Permit Information
Permit NumberBLD06-02716
StatusFinaled
Name KREIZENBECK CONSTRUCTORS
Site Address 251 E FRONT ST Unit: 200
Project NameONE FRONT ST-2ND FLR
Customer Number 
ePlanReviewNo
Description
(Kreizenbeck Constructors RCE-764) (SPINK BUTLER EXPANSION - ONE FRONT STREET - 2ND FLR) To remodel an existing office by expanding into an additional 1,405 sq.ft. of vacant area which changes the office tenant space from 5,018 to 6,423 sq.ft. per approved plans. Work to include, selective interior demolition, construction of new interior noncombustible partitions, installation of new suspended ceiling and related lighting, installation of new HVAC ducting, miscellaneous related interior finishes. This building is fully fire sprinklered any alterations or modifications to the sprinkler system shall be installed per NFPA #13 as regulated by the fire department. RMH (PLAN MODIFICATION / 12/20/06 ) TO ADD AN ADDITIONAL 227 SQ FT OFFICE TO TENANT SPACE TO BRING THE TOTAL TENANT SPACE AREA TO 6650 SQ FT. RMH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD3/8/20073/8/20073/14/2007 DONE
First Notice has not been responded to.
First Notice 2/16/20073/8/2007 DONE
Permanent occupancy  2/16/2007 DONE
Perm. Occ. Cert. # 11440 issued 2-16-07 to Spink and Butler (expansion).
BLD-Final2/2/20072/5/20072/5/2007PPASS
DetailsDave Hannah
erin; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
FIRE-Final Inspection2/2/20072/5/20072/5/2007APASS
DetailsForrest France
Correction notice items verified for compliance, fire life safety inspection passed.
Permanent Occupancy 2/5/20072/5/2007 DONE
Details
FIRE-Final Inspection2/1/20072/1/20072/2/2007PFAIL
DetailsForrest France
Need to repair the two exit signs at hall 227 which are not functional on battery backup.
BLD-Final2/1/20072/2/20072/2/2007PCANC
DetailsDave Hannah
Scheduled by a contractor via Hello! on 2/1/2007 at 10:57:17 AM. Contact: ###-####.
BLD-Wall cover12/26/200612/27/200612/27/2006APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 12/26/2006 at 4:09:24 PM. Contact: ###-####.
(F) Reprint permit  12/27/2006  
CHANGE STATUS TO (ISS)  12/26/2006 DONE
picked up and paid for approved plan mod.
(F) Reprint permit  12/26/2006 DONE
Print Occupancy Form  12/21/2006  
Override - Parcel Holds  12/21/2006  
Permit Ready to Issue  12/21/2006 DONE
Telephone call  12/21/2006 DONE
lft vm with erin ###-#### that permit and fees are ready to be picked up - modified
Plan assigned to (R_H)12/19/200612/19/200612/20/2006 PASS
12/20/2006 07:23:11 RMH - activity updated through activity BLDA022 from case BLD06-02716.
Case Summary (BLD)  12/20/2006 DONE
1st review completed  12/20/2006  
PLANS/APPL TAKEN TO FRONT DESK  12/20/2006 DONE
Plan Modification Accepted  12/19/2006  
Plan modification accepted to add office 227 at Southwest corner of expansion space. Change dated 12/11/06, (3). Plans submitted on pages A-1.1, A-1.2; routed to Ron Hill
(F) Reprint permit  12/15/2006  
Issue PAID IN FULL permit  12/6/2006 DONE
Print Occupancy Form  12/1/2006 DONE
Telephone call  12/1/2006 DONE
lft ms with secretary for peter rockwell ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  12/1/2006 DONE
1st review completed  11/30/2006  
PLANS/APPL TAKEN TO FRONT DESK  11/30/2006 DONE
Routing - PLAN CHECK11/16/2006 11/30/2006 PASS
Plan assigned to (R_H)10/2/2006 11/30/2006 PASS
11/30/2006 10:01:13 RMH - activity updated through activity BLDA022 from case BLD06-02716.
Plan resubmittals received  11/29/2006 DONE
received letter of transmittal from glancey rockwell & associates and a letter for ron hill for revised sheets. also received "3" sets of plans including A-1.1, & A-1.2 on each sheet-plans taken to ron hill
Case Summary (BLD)  11/27/2006 DONE
Case Summary (BLD)  11/27/2006 DONE
Routing - FIRE11/14/2006 11/16/2006 PASS
Attached review comments to plans.
1st review completed  11/16/2006 FAIL
Failed plan check.
Routing - PLAN CHECK10/3/2006 11/14/2006 FAIL
Faxed corrections to architect, 11/14/06
Routing - PUBLIC WORKS10/2/2006 10/3/2006 PASS
Pending Assignment by MYS9/26/2006 10/2/2006 DONE
10/2/2006 12:47:43 MYS - activity updated through activity BLDA175 from case BLD06-02716.
Telephone call  9/26/2006 DONE
Called Peter Rockwell on 9/21 & again on 9/26, need mechanical compliance on min. 18"x 24" sheet of paper.
Plans ACCEPTED BY PLAN TECH  9/26/2006  
Application received  9/21/2006  
Recd Pcfee & Taken To Pln CK  9/21/2006