Permit Information
Permit NumberBLD06-02729
StatusFinaled
Name EKC INC
Site Address 981 W GROVE ST
Project NameSTATEHOUSE INN
Customer Number 
ePlanReviewNo
Description
(CHANDLER'S RESTAURANT - STATEHOUSE INN - 1ST FLR) To remodel an existing 9,000 sq. ft. area currently classified for use as a restaurant, bar, coffee-shop and hotel lobby per approved plans. The occupancy uses will remain the same. Work includes selective interior & exterior demolition; construction of new structural concrete footings, steel columns, steel beams and built-up tube steel additions to existing steel beams and masonry shear walls; to maintain and or repair existing fire-resistive construction and provide protection for all new construction of tube steel columns, masonry walls & roof assembly; add structural fill and pour new concrete floor to make entire main floor one level; to frame a new 550 sq. ft. raised wood sleeper floor on top of concrete for new fixed seat dining area; modify existing rated exit corridor and access routes to become non-rated corridor in sprinklered building (sprinkler system to comply with current code for trade-offs); construct new exterior dining areas with openable glass wall sections between inside and exterior; add new main access / egress, double set / double door system with vestibule between and new exterior stairways & railings to new sidewalk level that connects to existing accessible route for the hotel and restaurant areas; upgrade restrooms for accessibility & add one unisex accessible restroom; remodel kitchen area and equipment; install select areas with suspended ceiling/open ceiling patterns; provide new interior finishes, electrical, plumbing, mechanical, sprinkler and alarms systems to meet tenant needs and provide compliance with current adopted codes and ordinances. DRH06-00036 drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD6/6/20086/6/200812/12/2008 DONE
DetailsCathy Brown
Second Notice has not been responded to.
Second Notice BLD4/23/20084/23/20086/6/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 3/7/20084/23/2008 DONE
BLD-Final3/7/20083/7/20083/7/2008PPASS
DetailsTony Young
Pam; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
all ok now,, ok for perm c of o
Permanent Occupancy  3/7/2008 DONE
Temporary occupancy  5/22/2007 DONE
Temp. Occ. Cert. # 5584 issued 5-11-07 to the Chandler's Restaurant.
FIRE-Final Inspection5/11/20075/11/20075/11/2007PPASS
DetailsForrest France
Items on correction notice have been verified for completion at the structural final per D. Hannah. Fire life safety finaled.
BLD-Final5/10/20075/11/20075/11/2007PPART
DetailsDave Hannah
rick; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok for temp occ needs hand rail on ext ramp
BLD-Final5/9/20075/10/20075/10/2007PCANC
DetailsDave Hannah
rick ; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
FIRE-Final Inspection5/10/20075/11/20075/10/2007ACANC
DetailsForrest France
rick - fire life safety ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith Inspection cancelled from web by: Patricia Smith
FIRE-Final Inspection5/9/20075/10/20075/10/2007AFAIL
DetailsForrest France
Provide one additional PFE for the kitchen area and mount the remaining fire extinguishers as discussed, remove manual thumbturn lock at the SE employee restroom, provide missing emergency lighting for the metro coffee shop, remove one exit sign as agreed.
BLD-Other5/4/20075/7/20075/7/2007PPART
DetailsDave Hannah
rick - ceiling; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover
BLD-Other5/1/20075/2/20075/2/2007APART
DetailsDave Hannah
ceiling grid ok to cover
BLD-Other4/30/20075/1/20075/1/2007PCANC
DetailsTom Arcoraci
rick - partial ceiling; Phone #: ###-#### Internet Inspection Request from: Victoria Beall unable to respond in pm
BLD-Wall cover4/20/20074/20/20074/20/2007PPART
DetailsDave Hannah
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover eves
BLD-Framing/Rough-in3/30/20074/2/20074/2/2007PPART
DetailsDave Hannah
Rick; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok to cover walls
BLD-Framing/Rough-in3/22/20073/23/20073/23/2007PPART
DetailsDave Hannah
rick ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith fire proofing of piping ext in 2hr rated ceiling kitchen area ok
BLD-Framing/Rough-in3/1/20073/2/20073/2/2007PPART
DetailsJim Sly
rick ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Waitress, Dining 1 and 2, and Metro..OK to cover...........All fire caulk at floor/ceiling appears OK. (above soffits, and where not visible when drywalled)
BLD-Conference2/22/20072/23/20072/23/2007APASS
DetailsDave Hannah
rick - 10:30 am ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith going over fire protection of floors with arc contractor and subs
BLD-Framing/Rough-in2/13/20072/14/20072/14/2007APART
DetailsJim Storey
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall walls in kitchen ok for cover only/ adressed maintaining ceilling assembly
BLD-Footing1/25/20071/26/20071/26/2007APART
DetailsDave Hannah
rick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok pending mti spec inspection
Telephone call  1/12/2007 DONE
Spoke with Pam and told her that the fees were re-calculated with out the sewer and the plans are ready for pick up///1/12/07 @ 8:05am BAS
Issue PAID IN FULL permit  1/12/2007 DONE
Routing - PLAN CHECK1/11/2007 1/11/2007 PASS
Plans approved by Planning. Approved plans include all red-lined notes there-on and all attached plan reviews of all reviewing agencies as part of the approved plans.Routinbg to permit desk to issue.
PLANS/APPL TAKEN TO FRONT DESK  1/11/2007 PASS
Print Occupancy Form  1/11/2007  
Telephone call  1/11/2007 DONE
Pam from EKC called, told her permit is ready and fees
Permit Ready to Issue  1/11/2007 DONE
Plan assigned to (DRS)10/2/2006 1/11/2007 PASS
1/11/2007 08:51:02 DRS - activity updated through activity BLDA022 from case BLD06-02729.
Routing - PLANNING1/10/2007 1/11/2007 PASS
Approved per DRH06-00361 and CZC06-00167
Routing - PLAN CHECK12/18/2006 1/10/2007 PEND
Business owner and contractor called and said information has been provided to Greg Johnson, Planning. Routing plans back to him for review.
Additional plans submitted  1/10/2007 DONE
Received e-mail copy of new Contractor registration Declaration changing project contractor from Vertical const. to Ellsworth Kincaid Const.(EKC) - RCE-6142. Made the change on the permit and plan review and added them as contractor under people. I am not authorized to delete Vertical Construction under people.
MISC ACTIONS  1/9/2007  
customer came in requesting to know if permit ready. Dan Stuart came out and told them waiting for planning sign off. Also need new contractor registration form per changeing GC's.
Routing - PLANNING12/15/2006 12/18/2006 FAIL
Planning has not received required information.
Meeting  12/15/2006 DONE
Met with Rex Chandler to review items still not submitted and approved in order for the permit to be issued. I have received Electrical Plan resubmittals and Lighting Compliance Certificate but have not had a chance to review and insert into plans. If they are correct, the only pending items will be those of Planning plan review - Copy of ACHD right-of-way agreement and Letter from Boise City Forestry concerning tree removal and planting of new tree.
Telephone call  12/15/2006 DONE
Call from Mark Van Gulik, vertical construction verifying I had received electrical plans required and to let me know he anticipated the letter from forestry on Monday or Tuesday and the ACHD agreement would be available to him on Wednesday of next week.
Routing - PLAN CHECK11/30/2006 12/15/2006 PEND
11/30/06 - Plans back from Greg Johnson, Planning. Plans failed. Required information from original review has not been submitted.
12/14/06 Electrical sheets resubmittals inserted into plans on this date. No further resubmittals required for IBC Code Plan Review. Waiting for ACHD agreement & forestry letter for Planning approval before permit can be issued.
Plan resubmittals received  12/14/2006  
received transmittal from vertical const & "3" sets of plans 1 sheet each of E2.1, EO -- plans taken to dan stuart
Telephone call  11/30/2006 DONE
Called mark Van Gulik to let him know the plans failed in Planning again and that requested information from Planning on 10/10/06 had still not been provided.
Routing - PLANNING11/29/2006 11/30/2006 FAIL
The applicant must provide Design Review staff with information from ACHD allowing encroachment into the right-of-way and from Community Forestry allowing recommending replacement of a tree to be removed.
Routing - PLUMBING11/27/2006 11/29/2006 PASS
floor sinks must not be installed in cabinets, 120 deg. max hot water to lavs and hand sinks in the kitchen. additional cross connection protection may be required.
Telephone call  11/29/2006 DONE
Mark Van Gulik returned my call of 11/28/06. Said he will follow up on electrical plan sheets not submitted. Have not heard anything from architect Craig Slocum & Mark Rossiter on items not submitted on 11/24/06 (Foam data for coolers & freezers & Electrical sheets and lighting compliance certificate.) He will follow up.
Telephone call  11/28/2006 DONE
Call from Mark Van Gulik requesting a separate demolition permit for project while working on plan resubmittals. Submitted new certificate of value for demolition and one for Chandlers Remodel. Issued non-structural demolition permit, BLD06-03368, to Vertical Construction.
Received Certificate of Value  11/28/2006 DONE
New certificate of value provided. Separate demo permit was issued and the $20,000.00 cost of demo was subtracted from CV. New value is shown as $905,000.00
Plan resubmittals requested  11/27/2006  
received from imperial manufacturing "3" copies consisting of (4) pages each--plans taken to dan stuart
Routing - PLAN CHECK11/27/2006 11/27/2006 FAIL
Received information on foam plastic for use in walk in cooler and freezer units showing compliance with Ch. 26 of IBC. Called Mark VanGulik, Vertical Const. contractor for project who has been gathering and submitting information. The Electrical sheets E.o & E2.1 were not provide along with new lighting compliance certificate for actual area and fixtures for this project scope. Mark indicated he would follow up and provide missing items. Routing back to Planning for re-review.
Telephone call  11/24/2006 DONE
Resubmittals of 11/24/06 did not include electrical plan sheets and new lighting compliance certificate. Mark to follow up.
Routing - PLAN CHECK11/13/2006 11/24/2006 FAIL
Plan re-submittals of 11/21/06 did not answer items #16 for foam plastic and coolers and #40 for Lighting Compliance Certificate. Faxed & e-mailed architect. routing plans to plumbing plan review.
Plan resubmittals received  11/21/2006  
Received 2 copies of Plan review response from Vertical Corp(5pgs), 2 copies of plan review comments, 2 copies of Project Start up for Special Inspections, 2 copies of cover & response letter for Tikker Engineering, 2 copies of response to plan review comments #4, 2 copies of supplemental structural calcs, 2 copies of sheets, G1.0, G2.0, A2.1, A3.1, A3.2, A3.3, A3.4, A4.1, A5.2, A6.1, A8.1, A9.1, A10.1, A10.2, M1.0, M2.0, M3.0, P1.0, P2.0, P2.1, S1.1, S2.1, S3.1, S4.1 and taken to Dan Stuart
1st review completed  11/13/2006 FAIL
Routing - FIRE11/7/2006 11/13/2006 PASS
Attached review comments to plans.
Plan resubmittals requested  11/7/2006 DONE
Copies of plan review items needing addressed faxed and e-mailed to Craig Slocum, CSHQA.
Routing - PLAN CHECK10/10/2006 11/7/2006 FAIL
E-mailed and faxed copy of review items needing to be addressed by the design professionals before this project can be reviewed any further. Routing plans to fire code anlyst for review. New plumbing plan resubmittals of 10/20/06 inserted into plans and will re-route to plumbing when fire code analysis is completed.
Plan resubmittals received  10/20/2006  
received transmittal sheet from vertical const. - "3" sets of plans including "3" sheets each of P1.O, P2.O, & P21-plans taken to dan stuart
Routing - PLANNING10/9/2006 10/10/2006 FAIL
The applicant must provide Design Review staff with information from ACHD allowing encroachment into the right-of-way and from Community Forestry allowing recommending replacement of a tree to be removed.
Routing - PLUMBING10/6/2006 10/9/2006 FAIL
need plumbing plans.
Routing - Erosion and Sediment10/5/2006 10/6/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS10/2/2006 10/5/2006 PASS
Pending Assignment by MYS9/22/2006 10/2/2006 DONE
10/2/2006 14:34:00 MYS - activity updated through activity BLDA168 from case BLD06-02729.
Recd Pcfee & Taken To Pln CK  9/22/2006 DONE
Plans ACCEPTED BY PLAN TECH  9/22/2006  
Application received  9/21/2006