Permit Information
Permit NumberBLD06-02893
StatusFinaled
Name VERTICAL CONSTRUCTION
Site Address 2600 ROSE HILL ST Unit: 101
Project NameVISTA STATION
Customer Number 
ePlanReviewNo
Description
RCE-35 Vertical Construction (PREMIER INSURANCE - VISTA STATION - 1ST FLR) To remodel an existing 3,638 sq. ft. tenant space presently occupied by Premier Insurance under C.O. #10968, issued 4/6/06, for there continued use and to remodel 185 sq. ft. of common restroom & lobby area used by first floor tenant and by second floor for exiting. To add (2) two 60 minute door/frame assemblies with self-closing fire rated hardware from the north stair #231 into Idaho Rivers United tenant space on the west side and from stair 231 into the existing 1-hour exit corridor on the right. To install a new 20 minute labeled fire-rated, smoke and draft stop ("S" label), self closing, door/frame/hardware assembly from the rated corridor into Reception Waiting Room 201. To install a new exterior door/frame, door 107B, directly to the exterior from the new proposed conference Room. Work includes selective interior demolition of interior non-bearing walls and construction of new interior walls to create new private offices, conference, waiting & break rooms for Premier Insurance.To install new suspended ceiling grid system; upgrade electrical, plumbing and mechanical systems to meet tenant needs and comply with current adopted codes and ordinances. To remodel the two existing common use restrooms located at the northwest corner of the first floor for accessibility compliance. All per approved plans, to include red-line notes theron and all attached plan review conditions of all reviewing agencies to be part of the approved plans requiring compliance. drs
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD10/1/200710/1/200710/11/2007 DONE
Second Notice has not been responded to.
Second Notice BLD9/13/20079/13/200710/1/2007 DONE
First Notice has not been responded to.
First Notice8/23/20078/23/20079/13/2007 DONE
DetailsTom Arcoraci
BLD-Final8/23/20078/23/20078/23/2007PPASS
DetailsTom Arcoraci
dave Phone #: ###-####
DOC - Permit Finaled8/23/20078/23/20078/23/2007PPASS
DetailsTom Arcoraci
FIRE-Final Inspection8/23/20078/23/20078/23/2007APASS
DetailsTroy Cobbley
Life safety passed
FIRE-Final Inspection8/8/20078/8/20078/8/2007AFAIL
DetailsTroy Cobbley
The new exit signs in the new office corridor do not operate. The existing exit sign in the north exit lobby does not work. The manual dead bolts on the remodeled mens and womens restrooms need to be removed.
BLD-Aging Inspection5/23/20075/23/20075/23/2007 NR
DetailsTom Arcoraci
BLD-Framing/Rough-in3/15/20073/16/20073/16/2007APASS
DetailsJim Sly
dave; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD-Framing/Rough-in1/22/20071/22/20071/22/2007APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 1/22/2007 at 7:20:51 AM. Contact: ###-####.
Issue PAID IN FULL permit  1/12/2007 DONE
Telephone call  1/9/2007 DONE
TLK TO DAVID RUDEAN ###-#### THAT PERMIT AND FEES ARE READY TO BE PICKED UP
Permit Ready to Issue  1/9/2007  
Plan resubmittals received  1/8/2007  
received letter of transmittal from rudeen & associates. also "2" page letter from rudeen & associates for plan corrections. a letter from pinnacle engineers inc & a form from series levers on functions. also received "3" sets of plans with each sheet including AO.OO, A2.O1, A6.O1, A7.O1, & M-1-plans taken to dan stuart
Telephone call  1/8/2007 DONE
Call from Chris Anderson, Rudeen & Associates. Has resubmitted plans for Premier Insurance. ask me to call him if items requireing submittal are not complete.
Telephone call  1/8/2007 DONE
Called Chris. Plans re-submitted on 1/5/06 did not have CISCA Data or details for installation at perimeter of ceiling; plans did not identify the light fixture's (no fixture schedule) so they could be verified against the Lighting Compliance certificate data and no switching was indicated on plans or compliance requirements for lighting reduction controls. Chris said he would get me the light fixture schedule and switching/control plans showing compliance with Section 805 by this afternoon. I e-mailed him a follow-up note. I will attache a copy of the CISCA Standard.
Plan resubmittals requested  1/8/2007  
Phone call and e-mail to Chris Anderson, Rudeen & Associates.
Plan resubmittals received  1/8/2007  
Received letter of transmittal and 2 copies of page A6.01; taken to Dan Stuart
Plan resubmittals received  1/8/2007 DONE
Two copies of Sheet A6.01 showing electrical switching provided. Notes on reduction lighting control requirements included as part of plan review of approved plans.
Routing - PLAN CHECK1/8/2007 1/8/2007 PASS
Inserted new Sheet A6.01 into plans. Plans approved to include red-lined comments on plans and all attached plan review conditions of all reviewing agencies.
Plan resubmittals received  1/8/2007 DONE
received letter of transmittal from rudeen & associates. also "2" sheets each of A6.O1-- plans taken to dan stuart
Plan resubmittals requested  1/8/2007 DONE
EARLIER RESUBMITTALS OF 1/8/07 WERE STILL INCOMPLETE REGARDING LIGHTING REDUCTION REQUIREMENTS FOR LIGHTING CONTROLS. I FAXED CHRIS ANDERSON TO RESUBMIT.
Plan resubmittals received  1/8/2007 DONE
SECOND RESUBMITTAL OF SHEET A6.01 FOR TODAY PROVIDED AN INDICATION OF LIGHTING CONTROL FOR ENERGY CODE COMPLIANCE BUT NO DIRECTION FROM ARCHITECT ON METHOD OF OPERATION BASED ON SEVERAL APPROVED IN THE 2003 IECC. I INCLUDED THE APPROVED METHODS AS PART OF THE PLAN REVIEW CONDITIONS ATTACHED TO AND PART OF THE APPROVED PLANS IN ORDER TO FINALLY APPROVE THE ISSUE THIS PERMIT.
PLANS/APPL TAKEN TO FRONT DESK  1/8/2007 PASS
Plans approved and include red-line notes on the plans and the attached plan review conditions of all reviewing agencies. Taking to permit desk to issue.
Inspection Record Card- Bld  1/8/2007 DONE
Plan assigned to (DRS)10/12/2006 1/8/2007 PASS
1/8/2007 16:29:14 DRS - activity updated through activity BLDA022 from case BLD06-02893.
Routing - PLAN CHECK1/5/2007 1/7/2007 FAIL
Inserted resubmittals of 1/5/07 into plans. Suspended ceiling installation data was not provided as required and the light fixture schedule to identify lights in reflected ceiling detail. Switching compliance and lighting control for reduction of lighting were not submitted with plans of 1/5/07.
Routing - FIRE1/4/2007 1/5/2007 PASS
Attached updated review comments to plans.
Telephone call  1/4/2007 DONE
Phone call to Raylene at Vertical Construction lettting her know the plans had failed and architect was notified of deficiencies.
Routing - PLAN CHECK11/30/2006 1/4/2007 FAIL
Plan resubmittals of 12/28/06 were incomplete to show code compliance required in plan review. E-mailed copy of re-review comments to architect and owner. routing plans back to fire code analyst for review.
Plan resubmittals requested  1/4/2007 DONE
E-mailed copy of plan review items of original review still needing to be addressed by architect.
Plan resubmittals received  12/28/2006  
Received transmittal letter, 2pg. letter of response, and 3 copies of the following pages: A0.00, A2.01, A2.02, A6.01, A7.01, l1.01, M-1; taken to Dan Stuart
1st review completed  11/30/2006 FAIL
Failed plan check and fire.
Routing - FIRE11/27/2006 11/30/2006 FAIL
Faxed resubmittal items to architect. Attached review comments to plans.
Plan Reviewer's activity  11/28/2006 DONE
Raylene at Vertical Construction called to request copy of plan review for Premier Insurance for which they are designated contractor on application. sent to raylene@vertical-corp.com
Plan resubmittals requested  11/27/2006 DONE
Faxed and e-mailed copy of plan review corrections to David Rudeen.
Case Summary (BLD)  11/27/2006  
Routing - PLAN CHECK10/13/2006 11/27/2006 FAIL
Resubmittals required. Copy of plan review items needing corrections e-mailed and faxed to architect. routing to fire code analyst for review.
(F) Reprint permit  11/6/2006 DONE
Routing - PUBLIC WORKS10/12/2006 10/13/2006 PASS
Pending Assignment by MYS10/6/2006 10/12/2006 DONE
10/12/2006 08:33:05 MYS - activity updated through activity BLDA168 from case BLD06-02893.
Plans ACCEPTED BY PLAN TECH  10/6/2006  
Application received  10/5/2006  
Recd Pcfee & Taken To Pln CK  10/5/2006