Third Notice BLD | 9/22/2008 | 9/22/2008 | 3/12/2009 | | DONE |
Alexandra L. DeYoung
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 8/11/2008 | 8/11/2008 | 9/22/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 5/28/2008 | 8/11/2008 | | DONE |
|
|
|
|
Permanent Occupancy | | | 5/28/2008 | | DONE |
|
|
|
|
Code Occupancy Approval | 5/22/2008 | 5/22/2008 | 5/22/2008 | P | PASS |
Scott M.Brown
|
|
|
ALL IN AS REQUIRED OK FOR FINAL
|
BLD-Final | 4/4/2008 | 4/7/2008 | 4/7/2008 | P | PASS |
Tom Arcoraci
|
|
|
John; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
FIRE-Final Inspection | 4/4/2008 | 4/7/2008 | 4/7/2008 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed.
|
Temporary Occupancy | 4/7/2008 | 7/6/2008 | 4/7/2008 | | DONE |
Cathy Weisshaupt
|
|
|
|
FIRE-Final Inspection | 4/1/2008 | 4/4/2008 | 4/4/2008 | A | FAIL |
Troy Cobbley
|
|
|
The four existing emergency lights did not operate. All other items are ok.
|
BLD-Final | 4/1/2008 | 4/4/2008 | 4/4/2008 | A | PART |
Tom Arcoraci
|
|
|
john Phone #: ###-#### needs fire
|
CHANGE STATUS TO (ISS) | | | 4/1/2008 | | |
|
|
|
printed tmp in error
|
BLD-Final | 3/25/2008 | 3/26/2008 | 3/26/2008 | A | PART |
Tom Arcoraci
|
|
|
John Hanson Phone #: ###-#### conference
|
Code Occupancy Approval | 3/17/2008 | 3/17/2008 | 3/17/2008 | P | FAIL |
Dena Gambrel
|
|
|
FAILED: 03-17-08 1259 I spoke to John. No bond on yet for the landscaping. DO NOT SIGN OFF UNTIL BOND HAS BEEN RECEIVED.
|
Code Occupancy Approval Temp | 3/7/2008 | 3/7/2008 | 3/7/2008 | P | FAIL |
Dena Gambrel
|
|
|
3-7-08 Landscape is not in. Correction notice left to bond for the landscaping in the amount of $53,319.
|
BLD-Conference | 3/4/2008 | 3/5/2008 | 3/5/2008 | A | PASS |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
BLD-Wall cover | 1/30/2008 | 1/31/2008 | 1/31/2008 | A | CANC |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 1/17/2008 | 1/18/2008 | 1/18/2008 | A | PASS |
Tom Arcoraci
|
|
|
john Phone #: ###-####
|
BLD-Wall cover | 1/11/2008 | 1/11/2008 | 1/11/2008 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 1/9/2008 | 1/11/2008 | 1/11/2008 | A | PASS |
Tom Arcoraci
|
|
|
|
Inspection Record Card- Bld | | | 1/11/2008 | | DONE |
|
|
|
|
BLD-Conference | 1/8/2008 | 1/9/2008 | 1/9/2008 | A | CANC |
Tom Arcoraci
|
|
|
John, looking at grid ceilings & overall fire walk; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
BLD-Framing/Rough-in | 11/13/2007 | 11/14/2007 | 11/14/2007 | A | PASS |
Tom Arcoraci
|
|
|
JOHN Phone #: ###-#### wip ok rfi # 80 ok
|
BLD-Framing/Rough-in | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 11/5/2007 | 11/5/2007 | 11/5/2007 | P | PASS |
Tom Arcoraci
|
|
|
rick Phone #: ###-####
|
BLD-Framing/Rough-in | 10/16/2007 | 10/17/2007 | 10/17/2007 | A | PART |
Tom Arcoraci
|
|
|
rick Phone #: ###-#### wip ok
|
BLD-Framing/Rough-in | 9/28/2007 | 9/28/2007 | 9/28/2007 | P | PASS |
Tom Arcoraci
|
|
|
rick - 1st floor - east side Phone #: ###-####
|
BLD-Other | 9/24/2007 | 9/24/2007 | 9/24/2007 | A | PASS |
Tom Arcoraci
|
|
|
john - nailing - deck of school gym Phone #: ###-####
|
BLD-Other | 9/14/2007 | 9/14/2007 | 9/14/2007 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 9/4/2007 | 9/4/2007 | 9/4/2007 | P | PART |
Tom Arcoraci
|
|
|
wip ok
|
BLD-Framing/Rough-in | 8/28/2007 | 8/28/2007 | 8/28/2007 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Framing/Rough-in | 8/23/2007 | 8/23/2007 | 8/23/2007 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Wall cover | 8/3/2007 | 8/3/2007 | 8/3/2007 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Other | 7/17/2007 | 7/17/2007 | 7/17/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 6/21/2007 | 6/21/2007 | 6/21/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Footing | 6/7/2007 | 6/7/2007 | 6/7/2007 | A | PASS |
Tom Arcoraci
|
|
|
|
BLD-Other | 5/24/2007 | 5/25/2007 | 5/25/2007 | P | PASS |
Tom Arcoraci
|
|
|
john wip ok
|
BLD-Other | 5/15/2007 | 5/15/2007 | 5/15/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Conference | 5/4/2007 | 5/4/2007 | 5/4/2007 | P | CANC |
Tom Arcoraci
|
|
|
john
|
BLD-Other | 5/1/2007 | 5/1/2007 | 5/2/2007 | P | CANC |
Tom Arcoraci
|
|
|
|
BLD-Other | 4/30/2007 | 4/30/2007 | 4/30/2007 | P | PASS |
Tom Arcoraci
|
|
|
|
(F) Reprint permit | | | 4/18/2007 | | |
|
|
|
|
BLD-Conference | 4/17/2007 | 4/17/2007 | 4/17/2007 | P | PASS |
Tom Arcoraci
|
|
|
john
|
BLD-Conference | 4/10/2007 | 4/17/2007 | 4/17/2007 | A | CANC |
Tom Arcoraci
|
|
|
john
|
Receive PAYMENT IN FULL PRINT | | | 4/17/2007 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 4/17/2007 | | |
|
|
|
paid previously
|
Routing - PLAN CHECK | 4/12/2007 | | 4/16/2007 | | PASS |
|
|
|
PLAN MODIFICATION reviewed and approved and sent to the permit desk on 4/16/07.
|
Print Occupancy Form | | | 4/16/2007 | | DONE |
|
|
|
|
Telephone call | | | 4/16/2007 | | DONE |
|
|
|
t/c w margie kennedy at ###-#### - plan mod ready for pick up - fees given
|
Permit Ready to Issue | | | 4/16/2007 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 3/15/2007 | | 4/16/2007 | | PASS |
|
|
|
PLAN MODIFICATION. 3/16/2007 - Reviewed and passed by Mike Otto and then forwarded on to zoning and fire for review.
4/16/2007-Review completed by others and plans taken to the permit desk for issuance.
|
Routing - FIRE | 4/10/2007 | | 4/12/2007 | | PASS |
|
|
|
Attached updated review comments to modified plans, dated March 14th, 2007.
|
BLD-Conference | 4/3/2007 | 4/10/2007 | 4/10/2007 | A | PASS |
Tom Arcoraci
|
|
|
john
|
Routing - PLAN CHECK | 3/28/2007 | | 4/10/2007 | | |
|
|
|
PLAN MODIFICATION. Rerouted to Fire.
|
Plan resubmittals received | | | 4/9/2007 | | |
|
|
|
Received transmittal letter, 1pg. letter of response from Hummel Arch., 2 copies of 2pg. response from Strata Enginering; taken to Mike Otto
|
BLD-Footing | 4/2/2007 | 4/3/2007 | 4/3/2007 | A | PASS |
Tom Arcoraci
|
|
|
John Gordon ###-#### strata on site
|
Override - Parcel Holds | | | 4/2/2007 | | |
|
|
|
|
Routing - FIRE | 3/26/2007 | | 3/28/2007 | | FAIL |
|
|
|
PLAN MODIFICATION. Faxed resubmittal item to architect. Attached updated review comments to plans.
|
Routing - PLANNING | 3/16/2007 | | 3/26/2007 | | PASS |
|
|
|
PLAN MODIFICATION. approved by A. Wood planning M.O.
|
Routing - PLAN CHECK | 3/16/2007 | | 3/16/2007 | | PASS |
|
|
|
|
Routing - PUBLIC WORKS | 3/16/2007 | | 3/16/2007 | | PASS |
|
|
|
PLAN MODIFICATION. EXTRA SET OF CIVILS IN PLAN ARE WITH BRAIN MURPHY
|
Plan Modification Accepted | | | 3/15/2007 | | |
|
|
|
Receved plan modification for Bld06-02968 to modify existing grasspave fire lane to be revised into asphalt. Add new catch basin/sediment box. Submitted on pages C1.2, C1.3, C1.4, and letter from Margie Kennedy (arch). Routed to Mike Otto
|
Telephone call | | | 3/14/2007 | | DONE |
|
|
|
I discussed a faxed sprinkler design request with Gerald Edberling, DeBest. Confirmed that an isolation valve assembly will be required for the two, new, two-story wings, being added on to the gymnasium (Ref BMC 7-01-55); particularly important in an E occupancy to reduce extent of impairments and to facilitate ready recognition of the fire area by responding fire fighters.
|
Issue PAID IN FULL permit | | | 2/13/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/17/2007 | | DONE |
|
|
|
|
MISC ACTIONS | | | 1/17/2007 | | |
|
|
|
proofread permit for fees
|
Telephone call | | | 1/17/2007 | | DONE |
|
|
|
lft vm with margie kennedy ###-#### that permit and fees are ready to be picked up but nees ACHD/GC/RCE/and RP
|
Permit Ready to Issue | | | 1/17/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 1/12/2007 | | 1/12/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2007 | | DONE |
|
|
|
|
Plan assigned to (MLO) | 10/16/2006 | | 1/12/2007 | | PASS |
|
|
|
1/12/2007 14:58:05 MLO - activity updated through activity BLDA022 from case BLD06-02968.
|
Plan resubmittals received | | | 1/11/2007 | | |
|
|
|
Received transmittal letter, 1pg. letter of response, 2 copies of page A2.01; taken to Mike Otto
|
Routing Off Site - STRUCTURAL | 12/28/2006 | | 1/10/2007 | | PASS |
|
|
|
Called Action Courier for pick up @ 10:59am on 12/28/06 BAS
|
Routing - FIRE | 12/28/2006 | | 12/29/2006 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLAN CHECK | 12/29/2006 | | 12/29/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 12/22/2006 | | 12/28/2006 | | FAIL |
|
|
|
correction sent to architect
|
Plan resubmittals requested | | | 12/28/2006 | | DONE |
|
|
|
IBC correction
|
Plan resubmittals received | | | 12/21/2006 | | |
|
|
|
Received transmittal letter, 2pg. response letter, 1pg. Structural Responses to Boise City Plan Review Comments, 2 copies of Supplemental Structural Calculations, 3 copies of the following pages: S5.1, S5.2, S6.1; 2 copies of the following pages: A1.02, A2.02, A2.11, A2.12, A5.01, A5.03, A5.04, A5.05; taken to Mike Otto
|
1st review completed | | | 11/20/2006 | | FAIL |
|
|
|
|
Routing - PLAN CHECK | 11/20/2006 | | 11/20/2006 | | |
|
|
|
|
Routing - FIRE | 11/15/2006 | | 11/20/2006 | | FAIL |
|
|
|
Faxed resubmittal item to archtiect. Attached review comments to plans.
|
Routing Off Site - STRUCTURAL | 10/16/2006 | | 11/15/2006 | | FAIL |
|
|
|
corrections sent to architect
|
Routing - PLAN CHECK | 10/26/2006 | | 11/15/2006 | | FAIL |
|
|
|
corrections sent to architect
|
Plan resubmittals requested | | | 11/15/2006 | | DONE |
|
|
|
IBC corrections
|
Routing - PLANNING | 10/24/2006 | | 10/25/2006 | | PASS |
|
|
|
CUP 06-00042 Angela W.-Signed off on paper on 10/25/06. Computer sign off on 11/3/06.
|
Routing - PLUMBING | 10/20/2006 | | 10/24/2006 | | PASS |
|
|
|
existing sewer under addition must be of material approved for inside the building. coil in hot water storage tank must be double wall with leak detection.
|
Routing - Erosion and Sediment | 10/20/2006 | | 10/20/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 10/17/2006 | | 10/19/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 10/16/2006 | | 10/18/2006 | | PASS |
|
|
|
|
Application received | | | 10/16/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/16/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 10/16/2006 | | |
|
|
|
|