Information based on query as of Saturday, August 17, 2024.
Permit Information
Permit NumberBLD06-02765
StatusFinaled
Name MESA CONSTRUCTION
Site Address 3735 N BARBERRY LN
Project Name 
Customer Number 
ePlanReviewNo
Description
(Tony Kubitschek, Mesa Const. RCT-7008) To construct a 2300sq.ft. Two story single family dwelling (1400sq.ft. Main floor / 900sq.ft. Upper floor) with a 42sq.ft. Covered front porch, a 176sq.ft. Covered rear patio, and a 960sq.ft. Attached garage per approved plans, all red-lining, and Plan review report. THE PERMIT HOLDER is responsible to comply with current wall bracing requirements adopted by the city of Boise. R-1C zoning district and building setbacks as per Sue Hansen with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Color Key
Current location of plans being reviewed:  
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
CHANGE STATUS TO (FNL)  8/9/2007 DONE
BLD-Final8/8/20078/8/20078/8/2007PPASS
DetailsTony Young
tony - please call 1/2 hr prior to inspection Phone #: ###-####
BLD-Energy code compliance1/31/20071/31/20071/31/2007PPASS
DetailsTony Young
Phone #: ###-####
BLD-Energy code compliance1/30/20071/31/20071/31/2007ANR
DetailsTony Young
Tony; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in1/26/20071/29/20071/29/2007APASS
DetailsTony Young
tony; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD-Framing/Rough-in1/24/20071/25/20071/25/2007PFAIL
DetailsJim Storey
tony Note: please call 1/2 prior to inspections; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles not done per engineering roof sys.
BLD-Footing11/22/200611/22/200611/22/2006PPASS
DetailsTony Young
Phone #: ###-####
BLD-Footing11/22/200611/22/200611/22/2006APART
DetailsTony Young
Scheduled by a contractor via Hello! on 11/22/2006 at 7:26:12 AM. Contact: ###-####.
forms in the hole,, wip
Issue PAID IN FULL permit  11/21/2006 DONE
Telephone call  10/19/2006  
lft vm with craig ###-#### that permit and fees are ready to be picked up but needs RCE/GC and RP
Permit Ready to Issue  10/19/2006 DONE
Plan Reviewer's activity  10/18/2006 PASS
Plan Review Pending Fire Release. (SRZ) Verified Fire Release with Dave Miller. Old Sub signed off by the city Engineer. (SRZ)
Telephone call  10/17/2006 DONE
I called applicant and let him know permit is pending Fire Release. (SRZ)
Case Summary (BLD)  10/17/2006  
PLANS/APPL TAKEN TO FRONT DESK  10/17/2006 DONE
Inspection Record Card- Bld  10/17/2006 DONE
Plan assigned to (SRZ)9/26/2006 10/17/2006 DONE
Routing - PLANNING9/27/2006 9/27/2006 PASS
Routing - PUBLIC WORKS9/27/2006 9/27/2006 PASS
Routing - Addressing9/26/2006 9/27/2006 PASS
Application received  9/26/2006  
Routing - PLAN CHECK9/27/2006