DOC - Permit Finaled | 8/3/2007 | 8/3/2007 | 8/3/2007 | P | PASS |
Mike Jordan
|
|
|
|
BLD-Final | 8/1/2007 | 8/3/2007 | 8/3/2007 | A | PASS |
Mike Jordan
|
|
|
charlie Phone #: ###-####
|
Routing Walk-In (BLD) | 6/22/2007 | 6/22/2007 | 7/25/2007 | P | PASS |
|
|
|
inspection sequence questions
|
BLD-Conference | 6/22/2007 | 6/22/2007 | 6/25/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 6/13/2007 | 6/14/2007 | 6/14/2007 | A | PASS |
Dave Hannah
|
|
|
charlie ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Energy code compliance | 4/4/2007 | 4/6/2007 | 4/6/2007 | A | PASS |
Dave Hannah
|
|
|
Charlie; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok to cover
|
BLD-Framing/Rough-in | 4/2/2007 | 4/3/2007 | 4/3/2007 | A | PASS |
Dave Hannah
|
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to insulate
|
BLD-Framing/Rough-in | 3/30/2007 | 4/2/2007 | 4/2/2007 | A | NR |
Dave Hannah
|
|
|
tony; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Framing/Rough-in | 3/28/2007 | 3/30/2007 | 3/30/2007 | P | PART |
Dave Hannah
|
|
|
Charlie and sheer wall; Phone #: ###-#### Internet Inspection Request from: Stacie Backus shear walls ext ok ok to cover ext
|
BLD-Conference | 3/14/2007 | 3/19/2007 | 3/19/2007 | A | PASS |
Dave Hannah
|
|
|
Charlie; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Conference | 3/13/2007 | 3/14/2007 | 3/14/2007 | A | DEFR |
Tony Young
|
|
|
Charlie; Phone #: ###-#### Internet Inspection Request from: Stacie Backus phone conf only,, work overload today,, will wait for 425 to come back and re-call
|
BLD-Footing | 12/6/2006 | 12/6/2006 | 12/6/2006 | P | DEFR |
Mike Jordan
|
|
|
charlie - as early as possible ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Stemwall and footing at front of house already placed when on site. No inspection was performed.
|
BLD-Footing | 12/4/2006 | 12/5/2006 | 12/5/2006 | A | PART |
Dave Hannah
|
|
|
CHARLIE nOTE: LATE MORNING IF POSSILBE; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles column ftgs and stem wall back of house ok to pour
|
BLD-Footing | 11/30/2006 | 12/1/2006 | 12/1/2006 | A | PART |
Dave Hannah
|
|
|
charlie - as early as possible ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith colunm ftgs and bumb out on back ok to pour
|
PubWorks Subgrade Approval | 11/15/2006 | 11/15/2006 | 11/15/2006 | | DONE |
|
|
|
The front entry excavation has exposed native undisturbed sediments and construction can proceed in this area.
The three isolated column footing excavations at the rear of the home and a continuous footing at athe southeast corner of the structure have also exposed firm native sediments. However, loose excavation spoils have sloughed into these excavations following recent rains. After these loose materials have been removed, reexposing the firm native sediments, construction can proceed in these areas.
|
Issue PAID IN FULL permit | | | 10/18/2006 | | |
|
|
|
|
Routing Walk-In (BLD) | 10/12/2006 | 10/12/2006 | 10/17/2006 | P | DONE |
|
|
|
10/17/2006 06:46:12 PEP - activity updated through activity BLDA022 from case BLD06-02788.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/17/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/17/2006 | | DONE |
|
|
|
Called and left a message for Thomas that permit is ready & fees///10/17/06 @ 9:45am BAS
|
Permit Ready to Issue | | | 10/17/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/16/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/16/2006 | | |
|
|
|
|
Routing Walk-In (BLD) | 9/29/2006 | 9/29/2006 | 10/12/2006 | P | DONE |
|
|
|
10/12/2006 15:30:08 LEG - activity updated through activity BLDI252 from case BLD06-02788.
|
Routing - Erosion and Sediment | 10/6/2006 | | 10/6/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions. RP information received.
|
Routing - Erosion and Sediment | 9/29/2006 | | 10/2/2006 | | FAIL |
|
|
|
No certified responsible person listed on esc application. Informed applicant to provide this information.
|
Routing Walk-In (BLD) | 9/27/2006 | 9/27/2006 | 9/29/2006 | A | DONE |
|
|
|
9/29/2006 14:36:32 LEG - activity updated through activity BLDI252 from case BLD06-02788.
|
CHANGE STATUS TO (REV) | | | 9/29/2006 | | DONE |
|
|
|
|
Routing Walk-In (Zoning) | 9/27/2006 | 9/27/2006 | 9/27/2006 | A | DONE |
|
|
|
9/27/2006 09:52:16 SMS - activity updated through activity BLDI252 from case BLD06-02788.
|
Routing Walk-In (BLD) | 9/27/2006 | 9/27/2006 | 9/27/2006 | A | FAIL |
|
|
|
|
CHANGE STATUS TO (PND) | | | 9/27/2006 | | |
|
|
|
|
Plan Reviewer's activity | | | 9/27/2006 | | |
|
|
|
met with possible glazing supplier with egress questions, plans show existing non complying egress windows from the basement area where the proposed addition is to be overhanging this area. I have notified the architect of the problem.
|
Application received | | | 9/27/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 10/6/2006 | | | | |
|
|
|
|