Second Notice BLD | 10/17/2007 | 10/17/2007 | 10/29/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/24/2007 | 10/17/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | | 9/24/2007 | | DONE |
|
|
|
|
BLD-Final | 7/18/2007 | 7/18/2007 | 7/19/2007 | P | PART |
Tony Young
|
|
|
mitch Phone #: ###-#### ok for perm. c of o after trades
|
PubWorks Occupancy Approval | 7/19/2007 | 7/19/2007 | 7/19/2007 | | DONE |
|
|
|
|
BLD-Final | 7/13/2007 | 7/17/2007 | 7/17/2007 | A | PART |
Tony Young
|
|
|
mitch Phone #: ###-#### temp occ ok,, need plumbing full signoff
|
Code Occupancy Approval | 7/16/2007 | 7/16/2007 | 7/16/2007 | P | PASS |
Michael Garner
|
|
|
site inspection complete - i found that the bldr/owner have substantially complied with the approved plans/conditions - the only notable change has to do with lawn - a portion of the plan called for lawn area between the business and an apt. complex - that particular strip of land is heavily sloped, skinny and generally not a good candidate for lawn so they used large river rocks and trees - I approved this change - PASS
|
COD-Stop Work/Reinspection Fee | 7/16/2007 | 7/16/2007 | 7/16/2007 | P | CANC |
Michael Garner
|
|
|
|
FIRE-Final Inspection | 7/13/2007 | 7/16/2007 | 7/16/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 7/13/2007 | 7/13/2007 | 7/13/2007 | P | FAIL |
Troy Cobbley
|
|
|
Provide the correct sticker at the exit, provide the indicator at the exit and install doors with hardware for verification
|
BLD-Other | 5/9/2007 | 5/10/2007 | 5/10/2007 | P | PASS |
Tony Young
|
|
|
mitch NOte; cover framing; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles insulation ok,, ok to cover
|
BLD-Framing/Rough-in | 5/8/2007 | 5/9/2007 | 5/9/2007 | A | PASS |
Tony Young
|
|
|
mitch ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith
|
BLD-Framing/Rough-in | 5/3/2007 | 5/4/2007 | 5/4/2007 | P | FAIL |
Tony Young
|
|
|
mitch; Phone #: ###-#### Internet Inspection Request from: Victoria Beall c/n posted,, no cover allowed
|
BLD-Conference | 5/4/2007 | 5/4/2007 | 5/4/2007 | A | CANC |
Tony Young
|
|
|
Mitch,, frame for pm,, conf on frame am
|
BLD-Foundation | 2/28/2007 | 3/1/2007 | 3/1/2007 | A | PASS |
Tony Young
|
|
|
santos; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Footing | 2/27/2007 | 2/28/2007 | 2/28/2007 | A | PASS |
Tony Young
|
|
|
Santos; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
(F) Reprint permit | | | 2/20/2007 | | |
|
|
|
|
Issue PAID IN FULL permit | | | 2/16/2007 | | |
|
|
|
|
Telephone call | | | 2/13/2007 | | DONE |
|
|
|
lft vm with george mclean ###-#### that permit and fees are ready to be picked up
|
Print Occupancy Form | | | 12/5/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/5/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/5/2006 | | DONE |
|
|
|
lft vm with george mclean ###-#### that permit and fees are ready to be picked up but needs ACHD
|
Permit Ready to Issue | | | 12/5/2006 | | DONE |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/4/2006 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 10/11/2006 | | 12/4/2006 | | PASS |
|
|
|
12/4/2006 09:10:07 MLO - activity updated through activity BLDA022 from case BLD06-02931.
|
Routing - PLAN CHECK | 11/28/2006 | | 12/1/2006 | | PASS |
|
|
|
|
Plan resubmittals received | | | 11/30/2006 | | |
|
|
|
Received 1 copy of Plan Review Report, 2 copies of sheet A8 and taken to Mike Otto
|
Routing - PLUMBING | 11/27/2006 | | 11/28/2006 | | PASS |
|
|
|
no fixture schedule- water piping may need to be resized and resubmitted prior to final. no requested details- may need to be resubmitted prior to final.
|
Routing - PLAN CHECK | 11/21/2006 | | 11/27/2006 | | FAIL |
|
|
|
corrections sent to Granite Construction.
|
Plan resubmittals requested | | | 11/27/2006 | | DONE |
|
|
|
IBC correction
|
Plan resubmittals received | | | 11/20/2006 | | |
|
|
|
Received 1pg. cover letter to Mike Otto, copy of Plan Review Report, 2 copies of the following pages: C1, C2, A1, A2, A3, A4, A5, A6, A7, EN-1, EN-2, S-1; taken to Mike Otto
|
1st review completed | | | 11/1/2006 | | FAIL |
|
|
|
Failed plan check and plumbing.
|
Routing - FIRE | 10/27/2006 | | 11/1/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
Plan resubmittals requested | | | 10/27/2006 | | DONE |
|
|
|
IBC corrections
|
Routing - PLAN CHECK | 10/25/2006 | | 10/27/2006 | | FAIL |
|
|
|
unable to fax corrections mailed to architect.
|
Routing - PLANNING | 10/23/2006 | | 10/25/2006 | | PASS |
|
|
|
DRH06-00297 Josh Wilson
|
Routing - PLUMBING | 10/20/2006 | | 10/23/2006 | | FAIL |
|
|
|
building code requires a drinking fountain, show location and piping. provide a fixture schedule. provide a water heater detail/ thermol expantion protection will be required. pan and drain to approved location, t&p to approved location.
|
Routing - Erosion and Sediment | 10/19/2006 | | 10/20/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 10/17/2006 | | 10/19/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 10/11/2006 | | 10/18/2006 | | PASS |
|
|
|
|
Application received | | | 10/11/2006 | | |
|
|
|
|
Pending Assignment by MYS | 10/11/2006 | | 10/11/2006 | | DONE |
|
|
|
10/11/2006 15:05:34 JCM - activity updated through activity BLDA174 from case BLD06-02931.
|
Plans ACCEPTED BY PLAN TECH | | | 10/11/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/11/2006 | | DONE |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/11/2006 | | |
|
|
|
|