Second Notice BLD | 3/8/2007 | 3/8/2007 | 3/13/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/20/2007 | 3/8/2007 | | DONE |
|
|
|
|
BLD-Final | 2/20/2007 | 2/20/2007 | 2/20/2007 | P | PASS |
Jim Storey
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok final bld
|
Permanent Occupancy | | 2/20/2007 | 2/20/2007 | | DONE |
|
|
|
|
Permanent occupancy UNPAID FEE | | | 2/20/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11442 issued 2-20-07 to My Girlfriend's Kitchen in the Bown Crossing Bldg.
|
BLD-Final | 2/15/2007 | 2/15/2007 | 2/15/2007 | P | PART |
Jim Storey
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt temp.ok need spreader bars or clips on grid.
|
FIRE-Final Inspection | 2/14/2007 | 2/14/2007 | 2/14/2007 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
BLD-Framing/Rough-in | 1/5/2007 | 1/5/2007 | 1/5/2007 | P | PART |
Jim Storey
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles walls only/ shaft voids by plm/ele check at next insp.
|
Print Occupancy Form | | | 12/14/2006 | | |
|
|
|
|
Telephone call | | | 12/14/2006 | | |
|
|
|
called Vertical const. ###-#### to tell them permit is ready and fee, Amanda took message for Raylene to call me back because she won't be in until 11am//12/14/06 9:02am LEG
|
Permit Ready to Issue | | | 12/14/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 12/14/2006 | | DONE |
|
|
|
|
Plan assigned to (M_P) | 11/1/2006 | 11/1/2006 | 12/13/2006 | | PASS |
|
|
|
12/13/2006 16:39:20 M_P - activity updated through activity BLDA022 from case BLD06-02830.
|
Routing - PLAN CHECK | 12/8/2006 | | 12/13/2006 | | |
|
|
|
Routing to P.W. for the addition of a drinking fountain.
|
Routing - PUBLIC WORKS | 12/13/2006 | | 12/13/2006 | | PASS |
|
|
|
To review the installation of the drinking fountain.
|
Routing - PLAN CHECK | 12/13/2006 | | 12/13/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/13/2006 | | DONE |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 12/13/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 12/13/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/1/2006 | | 12/8/2006 | | FAIL |
|
|
|
Second review complete, sent correction report to the architect requesting additional information to be submitted for further review priro to issuing permit.
|
Routing - PUBLIC WORKS | 11/30/2006 | | 12/1/2006 | | PASS |
|
|
|
|
Routing - PLUMBING | 11/27/2006 | | 11/28/2006 | | PASS |
|
|
|
big dipper grease trap must be indirectly wasted, dishwasher must not exceed flow rate of the big dipper, food prep sink KS-1 must be indirectly wasted.
|
Routing - PLAN CHECK | 11/14/2006 | | 11/27/2006 | | |
|
|
|
Routing to P.W., Plumbing.
|
Plan resubmittals received | | | 11/21/2006 | | |
|
|
|
Received 1pg. response letter, and two copies of the following: C, A-1.01, A-3.02, A-4.01, E-2.01, P-101, P-102, P-601, P-901; taken to Mike Phillips
|
1st review completed | | | 11/14/2006 | | FAIL |
|
|
|
Failed Public Works, Plumbing and Plan Check.
|
Routing - FIRE | 11/8/2006 | | 11/14/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 10/18/2006 | | 11/8/2006 | | FAIL |
|
|
|
Plan review completed, sent correction report to the archiect requesting additional information to be submitted for further review prior to issuing permit.
|
Plan assigned to (DRS) | 10/10/2006 | | 11/1/2006 | | |
|
|
|
Assigned to Mike Phillips
|
Routing - PLUMBING | 10/13/2006 | | 10/18/2006 | | FAIL |
|
|
|
show piping to hand sink required by the health department. complete public works pretreatment review prior to plumbing review. 120 deg. max hot water to public lavs and hand sinks.
|
Routing - PLANNING | 10/11/2006 | | 10/13/2006 | | PASS |
|
|
|
Sarah Schafer DRH03-00034
|
Routing - PUBLIC WORKS | 10/10/2006 | | 10/11/2006 | | FAIL |
|
|
|
OUTSIDE GREASE INTERCEPTOR TO MEET SUITABLE/ADEQUATE REQUIREMENTS CONTACT WALT B. AT ###-####
|
CHANGE STATUS TO (REV) | | | 10/5/2006 | | |
|
|
|
New Plans submitted 10-5-06 so permit was re-opened///DLD
|
Recd Pcfee & Taken To Pln CK | | | 10/5/2006 | | DONE |
|
|
|
|
Application received | | | 10/2/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/2/2006 | | |
|
|
|
Did not see any load calcs ?
|
VOIDED CHANGE STATUS | | | 10/2/2006 | | DONE |
|
|
|
permit voided as we need Arch & eng stamped plans check backed out and permit voided///dld
|