BLD-Aging Inspection | 10/4/2010 | 10/4/2010 | 10/6/2010 | | CANC |
Jim Sly
|
|
|
|
BLD-Final | 10/4/2010 | 10/4/2010 | 10/4/2010 | P | DONE |
Jim Sly
|
|
|
EXP.
|
DOC - Permit Expired | 10/4/2010 | 10/4/2010 | 10/4/2010 | P | PASS |
Jim Sly
|
|
|
|
Plan assigned to (CJW) | 5/29/2007 | | 6/22/2007 | | CANC |
|
|
|
Drawings were inappropriately submitted as a plan modification to this permit. The plan modification was not done. A tenant improvement application with plans was required to be submitted. See permit BLD-7-01642 for that project.
|
CHANGE STATUS TO (ISS) | | | 6/21/2007 | | DONE |
|
|
|
Plan modification submitted on 5/11/07 was determined by Carl Westfall that it needed to reviewed as seperate tenant improvement permit, refer to Bld07-01642 for TI//6/21/07 LEG
|
Routing - PUBLIC WORKS | 5/24/2007 | | 5/29/2007 | | PASS |
|
|
|
PLAN MODIFICATION
|
Routing PW Sewer Rating | 5/25/2007 | | 5/25/2007 | | PASS |
|
|
|
|
Plan Modification Accepted | | | 5/11/2007 | | |
|
|
|
Received plan modification for Bld06-03056 to modify bathroom, electric, add air conditioning and floor drain on pages A0.0, A0.1, A1.1, A2.1, A4.3, A6.1, E1.1, M0.0, M0.1, P1.1, P2.1, and revised certificate of value; taken to Carl Westfall//5/11/07 LEG
|
BLD-Aging Inspection | 3/2/2007 | 3/2/2007 | 3/5/2007 | | NR |
Jim Sly
|
|
|
|
Telephone call | | | 11/30/2006 | | DONE |
|
|
|
lft vm with ron sargent ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 11/30/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 11/30/2006 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 10/27/2006 | | 11/29/2006 | | PASS |
|
|
|
11/29/2006 12:44:25 CJW - activity updated through activity BLDA022 from case BLD06-03056.
|
Routing - FIRE | 11/25/2006 | | 11/29/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 11/29/2006 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 11/29/2006 | | 11/29/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 11/29/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 11/29/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 10/27/2006 | | 11/25/2006 | | PASS |
|
|
|
The IBC plan review was started on November 24, 2006 and was finished the next day. The drawings were approved. The plan review report is part of the approved drawings.
|
Routing - PUBLIC WORKS | 10/27/2006 | | 10/27/2006 | | PASS |
|
|
|
|
Pending Assignment by MYS | 10/24/2006 | | 10/27/2006 | | DONE |
|
|
|
10/27/2006 09:07:35 MYS - activity updated through activity BLDA172 from case BLD06-03056.
|
Plans ACCEPTED BY PLAN TECH | | | 10/24/2006 | | |
|
|
|
|
Application received | | | 10/23/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/23/2006 | | DONE |
|
|
|
|