CHANGE STATUS TO (COL) | | | 1/18/2008 | | DONE |
|
|
|
|
Second Notice BLD | 7/5/2007 | 7/5/2007 | 7/18/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 6/21/2007 | 7/5/2007 | | DONE |
|
|
|
|
BLD-Final | 6/18/2007 | 6/19/2007 | 6/21/2007 | P | CANC |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/18/2007 at 4:21:14 PM. Contact: ###-####.
|
BLD-Final | 6/20/2007 | 6/21/2007 | 6/21/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 6/20/2007 at 1:46:05 PM. final ok
|
FIRE-Final Inspection | 6/20/2007 | 6/21/2007 | 6/21/2007 | A | PASS |
Forrest France
|
|
|
Corrections completed, fire life safety inspection passed.
|
Permanent Occupancy | | 6/21/2007 | 6/21/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 6/21/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11674 issued 6-21-07 to Pacific Building Materials.
|
FIRE-Final Inspection | 6/19/2007 | 6/20/2007 | 6/20/2007 | A | FAIL |
Forrest France
|
|
|
Need to provide one fire extinguisher for each floor level with current certification tag.
|
PubWorks Occupancy Approval | 6/13/2007 | 6/13/2007 | 6/13/2007 | | DONE |
|
|
|
Signed off Final Inspection for Drainage, Brian Murphy.
|
Telephone call | | | 5/18/2007 | | DONE |
|
|
|
Another telcon with owner, Mirazin Shakoori, who continued to protest the requirement for FA monitoring of his sprinkler system. He said his neighbor, Insight Archit's had exactly the same building and didn't have to monitor it. I researched both permits extensively and determined Insight building required 20 heads and his required 26 heads, apparently due to the fact that he had added a 588 sf mezzanine in his building. After lengthy discussion, he finally seemed to accept the decision and indicated he was going to have ADT proceed with getting a permit to do the installation.
|
Telephone call | | | 5/16/2007 | | DONE |
|
|
|
Telcon with owner, Mirazin Shakoori, who was protesting the requirement for FA monitoring of his sprinkler system. I explained it was due to number of heads; referred him to Mike Timmerman for further discussion as I was out of the office and unable to access his permit information.
|
BLD-Energy code compliance | 3/29/2007 | 3/30/2007 | 3/30/2007 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/29/2007 at 3:36:01 PM. Contact: ###-####.
|
BLD-Energy code compliance | 3/20/2007 | 3/21/2007 | 3/21/2007 | P | CANC |
Jim Storey
|
|
|
Disp set to [CANC] by a contractor via Hello! on Mar 21 2007 10:52AM.
|
BLD-Energy code compliance | 3/19/2007 | 3/20/2007 | 3/20/2007 | P | DEFR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/19/2007 at 2:28:14 PM. Contact: ###-####.
|
BLD-Framing/Rough-in | 3/19/2007 | 3/20/2007 | 3/20/2007 | P | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/19/2007 at 2:27:18 PM. Contact: ###-####.
|
Print Occupancy Form | | | 1/16/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 1/16/2007 | | DONE |
|
|
|
|
Meeting | | | 1/16/2007 | | DONE |
|
|
|
owner was in office to check on status of permit, told him it is ready and fees, pending ACHD approval (was never done with shell permit)
|
Issue PAID IN FULL permit | | | 1/16/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/19/2006 | | 1/12/2007 | | PASS |
|
|
|
Plan resubmittals inserted into original plans. No further resubmittals required. To permit desk to process for issue.
|
Plan resubmittals received | | | 1/12/2007 | | |
|
|
|
1 copy 2 page response letter - 2 copies of the following Specification Booklet - sheet #s A0.0 -A1.0 - A2.0 - NE1.0 - M1.0 - M2.0 - M3.0 - P1.0 - P2.0 - E1.0 - and taken to Dan Stuart
|
Override - Parcel Holds | | | 1/12/2007 | | |
|
|
|
|
Override - Parcel Holds | | | 1/12/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/12/2007 | | PASS |
|
|
|
|
Plan assigned to (DRS) | 10/26/2006 | | 1/12/2007 | | PASS |
|
|
|
1/12/2007 17:46:54 DRS - activity updated through activity BLDA022 from case BLD06-03008.
|
Plan resubmittals requested | | | 12/19/2006 | | DONE |
|
|
|
Response from architect concerning correction of stairs for serving area over 250 sq. ft. and use of water cooler instead of drinking fountain still need to be addressed to meet code. Ned new application declaring the occupancy use change declared as "B" originally being changed to "M" Display / Sales and mezzanine "S1" storage.
|
Routing - PLAN CHECK | 12/12/2006 | | 12/19/2006 | | FAIL |
|
|
|
E-mailed plan review items still incorrectly answered in response from architect.
|
Plan resubmittals received | | | 12/18/2006 | | |
|
|
|
Received cover transmittal, plan review responses from Insight architects for the report dated 11/29/06 from PDS (3 Pgs), 2 copies of the structural calcs for the Mezzanine, 2 copies of structural calcs for the original building revisions, 2 copies of the following sheets--A0.0, A1.0, A2.0, NE1.0, M1.0, E1.0, A3, A4 and taken to Dan Stuart
|
Routing - PLANNING | 12/8/2006 | | 12/12/2006 | | PASS |
|
|
|
DRH03-00235, to SMS - Four new windows added to building and front entry reduced from double to single door from original approved plans - BLD04-00867. Is this okay.
|
Routing - PLAN CHECK | 12/6/2006 | | 12/8/2006 | | FAIL |
|
|
|
Re-routing to Sarah Schafer, Planning to review changes made to exterior from time of original approval.
|
Telephone call | | | 12/8/2006 | | DONE |
|
|
|
Call from Afsar Shakoori, building owner, checking on progress of plans. I told him he plan review comment needing to be addressed by the architect, Russ Phillips, were e-mailed to him on 11/30/06. He said he would call Russ and follow up.
|
1st review completed | | | 12/6/2006 | | FAIL |
|
|
|
Failed plan check.
|
Routing - FIRE | 11/30/2006 | | 12/6/2006 | | PASS |
|
|
|
See attached review comments.
|
Plan resubmittals requested | | | 11/30/2006 | | DONE |
|
|
|
Correction plan review list e-mailed to architect.
|
Routing - PLAN CHECK | 10/27/2006 | | 11/30/2006 | | FAIL |
|
|
|
Resubmittals required. Architect russ Phillips was e-mailed copy of plan review and items needing to be addressed by resubmittals.
|
Override - Parcel Holds | | | 11/30/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 11/30/2006 | | |
|
|
|
|
Plan Reviewer's activity | | | 11/30/2006 | | DONE |
|
|
|
E-mail to Sarah Schafer to see if she wants me to recirculate plans received for BLD06-03008 showing added exterior windows from what was approved on plans for BLD04-00867 (original).
|
Routing - PUBLIC WORKS | 10/26/2006 | | 10/27/2006 | | PASS |
|
|
|
|
Override - Parcel Holds | | | 10/20/2006 | | |
|
|
|
|
Override - Parcel Holds | | | 10/19/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/19/2006 | | DONE |
|
|
|
|
Application received | | | 10/18/2006 | | |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 10/18/2006 | | |
|
|
|
Called Louise about hold on parcel/ she said to take in and make sure it gets routed to her ///dld
|
CHANGE STATUS TO (PND) | | | 10/18/2006 | | |
|
|
|
waiting for initial plan check fee to be paid, as there was no check to pay with ///dld
|
Third Notice BLD | 7/18/2007 | 7/18/2007 | | | |
|
|
|
Second Notice has not been responded to.
|