Permit NumberBLD06-02719
StatusFinaled
Name POWELL'S SWEET SHOPPE
Site Address 3064 S BOWN WAY
Project NameBown Crossing Market Place
Customer Number 
ePlanReviewNo
Description
(POWELL'S SWEET SHOPPE - BOWN CROSSING MARKET PLACE BLDG D) To construct a 1,656 sq.ft. confectionary shop per approved plans. Work includes construction of perimeter tenant separation wall for this space (leaving approximately 1,948 sq. ft. of first floor 'shell' undeveloped); to construct framed walls to create an accessible unisex restroom and a back storage / work / office area. As part of the Shell permit (BLD03-02192) plans indicate a 1-hour fire resistive floor assembly (U.L. D919) was constructed between the first floor and future residential units above; supporting columns were to be 1-hour construction (U.L. X528) and exterior walls; and a 1-hour shaft enclosure was / is constructed for mechanical and stair enclosures. These elements shall be maintained during the construction addresssed under this permit. To install non-rated suspended ceiling grid system and add to electrical, mechanical, plumbing, sprinkler and alarms systems to meet tenant needs and comply with current adopted codes and ordinances of Boise City. This building is fully sprinklered. Separate applications, plans, approvals and permits are required for sprinkler and alarm work as required and regulated by the Fire Department. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD2/12/20072/12/20072/13/2007 DONE
Second Notice has not been responded to.
Second Notice BLD2/2/20072/2/20072/12/2007 DONE
First Notice has not been responded to.
First Notice 1/9/20072/2/2007 DONE
Permanent Occupancy 1/9/20071/9/2007 DONE
Details
Permanent occupancy  1/9/2007 DONE
Perm. Occ. Cert. # 11389 issued 1-9-07 to Powell's Sweet Shoppe.
Temporary occupancy  1/8/2007 DONE
Temp. Occ. Cert. # 5509 issued 1-8-07 to Powell's Sweet Shoppe
BLD-Final1/5/20071/5/20071/5/2007PPART
DetailsJim Storey
paul - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith perm final ok pending mech gas pipping insp.
FIRE-Final Inspection1/4/20071/4/20071/4/2007PPASS
DetailsForrest France
Required corrections have been made, fire life safety inspection passed.
BLD-Final12/29/20061/2/20071/2/2007ANR
DetailsJim Storey
paul - please call 1/2 prior to inspection please ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
FIRE-Final Inspection12/29/200612/29/200612/29/2006PFAIL
DetailsForrest France
Missing emergency lighting as indicated on approved plans and per fire code review notes, the sample tube in the duct detector is incorrect.
BLD-Other12/8/200612/8/200612/8/2006PPASS
DetailsJim Storey
paul - note: ceiling grid - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ceilling ok
BLD-Framing/Rough-in11/7/200611/9/200611/9/2006PPART
DetailsJim Storey
paul - please call 1/2 hr prior to inspection ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith framing ok pending remove ele from gyp colum/ verify stair wall above hard lid from south tennet side for fire stopping of vent pipe/ same with mech vent duct.
Issue PAID IN FULL permit  11/3/2006 DONE
Plan assigned to (DRS)10/2/2006 11/2/2006 PASS
11/2/2006 08:02:56 DRS - activity updated through activity BLDA022 from case BLD06-02719.
Routing - PLAN CHECK10/27/2006 11/2/2006 PASS
INSERTED ARCHITES RESUBMITTAL SHEETS AND ATTACHED CLARIFICATION NOTES AND DETAILS PLAN REVIEW. TO PERMIT DESK TO ISSUE.
Plan Reviewer's activity  11/2/2006 DONE
Sent e-mail to owner making him aware of red-lined notes and attached plan review clarifications added to plans to allow issuance of permit without waiting for further details from architect.
PLANS/APPL TAKEN TO FRONT DESK  11/2/2006 PASS
Print Occupancy Form  11/2/2006 DONE
Permit Ready to Issue  11/2/2006 DONE
Telephone call  11/2/2006 DONE
talked to joe at ###-#### is ready
Plan resubmittals received  11/1/2006  
Received 2pg. letter of response, and 2 copies of the following pages: 2, 3, 4, M0.0; taken to Dan Stuart
1st review completed  10/27/2006 FAIL
Failed plan check.
Routing - FIRE10/25/2006 10/27/2006 PASS
IFC Review
Plan resubmittals requested  10/25/2006 DONE
Faxed and e-mailed correction list to architect.
Routing - PLAN CHECK10/6/2006 10/25/2006 FAIL
Plan review comments needing correction or clarification faxed and e-mailed to architect. Routing plans to fire code anlayst.
Routing - PLUMBING10/3/2006 10/5/2006 PASS
approved per plan and 2003 upc
Routing - PUBLIC WORKS10/2/2006 10/3/2006 PASS
Pending Assignment by MYS9/21/2006 10/2/2006 DONE
10/2/2006 14:21:04 MYS - activity updated through activity BLDA168 from case BLD06-02719.
Application received  9/21/2006  
Recd Pcfee & Taken To Pln CK  9/21/2006  
Plans ACCEPTED BY PLAN TECH  9/21/2006