Permit Information
Permit NumberBLD06-02862
StatusFinaled
Name EXCELSIOR CONSTRUCTION CO
Site Address 11818 W JOPLIN RD
Project Name 
Customer Number 
ePlanReviewNo
Description
(Boise City Waste Water Treatment Plant - Office Addition) - To construct a 1858 sq. ft. TYpe VB one story addition to the west side of the existing office building. Other work includes all site improvements, paving and landscaping per approved plans and attachments. mlo
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/22/2008 DONE
Second Notice BLD9/13/20079/13/200710/1/2007 DONE
First Notice has not been responded to.
Second Notice BLD9/13/20079/13/200710/1/2007 DONE
First Notice has not been responded to.
Second Notice BLD9/13/20079/13/200710/1/2007 DONE
First Notice has not been responded to.
First Notice 8/20/20079/13/2007 DONE
First Notice 8/20/20079/13/2007 DONE
First Notice 8/20/20079/13/2007 DONE
Permanent Occupancy  8/20/2007 DONE
BLD-Final8/1/20078/1/20078/1/2007PPASS
DetailsJim Sly
chris Phone #: ###-####
OK for Perm Occ.
BLD-Final7/30/20077/30/20077/30/2007PFAIL
DetailsTony Young
chris Phone #: ###-####
need plans,,
FIRE-Final Inspection5/16/20075/16/20075/16/2007PPASS
DetailsForrest France
Life safety inspection passed, noted missing door hardware to be installed prior to structural final.
BLD-Energy code compliance3/23/20073/26/20073/26/2007PPASS
DetailsJim Sly
chris - insulation ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in3/22/20073/23/20073/23/2007APASS
DetailsMike Jordan
chris; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok to insul.
BLD-Framing/Rough-in2/26/20072/26/20072/26/2007PPASS
DetailsJim Sly
chris; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in2/20/20072/21/20072/21/2007APART
DetailsJim Sly
chris; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Shear OK
BLD-Foundation2/6/20072/7/20072/7/2007APASS
DetailsJim Sly
chris; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Foundation1/25/20071/26/20071/26/2007PPASS
DetailsJim Sly
chris; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Foundation1/25/20071/25/20071/25/2007PPART
DetailsJim Sly
chris; Phone #: ###-#### Internet Inspection Request from: Darla Downs
OK pend STRATA tests and Special insp by Rick Cummings.
BLD-Foundation1/24/20071/25/20071/25/2007ACANC
DetailsJim Sly
chris; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Issue PAID IN FULL permit  1/16/2007  
Telephone call  12/21/2006 DONE
tlk to gentlemanfor Russell Phillips ###-#### that permit and fees are ready to be picked up but needs RCE/GC, RP and ACHD
Telephone call  11/27/2006 DONE
tlk to gentlemanfor Russell Phillips ###-#### that permit and fees are ready to be picked up but needs RCE/GC, RP and ACHD
Permit Ready to Issue  11/27/2006 DONE
Print Occupancy Form  11/22/2006 DONE
PLANS/APPL TAKEN TO FRONT DESK  11/21/2006 DONE
Plan assigned to (MLO)10/4/2006 11/21/2006 PASS
11/21/2006 08:16:55 MLO - activity updated through activity BLDA022 from case BLD06-02862.
Routing - PLAN CHECK11/9/2006 11/20/2006 PASS
Routing - PLANNING11/20/2006 11/20/2006 PASS
approved per CZC06-00216
Plan resubmittals received  11/9/2006  
Received 1pg. response letter and two copies of pages 1 - 22, 1pg. response letter for Structural Review and three copies of pages 4 and 11, two project manuals; taken to Mike Otto
Routing - FIRE10/26/2006 10/30/2006 PASS
Attached review comments to plans.
1st review completed  10/30/2006 FAIL
Failed Planning and plan check.
Routing - PLAN CHECK10/30/2006 10/30/2006  
Routing - PLAN CHECK10/20/2006 10/26/2006 FAIL
corrections sent to architect
Plan resubmittals requested  10/26/2006 DONE
IBC corrections
Routing - PLANNING10/17/2006 10/19/2006 FAIL
The proposed addition will need conditional use approval through the Planning Department.
Routing - PLUMBING10/10/2006 10/17/2006 PASS
per plans and 2003 upc.
Routing - Erosion and Sediment10/10/2006 10/10/2006 PASS
ESC plan approved with attached conditions.
Routing - PUBLIC WORKS10/5/2006 10/10/2006 PASS
Routing - Addressing10/6/2006 10/6/2006 PASS
Plan resubmittals received  10/6/2006  
Received transmittal sheet, letter to Brian Murphy from EHM engineers, 3 copies of page 2 of 22 (Erosion & Sediment Control Plan), and 3 copies of page 3 of 22 (Archtiectural Site Plan & Demo Plan); gave them to Louise W. to put with rest of plans
Routing - PLANNING Land Div10/4/2006 10/5/2006 PASS
Plans ACCEPTED BY PLAN TECH  10/4/2006 DONE
Plan routing begun/NEW & ADDTN  10/4/2006  
Application received  10/4/2006  
Pending Assignment by MYS10/4/2006 10/4/2006 DONE
10/4/2006 13:23:54 JCM - activity updated through activity BLDA174 from case BLD06-02862.
(F) Reprint permit  10/4/2006 DONE