Third Notice BLD | 10/1/2007 | 10/1/2007 | 10/11/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 9/13/2007 | 9/13/2007 | 10/1/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 8/23/2007 | 8/23/2007 | 9/13/2007 | | DONE |
Tom Arcoraci
|
|
|
|
BLD-Final | 8/23/2007 | 8/23/2007 | 8/23/2007 | P | PASS |
Tom Arcoraci
|
|
|
dave Phone #: ###-####
|
DOC - Permit Finaled | 8/23/2007 | 8/23/2007 | 8/23/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
FIRE-Final Inspection | 8/23/2007 | 8/23/2007 | 8/23/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 8/8/2007 | 8/8/2007 | 8/8/2007 | A | FAIL |
Troy Cobbley
|
|
|
The new exit signs in the new office corridor do not operate. The existing exit sign in the north exit lobby does not work. The manual dead bolts on the remodeled mens and womens restrooms need to be removed.
|
BLD-Aging Inspection | 5/23/2007 | 5/23/2007 | 5/23/2007 | | NR |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 3/15/2007 | 3/16/2007 | 3/16/2007 | A | PASS |
Jim Sly
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Framing/Rough-in | 1/22/2007 | 1/22/2007 | 1/22/2007 | A | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 1/22/2007 at 7:20:51 AM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 1/12/2007 | | DONE |
|
|
|
|
Telephone call | | | 1/9/2007 | | DONE |
|
|
|
TLK TO DAVID RUDEAN ###-#### THAT PERMIT AND FEES ARE READY TO BE PICKED UP
|
Permit Ready to Issue | | | 1/9/2007 | | |
|
|
|
|
Plan resubmittals received | | | 1/8/2007 | | |
|
|
|
received letter of transmittal from rudeen & associates. also "2" page letter from rudeen & associates for plan corrections. a letter from pinnacle engineers inc & a form from series levers on functions. also received "3" sets of plans with each sheet including AO.OO, A2.O1, A6.O1, A7.O1, & M-1-plans taken to dan stuart
|
Telephone call | | | 1/8/2007 | | DONE |
|
|
|
Call from Chris Anderson, Rudeen & Associates. Has resubmitted plans for Premier Insurance. ask me to call him if items requireing submittal are not complete.
|
Telephone call | | | 1/8/2007 | | DONE |
|
|
|
Called Chris. Plans re-submitted on 1/5/06 did not have CISCA Data or details for installation at perimeter of ceiling; plans did not identify the light fixture's (no fixture schedule) so they could be verified against the Lighting Compliance certificate data and no switching was indicated on plans or compliance requirements for lighting reduction controls. Chris said he would get me the light fixture schedule and switching/control plans showing compliance with Section 805 by this afternoon. I e-mailed him a follow-up note. I will attache a copy of the CISCA Standard.
|
Plan resubmittals requested | | | 1/8/2007 | | |
|
|
|
Phone call and e-mail to Chris Anderson, Rudeen & Associates.
|
Plan resubmittals received | | | 1/8/2007 | | |
|
|
|
Received letter of transmittal and 2 copies of page A6.01; taken to Dan Stuart
|
Plan resubmittals received | | | 1/8/2007 | | DONE |
|
|
|
Two copies of Sheet A6.01 showing electrical switching provided. Notes on reduction lighting control requirements included as part of plan review of approved plans.
|
Routing - PLAN CHECK | 1/8/2007 | | 1/8/2007 | | PASS |
|
|
|
Inserted new Sheet A6.01 into plans. Plans approved to include red-lined comments on plans and all attached plan review conditions of all reviewing agencies.
|
Plan resubmittals received | | | 1/8/2007 | | DONE |
|
|
|
received letter of transmittal from rudeen & associates. also "2" sheets each of A6.O1-- plans taken to dan stuart
|
Plan resubmittals requested | | | 1/8/2007 | | DONE |
|
|
|
EARLIER RESUBMITTALS OF 1/8/07 WERE STILL INCOMPLETE REGARDING LIGHTING REDUCTION REQUIREMENTS FOR LIGHTING CONTROLS. I FAXED CHRIS ANDERSON TO RESUBMIT.
|
Plan resubmittals received | | | 1/8/2007 | | DONE |
|
|
|
SECOND RESUBMITTAL OF SHEET A6.01 FOR TODAY PROVIDED AN INDICATION OF LIGHTING CONTROL FOR ENERGY CODE COMPLIANCE BUT NO DIRECTION FROM ARCHITECT ON METHOD OF OPERATION BASED ON SEVERAL APPROVED IN THE 2003 IECC. I INCLUDED THE APPROVED METHODS AS PART OF THE PLAN REVIEW CONDITIONS ATTACHED TO AND PART OF THE APPROVED PLANS IN ORDER TO FINALLY APPROVE THE ISSUE THIS PERMIT.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2007 | | PASS |
|
|
|
Plans approved and include red-line notes on the plans and the attached plan review conditions of all reviewing agencies. Taking to permit desk to issue.
|
Inspection Record Card- Bld | | | 1/8/2007 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 10/12/2006 | | 1/8/2007 | | PASS |
|
|
|
1/8/2007 16:29:14 DRS - activity updated through activity BLDA022 from case BLD06-02893.
|
Routing - PLAN CHECK | 1/5/2007 | | 1/7/2007 | | FAIL |
|
|
|
Inserted resubmittals of 1/5/07 into plans. Suspended ceiling installation data was not provided as required and the light fixture schedule to identify lights in reflected ceiling detail. Switching compliance and lighting control for reduction of lighting were not submitted with plans of 1/5/07.
|
Routing - FIRE | 1/4/2007 | | 1/5/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Telephone call | | | 1/4/2007 | | DONE |
|
|
|
Phone call to Raylene at Vertical Construction lettting her know the plans had failed and architect was notified of deficiencies.
|
Routing - PLAN CHECK | 11/30/2006 | | 1/4/2007 | | FAIL |
|
|
|
Plan resubmittals of 12/28/06 were incomplete to show code compliance required in plan review. E-mailed copy of re-review comments to architect and owner. routing plans back to fire code analyst for review.
|
Plan resubmittals requested | | | 1/4/2007 | | DONE |
|
|
|
E-mailed copy of plan review items of original review still needing to be addressed by architect.
|
Plan resubmittals received | | | 12/28/2006 | | |
|
|
|
Received transmittal letter, 2pg. letter of response, and 3 copies of the following pages: A0.00, A2.01, A2.02, A6.01, A7.01, l1.01, M-1; taken to Dan Stuart
|
1st review completed | | | 11/30/2006 | | FAIL |
|
|
|
Failed plan check and fire.
|
Routing - FIRE | 11/27/2006 | | 11/30/2006 | | FAIL |
|
|
|
Faxed resubmittal items to architect. Attached review comments to plans.
|
Plan Reviewer's activity | | | 11/28/2006 | | DONE |
|
|
|
Raylene at Vertical Construction called to request copy of plan review for Premier Insurance for which they are designated contractor on application. sent to raylene@vertical-corp.com
|
Plan resubmittals requested | | | 11/27/2006 | | DONE |
|
|
|
Faxed and e-mailed copy of plan review corrections to David Rudeen.
|
Case Summary (BLD) | | | 11/27/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 10/13/2006 | | 11/27/2006 | | FAIL |
|
|
|
Resubmittals required. Copy of plan review items needing corrections e-mailed and faxed to architect. routing to fire code analyst for review.
|
(F) Reprint permit | | | 11/6/2006 | | DONE |
|
|
|
|
Routing - PUBLIC WORKS | 10/12/2006 | | 10/13/2006 | | PASS |
|
|
|
|
Pending Assignment by MYS | 10/6/2006 | | 10/12/2006 | | DONE |
|
|
|
10/12/2006 08:33:05 MYS - activity updated through activity BLDA168 from case BLD06-02893.
|
Plans ACCEPTED BY PLAN TECH | | | 10/6/2006 | | |
|
|
|
|
Application received | | | 10/5/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/5/2006 | | |
|
|
|
|