Third Notice BLD | 10/1/2007 | 10/1/2007 | 11/6/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Third Notice BLD | 10/1/2007 | 10/1/2007 | 11/6/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Third Notice BLD | 10/1/2007 | 10/1/2007 | 11/6/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Third Notice BLD | 10/1/2007 | 10/1/2007 | 11/6/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 7/31/2007 | 7/31/2007 | 10/1/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
Second Notice BLD | 7/31/2007 | 7/31/2007 | 10/1/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
PubWorks Occupancy Approval | 9/20/2007 | 9/20/2007 | 9/20/2007 | | DONE |
|
|
|
|
First Notice | 7/17/2007 | 7/17/2007 | 7/31/2007 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 7/16/2007 | 7/17/2007 | 7/17/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/16/2007 at 4:47:38 PM. Contact: ###-####.
|
DOC - Permit Finaled | 7/17/2007 | 7/17/2007 | 7/17/2007 | P | PASS |
Mike Jordan
|
|
|
All required signatyres on card. Letter of compliance issued.
|
Code Occupancy Approval | 7/13/2007 | 7/13/2007 | 7/13/2007 | P | PASS |
Scott M.Brown
|
|
|
ALL IN AS REQUIRED FINAL SIGNED
|
FIRE-Final Inspection | 7/12/2007 | 7/13/2007 | 7/13/2007 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Other | 6/19/2007 | 6/20/2007 | 6/20/2007 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 6/19/2007 at 3:49:23 PM. Contact: ###-####. ceiling grid.
|
BLD-Energy code compliance | 6/4/2007 | 6/4/2007 | 6/4/2007 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 6/1/2007 | 6/4/2007 | 6/4/2007 | A | PASS |
Mike Jordan
|
|
|
|
BLD-Framing/Rough-in | 5/31/2007 | 6/1/2007 | 6/1/2007 | P | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 5/31/2007 at 11:52:40 AM. Contact: ###-####. ok to one side.
|
Override - Parcel Holds | | | 5/31/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 5/31/2007 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 4/9/2007 | 4/10/2007 | 4/10/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/9/2007 at 1:13:07 PM. Contact: ###-####. pre-engineered bldg. Needs special insp. on bolting.
|
BLD-Foundation | 2/16/2007 | 2/16/2007 | 2/16/2007 | P | FAIL |
Mike Jordan
|
|
|
###-#### jason. Perimeter stemwalls. Vert. reinforcement for pedestals not installed. Contractor to get RFI from structural engineer for depth on dowells and have special insp. for epoxy of missing verts. Also will need to install #4 ties at 6 inches on center as per approved plan.
|
BLD-Footing | 2/13/2007 | 2/14/2007 | 2/14/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/13/2007 at 11:42:37 AM. Contact: ###-####. Perimeter footing. Noted clearance issues and rebar not tied sufficiently. Special insp. to verify compliance. Contractor is having surveyor double check elev.
|
(F) Reprint permit | | | 12/27/2006 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 12/22/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/5/2006 | | DONE |
|
|
|
left mess that permit is ready
|
Inspection Record Card- Bld | | | 11/7/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/7/2006 | | |
|
|
|
tlk to cornel larsen ###-#### that permit and fees are ready to be picked up but needs ACDH/RP
|
Permit Ready to Issue | | | 11/7/2006 | | DONE |
|
|
|
|
Routing - PLANNING | 11/3/2006 | | 11/6/2006 | | PASS |
|
|
|
DRH06-00025 Sarah Schafer, CUP05-00075 Cody Riddle
Okay per CUP requirements. Routed to Greg Johnson for DR approval on 10/18. CER
Approved per DRH06-00025
|
Routing - PLAN CHECK | 11/6/2006 | | 11/6/2006 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/6/2006 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 10/3/2006 | | 11/6/2006 | | PASS |
|
|
|
11/6/2006 16:23:32 JCM - activity updated through activity BLDA022 from case BLD06-02843.
|
Routing - PLUMBING | 11/2/2006 | | 11/3/2006 | | PASS |
|
|
|
pass again
|
Plan Reviewer's activity | | | 11/2/2006 | | PASS |
|
|
|
Plans reviewed and approved for structural and nonstructural revisions. JCM
|
Routing - PUBLIC WORKS | 11/2/2006 | | 11/2/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 10/31/2006 | | 11/2/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/1/2006 | | |
|
|
|
Received 1 pg response from Larson Architecs, 1 pg hardware schedule for building a, 1 pg hardware schedule for building c, 2 copies of the following sheets--A-1, A-3, A-10, A-13, P-1, P-3, P-5 and taken to John Menard
|
1st review completed | | | 10/31/2006 | | FAIL |
|
|
|
Failed plan check, structural and planning.
|
Routing - PLUMBING | 10/31/2006 | | 10/31/2006 | | PASS |
|
|
|
no tenant. drinking fountain will be required at that time.
|
Routing - FIRE | 10/27/2006 | | 10/31/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Routing - PLAN CHECK | 10/20/2006 | | 10/27/2006 | | FAIL |
|
|
|
John Menard
|
Plan resubmittals requested | | | 10/27/2006 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Plan resubmittals received | | | 10/23/2006 | | |
|
|
|
Received 1pg. letter of response from Larson Architects, 1pg. letter of response from Pinnacle Engineers, 3 copies of page S-0; taken to John Menard
|
Plan resubmittals requested | | | 10/19/2006 | | DONE |
|
|
|
Faxed the architect a copy of the comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLANNING | 10/17/2006 | | 10/19/2006 | | FAIL |
|
|
|
DRH06-00025 Sarah Schafer, CUP05-00075 Cody Riddle
The applicant has complied with site specific conditions, but must submit revised drawing to Design Review showing revisions. GJ
|
Routing Off Site - STRUCTURAL | 10/4/2006 | | 10/18/2006 | | FAIL |
|
|
|
Received a faxed comment list from the consulting structural engineer requesting revisions. JCM
|
Routing - PLUMBING | 10/13/2006 | | 10/17/2006 | | FAIL |
|
|
|
a drinking fountain is required, show location and piping.
|
Routing - Erosion and Sediment | 10/11/2006 | | 10/13/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 10/6/2006 | | 10/11/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 10/5/2006 | | 10/6/2006 | | PASS |
|
|
|
|
Routing - Addressing | 10/6/2006 | | 10/6/2006 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/5/2006 | | |
|
|
|
|
Telephone call | | | 10/4/2006 | | DONE |
|
|
|
called Action couriers to pick up plans and deliver to AHJ Eng.
|
Application received | | | 10/3/2006 | | |
|
|
|
|
Pending Assignment by MYS | 10/3/2006 | | 10/3/2006 | | DONE |
|
|
|
10/3/2006 13:36:08 JCM - activity updated through activity BLDA166 from case BLD06-02843.
|