BLD-Final | 5/18/2007 | 5/18/2007 | 5/18/2007 | P | PASS |
Jim Storey
|
|
|
|
DOC - Permit Finaled | 5/18/2007 | 5/18/2007 | 5/18/2007 | P | PASS |
Jim Storey
|
|
|
|
BLD-Grading Inspection | 5/17/2007 | 5/17/2007 | 5/17/2007 | | DONE |
|
|
|
Final grading and drainage approved
|
BLD-Energy code compliance | 1/30/2007 | 2/1/2007 | 2/1/2007 | A | PASS |
Jim Storey
|
|
|
JOE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Framing/Rough-in | 1/23/2007 | 1/26/2007 | 1/26/2007 | A | PASS |
Jim Storey
|
|
|
jim; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Other | 11/21/2006 | 11/21/2006 | 11/21/2006 | P | PASS |
Jim Storey
|
|
|
logan - note: stem wall insp; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Footing | 11/20/2006 | 11/21/2006 | 11/21/2006 | A | PASS |
Jim Storey
|
|
|
matt; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 11/17/2006 | 11/17/2006 | 11/17/2006 | P | PASS |
Jim Storey
|
|
|
Donny; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
PubWorks Subgrade Approval | 11/17/2006 | 11/17/2006 | 11/17/2006 | | DONE |
|
|
|
Subgrade for upper level footings has been approved by the geotechnical engineer.
|
BLD-Foundation | 11/8/2006 | 11/9/2006 | 11/9/2006 | A | PASS |
Jim Storey
|
|
|
Logan; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt exterior water stopping ok on basement walls.
|
BLD-Other | 11/6/2006 | 11/7/2006 | 11/7/2006 | A | PASS |
Jim Storey
|
|
|
logan - note: stem wall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Footing | 11/1/2006 | 11/1/2006 | 11/1/2006 | P | PART |
Jim Storey
|
|
|
logan ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith basement ft ok
|
PubWorks Subgrade Approval | 11/1/2006 | 11/1/2006 | 11/1/2006 | | PART |
|
|
|
Footing subgrade for basement footings approved
|
BLD-Footing | 10/31/2006 | 10/31/2006 | 10/31/2006 | P | FAIL |
Jim Storey
|
|
|
logan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles no sign off from public works. no insp. performed until public works is aproved to place foottings.
|
Issue PAID IN FULL permit | | | 10/19/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 10/18/2006 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 10/18/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 10/18/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/18/2006 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 10/18/2006 | | DONE |
|
|
|
|
Telephone call | | | 10/18/2006 | | DONE |
|
|
|
Called left voice message that permi tis ready & fees///10/18/06 @ 3:24pm BAS
|
Routing - FIRE | 10/17/2006 | | 10/18/2006 | | PASS |
|
|
|
No fire sprinklers required (Promontory Ridge)
|
Routing - PLAN CHECK | 10/18/2006 | | 10/18/2006 | | PASS |
|
|
|
Sam Z.
|
Routing - Erosion and Sediment | 10/16/2006 | | 10/17/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLANNING Land Div | 10/11/2006 | | 10/13/2006 | | PASS |
|
|
|
plat has been recorded.
|
Routing - PUBLIC WORKS GRADING | 10/11/2006 | | 10/11/2006 | | PASS |
|
|
|
Approved as category 1 by CFH06-42
|
Routing - PLANNING | 10/11/2006 | | 10/11/2006 | | PASS |
|
|
|
Routed to A. Wood CFH06-42 10/11/06
|
Routing - PUBLIC WORKS | 10/11/2006 | | 10/11/2006 | | PASS |
|
|
|
|
Routing - Addressing | 10/10/2006 | | 10/10/2006 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS GRADING | 10/10/2006 | | 10/10/2006 | | FAIL |
|
|
|
Briggs hillside report must be revised to reflect garbage that was found in fill and that drainage will daylight at the front of the lot. Talked with joe harris and Dean Briggs.
|
Application received | | | 10/10/2006 | | |
|
|
|
|