BLD-Final | 8/7/2007 | 8/8/2007 | 8/8/2007 | A | PASS |
Tony Young
|
|
|
ron Phone #: ###-#### Please call to meet with
|
DOC - Permit Finaled | 8/8/2007 | 8/8/2007 | 8/8/2007 | P | PASS |
Tony Young
|
|
|
c of o issued
|
BLD-Grading Inspection | 8/7/2007 | 8/7/2007 | 8/7/2007 | | DONE |
|
|
|
Final grading and drainage approved
|
(F) Reprint permit | | | 7/26/2007 | | DONE |
|
|
|
|
BLD-Final | 7/19/2007 | 7/20/2007 | 7/20/2007 | P | NR |
Tony Young
|
|
|
ron Phone #: ###-#### need hillside, trades?
|
BLD-Energy code compliance | 2/9/2007 | 2/12/2007 | 2/12/2007 | A | PASS |
Tony Young
|
|
|
Ron; Phone #: ###-####
|
BLD-Framing/Rough-in | 2/8/2007 | 2/9/2007 | 2/9/2007 | P | PASS |
Tony Young
|
|
|
Ron; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 2/5/2007 | 2/6/2007 | 2/6/2007 | P | PART |
Tony Young
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Victoria Beall frame ok, setback made ok,, ok to insulate,, still need letter of ok on ftgs/ foundation
|
BLD-Framing/Rough-in | 2/2/2007 | 2/5/2007 | 2/5/2007 | P | PART |
Tony Young
|
|
|
ron; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ext shear ok,, c/n posted, no frame insp. until letter of ok on founation and set backs
|
BLD-Footing | 10/27/2006 | 10/30/2006 | 10/31/2006 | A | FAIL |
Tony Young
|
|
|
Paul; Phone #: ###-#### poured w/out inspection or soils report,, need set back ok'd as poured and need engineer to verify ftg and foundation prior to frame inspection
|
PubWorks Subgrade Approval | 10/31/2006 | 10/31/2006 | 10/31/2006 | | DONE |
|
|
|
Footing subgrade approved
|
BLD-Footing | 10/25/2006 | 10/26/2006 | 10/27/2006 | P | FAIL |
Tony Young
|
|
|
paul - note: please call in the am if possible to set up a time ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith need soils report 1st
|
Permit Ready to Issue | | | 10/25/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 10/25/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/24/2006 | | DONE |
|
|
|
|
Plan assigned to (SRZ) | 9/22/2006 | 9/22/2006 | 10/23/2006 | | PASS |
|
|
|
10/23/2006 15:59:44 SRZ - activity updated through activity BLDA022 from case BLD06-02734.
|
Routing - PLAN CHECK | 10/4/2006 | | 10/23/2006 | | PASS |
|
|
|
|
Telephone call | | | 10/23/2006 | | DONE |
|
|
|
I called Structural Engineer and verified Tall Wall Engineering was completed. Anna at Performance Engineers stated Tall Wall Design was Engineered. (SRZ)
|
Case Summary (BLD) | | | 10/23/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/23/2006 | | DONE |
|
|
|
|
Routing - FIRE | 9/27/2006 | | 10/2/2006 | | PASS |
|
|
|
No fire sprinklers required (Quail Ridge Sub # 6)
|
Routing - Erosion and Sediment | 9/26/2006 | | 9/27/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS GRADING | 9/26/2006 | | 9/26/2006 | | PASS |
|
|
|
Approved as Category 3
|
Routing - PLANNING | 9/26/2006 | | 9/26/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 9/26/2006 | | 9/26/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 9/22/2006 | | 9/22/2006 | | FAIL |
|
|
|
Covered patio encroaches into the rear setback. Site plan is being revised by Strata.
|
Application received | | | 9/22/2006 | | DONE |
|
|
|
|
Routing - Addressing | 9/22/2006 | | 9/22/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 9/22/2006 | | | | |
|
|
|
Routed to TR hillside 9/22
|