Permit Information
Permit NumberBLD06-02833
StatusFinaled
Name IDAHO POWER COMPANY
Site Address 950 W BANNOCK ST Unit: 300
Project Name10TH & BANNCOK
Customer Number 
ePlanReviewNo
Description
(RCE-8247 THE CHRISTENSEN CORPORATION) (IDAHO POWER COMPANY - BANNER BANK - STE 300) This building is fire sprinklered because it is a high-rise. To construct a whole floor (15,542 square feet) office tenant space on the 3rd Story of a high-rise building. Work is to include interior Nordwall demountable nonbearing partitions, a 2-hr vestibule at the existing 2-hr stairway enclosure, a restroom accessible to the disabled, a delayed egress lock, doors, millwork, and finishes. The access floor system and the suspended ceilings were installed under permit BLD05-02939. The shell and core, including the core restrooms, were constructed under permit BLD04-02348. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  11/6/2015 DONE
Third Notice BLD5/25/20075/25/20071/18/2008 DONE
DetailsHattie E James
Second Notice has not been responded to.
Second Notice BLD5/9/20075/9/20075/25/2007 DONE
First Notice has not been responded to.
First Notice 4/23/20075/9/2007 DONE
Permanent occupancy  4/23/2007 DONE
Perm. Occ. Cert. # 11540 issued 4-23-07 to the Idaho Power Company.
BLD-Final1/2/20071/2/20071/2/2007PPASS
DetailsDave Hannah
###-#### tucker (call for access)ok for perm occ
Permanent Occupancy 1/2/20071/2/2007 DONE
Details
BLD-Final12/27/200612/28/200612/29/2006AFAIL
DetailsDave Hannah
tucker - please call for access ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith need to fire stop holes in floor
FIRE-Final Inspection12/21/200612/21/200612/21/2006PPASS
DetailsForrest France
Fire life safety passed final field inspection.
BLD-Framing/Rough-in12/5/200612/6/200612/6/2006APASS
DetailsDave Hannah
mario - 3rd floor ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in11/14/200611/14/200611/14/2006PPART
DetailsDave Hannah
mario; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok to hang wallsnew rest room
PLANS/APPL TAKEN TO FRONT DESK  11/8/2006 DONE
Print Occupancy Form  11/8/2006 DONE
Telephone call  11/8/2006 DONE
lft vm with gary christensen ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  11/8/2006  
Issue PAID IN FULL permit  11/8/2006 DONE
Plan assigned to (CJW)10/11/2006 11/8/2006 PASS
11/8/2006 10:16:26 CJW - activity updated through activity BLDA022 from case BLD06-02833.
Routing - PLAN CHECK11/1/2006 11/8/2006 PASS
Drawings approved after resubmittal review.
Plan resubmittals received  11/3/2006  
Received 1 transmittal, 1 comments & 2 copys of sheets G-01,A-103,AF-103,AC-103,A-301,A401 taken to Carl W.
Routing - FIRE10/31/2006 11/1/2006 PASS
Attached review comments to plans.
1st review completed  11/1/2006 FAIL
Failed plan check.
Routing - PLAN CHECK10/11/2006 10/31/2006 FAIL
The IBC plan review was started on October 30, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS10/11/2006 10/11/2006 PASS
Pending Assignment by MYS10/2/2006 10/11/2006 DONE
10/11/2006 11:46:20 MYS - activity updated through activity BLDA172 from case BLD06-02833.
Plans ACCEPTED BY PLAN TECH  10/3/2006  
Application received  10/2/2006