Permit Information
Permit NumberBLD06-02891
StatusFinaled
Name IDAHO INDUSTRIAL COMMISSION
Site Address 4355 W EMERALD ST Unit: 105
Project NameEMERALD SQUARE
Customer Number 
ePlanReviewNo
Description
(Collier's Int. RCE-8702) (IDAHO INDUSTRIAL COMMISSION - EMERALD SQUARE - STE 105) This building is NOT fire sprinklered. To create a 2,945 square foot office tenant space from a larger space located on the 1st story of an existing 2 story building. Work is to include 20 minute doors with 45 minute sidelights in an existing 1-hr fire-resistance-rated corridor wall, interior nonbearing walls, interior doors with sidelights, suspended ceilings, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD3/21/20073/21/20073/26/2007 DONE
Second Notice has not been responded to.
Second Notice BLD3/8/20073/8/20073/21/2007 DONE
First Notice has not been responded to.
First Notice 2/20/20073/8/2007 DONE
Permanent occupancy  2/20/2007 DONE
Perm. Occ. Cert. # 11443 issued 2-20-07 to the Idaho Industrial Commission.
BLD-Final2/14/20072/15/20072/15/2007PPASS
DetailsMike Jordan
rob; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. Ok for perm occ.
FIRE-Final Inspection2/14/20072/15/20072/15/2007APASS
DetailsTroy Cobbley
Life safety passed. A temporary suite number is to be installed.
Permanent Occupancy 2/15/20072/15/2007 DONE
Details
BLD-Other2/2/20072/2/20072/2/2007PPASS
DetailsTom Arcoraci
rob Note: ceiling; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in1/10/20071/10/20071/10/2007PPASS
DetailsTom Arcoraci
rob ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
Issue PAID IN FULL permit  12/11/2006  
Print Occupancy Form  11/29/2006 DONE
Telephone call  11/29/2006 DONE
lft vm with john day ###-#### that permit and fees are ready to be picked up
Permit Ready to Issue  11/29/2006 DONE
Routing - PLAN CHECK11/21/2006 11/28/2006 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  11/28/2006 DONE
Plan assigned to (CJW)10/12/2006 11/28/2006 PASS
11/28/2006 11:29:56 CJW - activity updated through activity BLDA022 from case BLD06-02891.
Routing - FIRE11/17/2006 11/21/2006 PASS
Attached review comments to plans.
Plan resubmittals received  11/21/2006  
1 cover transmittal 2 copies of sheetsA2.01, A2.02, A2.03 and taken to Carl Westfall
1st review completed  11/21/2006 FAIL
Failed plan check.
Routing - PLAN CHECK10/13/2006 11/17/2006 FAIL
The IBC plan review was started on November 16, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS10/12/2006 10/13/2006 PASS
Pending Assignment by MYS10/9/2006 10/12/2006 DONE
10/12/2006 08:17:27 MYS - activity updated through activity BLDA172 from case BLD06-02891.
Plans ACCEPTED BY PLAN TECH  10/9/2006 DONE
Received 2003 mechanical and lighting compliance certs
Telephone call  10/6/2006 DONE
called John Day ###-#### and left voicemessage need 2003 mechanical and lighting compliance certificates before can route plans, will be in hold bin until then; also project does not qualify for expedited process per Marlene S. no pre-existing tenant.
Recd Pcfee & Taken To Pln CK  10/5/2006  
Application received  10/5/2006