Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD06-02733
StatusFinaled
Name JAYO CONSTRUCTION
Site Address 429 E RIDGELINE DR
Project Name 
Customer Number 
ePlanReviewNo
Description
To construct a 4658sq.ft. Two story single family dwelling (3378sq.ft. First floor / 1280sq.ft. Second floor) with a 81sq.ft. Covered front stoop, a 275sq.ft. Covered rear patio, a 140sq.ft. Covered Upper deck, and a 936sq.ft. Attached garage per approved plans, all red-lining, Engineering, and Plan review report. This lot is within the hillside area and is subject to the hillside ordinances. A class "A" roof system and defensible area will be maintained. No Fire Sprinklers required as per Sam Rogers with Fire. R-1A zoning district, building setbacks, and CFH06-32 per Sue Hansen with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection12/9/200912/9/200912/17/2009 DONE
DetailsTony Young
BLD-Conference12/16/200912/16/200912/16/2009PPASS
DetailsTony Young
DOC - Permit Finaled12/16/200912/16/200912/16/2009PPASS
DetailsTony Young
BLD-Final7/16/20087/17/20087/17/2008PPASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: SHANE JAYO-ok to final
BLD-Grading Inspection7/16/20087/16/20087/16/2008ADONE
DetailsTerry Records
The rough grading and drainage has been completed at the above mentioned address. However, reconstruction of a retaining wall and paving of the driveway have not been completed. For this the engineer has recommended a bond of $10,000.00. The bond has been submitted and the the grading and drainage is conditionally approved.
BLD-Final7/15/20087/15/20087/15/2008PNR
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: SHANE JAYO
conf only,, need full hillside signoff,, one listed dated 2/14/08, is not for this house,, also need outside f/p final
BLD-Energy code compliance10/15/200710/15/200710/15/2007PPASS
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: SHANE JAYO
BLD-Framing/Rough-in10/1/200710/2/200710/2/2007PPART
DetailsTony Young
Phone #: ###-#### Internet Inspection Request from: SHANE JAYO
corrections written in/on house,, see Shane, ok to insulate,, need truss specs on e/c insp
BLD-Foundation7/2/20077/3/20077/3/2007PPEND
DetailsTony Young
epoxy/holdowns Phone #: ###-#### Internet Inspection Request from: SHANE JAYO
pending s. i. report
BLD-Foundation4/20/20074/23/20074/23/2007PPART
DetailsTony Young
Bill; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
house foundation walls,, wip
BLD-Footing4/17/20074/18/20074/18/2007APART
DetailsTony Young
bill; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
house ftgs
PubWorks Subgrade Approval4/16/20074/16/20074/16/2007 DONE
Footing subgrade approved by the geotechnical engineer
BLD-Foundation1/30/20071/30/20071/30/2007PPART
DetailsTony Young
bill; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
garage walls ok
BLD-Footing1/25/20071/26/20071/26/2007PPART
DetailsJim Sly
bill; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Garage footing only OK
PubWorks Subgrade Approval1/25/20071/25/20071/25/2007 DONE
Subgrade for the garage footings have been approved by the geotechnical engineer.
Issue PAID IN FULL permit  12/20/2006 DONE
Telephone call  12/19/2006 DONE
t/c w Stephanie at Jayo Const. ###-#### - permit ready and fees given
Permit Ready to Issue  12/19/2006 DONE
Inspection Record Card- Bld  12/18/2006 DONE
Plan assigned to (SRZ)9/22/20069/22/200612/15/2006 PASS
12/15/2006 15:27:05 SRZ - activity updated through activity BLDA022 from case BLD06-02733.
Routing - PLAN CHECK11/21/2006 12/15/2006 PASS
PLANS/APPL TAKEN TO FRONT DESK  12/15/2006 DONE
Case Summary (BLD)  12/13/2006  
Plan Reviewer's activity  12/13/2006 PASS
Plan review pending new stair layout. (SRZ)
Telephone call  12/13/2006 DONE
I let Applicant and Designer know Plan review Pending New stair layout. (SRZ)
Routing - Erosion and Sediment11/17/2006 11/20/2006 PASS
ESC plan approved with attached conditions.
Routing - FIRE11/20/2006 11/20/2006 PASS
No fire sprinklers required (Somerset Ridge #4 sub)
Routing - PLANNING11/16/2006 11/17/2006 PASS
Routing - PUBLIC WORKS11/15/2006 11/16/2006 PASS
Routing - PUBLIC WORKS GRADING11/15/2006 11/15/2006 PASS
Approved as Category 1 by CFH06-00017
Routing - PUBLIC WORKS GRADING9/22/2006 9/22/2006 FAIL
Grading plan cannot be approved until a design for retaining wall at the corner of the house is submitted.
Application received  9/22/2006  
Routing - Addressing9/22/2006 9/22/2006 PASS
Routing - PLANNING9/22/2006    
Routed to TR hillside 9/22