Recd Pcfee & Taken To Pln CK  9/20/2006 DONE
Plans ACCEPTED BY PLAN TECH  9/20/2006  
Application received  9/19/2006