Second Notice BLD | 7/31/2007 | 7/31/2007 | 8/1/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 7/20/2007 | 7/20/2007 | 7/31/2007 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 7/20/2007 | 7/20/2007 | 7/20/2007 | P | PASS |
Dave Hannah
|
|
|
barak - please call 1/2 hr prior to inspection Phone #: ###-####
|
DOC - Permit Finaled | 7/20/2007 | 7/20/2007 | 7/20/2007 | P | PASS |
Dave Hannah
|
|
|
|
FIRE-Final Inspection | 7/19/2007 | 7/20/2007 | 7/20/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
PRINT Activities | | | 7/19/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 7/5/2007 | 7/5/2007 | 7/5/2007 | P | FAIL |
Forrest France
|
|
|
Emergency light at the elevator lobby 5th floor failed to function, one fire door at the 3rd floor west side atrium pair failed to close on general alarm, exit sign at the 2nd floor east side does not illuminate on power fail.
|
FIRE-Sprinkler Rough-in | 7/5/2007 | 7/5/2007 | 7/5/2007 | P | PASS |
Forrest France
|
|
|
Required corrections for the corridor fire sprinklers on the 2nd, 3rd, 4th, and 5th levels completed satisfactory.
|
FIRE-Final Inspection | 5/23/2007 | 5/23/2007 | 5/23/2007 | P | FAIL |
Forrest France
|
|
|
Missing escutcheons at fire sprinkler heads at various locations in the corridors, some heads are in need of adjustment as the deflector is above or even with the ceiling tile, need to repair emergency lighting at several locations, missing a/v fire alarm notification for ADA room 516.
|
FIRE-Sprinkler Rough-in | 5/22/2007 | 5/23/2007 | 5/23/2007 | P | CANC |
Forrest France
|
|
|
barak ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD-Framing/Rough-in | 4/17/2007 | 4/18/2007 | 4/18/2007 | P | PASS |
Dave Hannah
|
|
|
gordon; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover bathroom
|
BLD-Framing/Rough-in | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | FAIL |
Dave Hannah
|
|
|
gordon ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith remove sheet rock from ceiling fire stop all pent in walls and floor criling
|
CHANGE STATUS TO (ISS) | | | 4/4/2007 | | |
|
|
|
already pd for- plan mod
|
Plan assigned to (DRS) | 3/29/2007 | 3/29/2007 | 4/2/2007 | | PASS |
|
|
|
4/2/2007 14:41:36 DRS - activity updated through activity BLDA022 from case BLD06-02700.
|
Routing - FIRE | 3/30/2007 | | 4/2/2007 | | PASS |
|
|
|
See attached plan review comments.
|
Plan Reviewer's activity | | | 4/2/2007 | | PASS |
|
|
|
Plan modification approved with attached comments
|
Override - Parcel Holds | | | 4/2/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 4/2/2007 | | 4/2/2007 | | PASS |
|
|
|
Plan Modification approved as noted on plans and all attached documents & plan review conditions of all agencies.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 4/2/2007 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 4/2/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 4/2/2007 | | |
|
|
|
|
Telephone call | | | 4/2/2007 | | DONE |
|
|
|
left vm for craig at CSHQA ###-#### - permit (plan mod) ready and fees given
|
Override - Parcel Holds | | | 4/2/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 4/2/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 3/30/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 3/30/2007 | | 3/30/2007 | | PEND |
|
|
|
Plan modifications reviewed and scope of permit changed and plan review conditions to match modification. Suite 516 was converted from conference room to residential suite under BLD98-03865, plan Sheet a2.15. Routing to fire code analyst.
|
(F) Reprint permit | | | 3/29/2007 | | |
|
|
|
|
Plan Modification Accepted | | | 3/29/2007 | | |
|
|
|
plan mod excepted for bld#06-02700 for the redesign A1.3 to demolish existing shower, walls, plumbing, lights & doors. A2.1 replace walls, plumbing, lights, ceiling--routed to Dan Stuart
|
BLD-Other | 2/8/2007 | 2/8/2007 | 2/8/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/8/2007 at 7:26:06 AM. Contact: ###-####. 4th floor ceiling
|
BLD-Other | 1/17/2007 | 1/18/2007 | 1/18/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/15/2007 at 6:37:35 AM. Contact: ###-####.grid ok but need to patch up holes in corr wall
|
BLD-Other | 1/16/2007 | 1/17/2007 | 1/17/2007 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/15/2007 at 6:37:35 AM. Contact: ###-####.
|
BLD-Other | 1/15/2007 | 1/16/2007 | 1/16/2007 | A | DEFR |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 1/15/2007 at 6:37:35 AM. Contact: ###-####.
|
BLD-Other | 12/1/2006 | 12/4/2006 | 12/4/2006 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/1/2006 at 10:48:05 AM. Contact: ###-####. third floor ceiling grid ok tocover after all other trades ok
|
BLD-Other | 11/20/2006 | 11/20/2006 | 11/20/2006 | P | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/20/2006 at 9:07:29 AM. Contact: ###-####.second flr ceiling grid souyh half ok
|
Issue PAID IN FULL permit | | | 11/3/2006 | | |
|
|
|
|
Telephone call | | | 10/27/2006 | | DONE |
|
|
|
lft vm with craig sl that permit and fees are ready to be picked up but needs GC/RCE
|
Permit Ready to Issue | | | 10/27/2006 | | |
|
|
|
|
Plan assigned to (DRS) | 10/2/2006 | | 10/26/2006 | | PASS |
|
|
|
10/26/2006 13:26:17 DRS - activity updated through activity BLDA022 from case BLD06-02700.
|
Routing - FIRE | 10/23/2006 | | 10/26/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 10/26/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/26/2006 | | 10/26/2006 | | PASS |
|
|
|
To permit desk to issue.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/26/2006 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 10/26/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/2/2006 | | 10/23/2006 | | PEND |
|
|
|
No resubmittals required. Routing to fire code analyst for review. Copy of review e-mailed to architect.
|
Recd Pcfee & Taken To Pln CK | | | 9/20/2006 | | DONE |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 9/20/2006 | | |
|
|
|
|
Application received | | | 9/19/2006 | | |
|
|
|
|