(213 & 215 S Latah St)"NO CONTRACTOR REGISTRATION PROVIDED. APPLICANT CERTIFIES EXEMPTION PER IDAHO STATUTE 54-5205". THIS STRUCTURE IS BEING BUILT TO ONLY MEET DUPLEX STANDARDS AND NOT TO BE SOLD AS INIVIDUAL UNITS. To construct a 2968sq.ft. Two story Duplex. Each unit is a three bedroom, Two and a quarter bathroom unit. Unit A is a 1488sq.ft. (752sq.ft. First floor / 736sq.ft. Second floor) with a 481sq.ft. Attached garage, and a Trellis covered front porch. Unit B is a 1480sq.ft. (776sq.ft. First floor / 704sq.ft. Second floor) with a 131sq.ft. Covered front porch, and a 481sq.ft. Attached garage. All per approved plans, all red-lining, and Plan review report. R-2 Zoning district, building setbacks, and CAA06-257 per A. Tuning with Planning and Zoning. (SRZ)
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/13/200711/13/200711/13/2007PPASS
DetailsTom Arcoraci
zane - please call for access Phone #: ###-####
DOC - Permit Finaled11/13/200711/13/200711/13/2007PPASS
DetailsTom Arcoraci
Code Occupancy Approval11/8/200711/8/200711/8/2007PPASS
DetailsDena Gambrel
11-8-07 Passed. Per Cody Riddle, he approved the landscape that is currently there.
Code Occupancy Approval10/23/200710/23/200710/23/2007PFAIL
DetailsDena Gambrel
10-23-07 Correction Notice Issued. Need approved landscape plan for what is currently planted. (plans called for 5 trees in back, there are only 2; plans called for planter beds on the north and south sides of driveway in front, there is grass; no fence indicated on the plans, there is a fence in the back between the two units of the duplex.
BLD-Final10/16/200710/16/200710/16/2007PNR
DetailsTom Arcoraci
zane Note: call for code Phone #: ###-####
BLD-Energy code compliance5/7/20075/7/20075/7/2007PPASS
DetailsTom Arcoraci
zane - insulation ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
BLD-Framing/Rough-in4/30/20075/1/20075/1/2007PPASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 4/30/2007 at 2:32:01 PM. Contact: ###-####.
BLD-Framing/Rough-in1/11/20071/11/20071/11/2007PPART
DetailsTom Arcoraci
clint- firewall; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok as a duplex only 2nd floor over hangs opposite side
BLD-Other12/29/200612/29/200612/29/2006PPART
DetailsJim Sly
Glen Note: Fire wall in townhouse; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
Appr Plan shows 2hr wall....5/8 5/8 2x4 5/8 5/8. Framers are staggering joints, blocking and nailing at 7OC. Note: (To be built for Duplex only) .....HMMMMMM
Inspection of wall up to 10' height only.
BLD-Footing11/27/200611/27/200611/27/2006PPASS
DetailsTom Arcoraci
clay ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Issue PAID IN FULL permit  11/24/2006 DONE
Inspection Record Card- Bld  11/22/2006 DONE
Telephone call  11/22/2006 DONE
t/c w Mike Hon at MGW Management Inc. ###-#### - permit ready and fees given - he will furnish us with the RC# when he comes in to get the permit
Permit Ready to Issue  11/22/2006 DONE
Plan assigned to (SRZ)10/5/2006 11/21/2006 DONE
Routing - PLAN CHECK11/2/2006 11/21/2006 PASS
Case Summary (BLD)  11/21/2006  
PLANS/APPL TAKEN TO FRONT DESK  11/21/2006 DONE
Routing - PLANNING11/1/2006 11/1/2006 PASS
Approved per CAA06-000257
Routing - PUBLIC WORKS11/1/2006 11/1/2006 PASS
Routing - Addressing10/5/2006 10/6/2006 PASS
Routing - PLANNING10/6/2006 10/6/2006 FAIL
Applicant has not submitted detailed landscape plan for final review and approval.
Applicant has also not submitted calculations showing that the 15% of the front facade is comprised of windows and doors.
Applicant was called on 10-06-06. Left message.
Application received  10/5/2006