Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-03074
StatusFinaled
Name WILLIAM MATTER
Site Address 10436 W OVERLAND RD
Project NameFIVE MILE PLAZA
Customer Number 
ePlanReviewNo
Description
(NO CONTRACTOR REGISTRATION PROVIDED. APPLICANT CERTIFIES EXEMPTION PER IDAHO STATUTE 54-5205.)(FIVE MILE PLAZA) To amend an existing Upgrade Agreement on file and upgrade some of the fire walls per approved plans. Some of the fire wall locations have changed. Work to include extending a portion of the parapet to a 30" minimum height on the existing 4-hour rated fire wall, providing (2) 2-hour rated extensions through the canopy at the 4-hour rated fire wall per approval by Fire Marshal and Building Official, providing other 2-hour rated extensions through the canopy, providing 3/4 hour rated exterior door and windows where required relative to closeness to one fire wall, providing 2-hour rated interior wall infill in an existing opening in one of the fire walls, and some electrical work. Once the canopy is opened up for construction, site conditions may require additional architectural or structural detail resubmittals to be provided for some of the fire wall extensions. Insulation work required under the Upgrade Agreement will occur under a separate permit. Special Inspection required for epoxy/adhesive anchor installations. This is a Scope of Work Permit. A Letter of Completion is to be issued when approved. NOTE: All buildings are fully fire sprinklered. JCB
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Case Summary (BLD)  2/22/2008 DONE
Third Notice BLD2/12/20072/12/20072/13/2007 DONE
Second Notice has not been responded to.
Second Notice BLD2/2/20072/2/20072/12/2007 DONE
First Notice has not been responded to.
First Notice1/22/20071/22/20072/2/2007 DONE
DetailsMike Jordan
BLD-Final1/19/20071/22/20071/22/2007APASS
DetailsMike Jordan
don; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
DOC - Permit Finaled1/22/20071/22/20071/22/2007PPASS
DetailsMike Jordan
Verified that nonelec. work was done. Letter of compliance issued. final ok.
FIRE-Final Inspection1/19/20071/22/20071/22/2007APASS
DetailsTroy Cobbley
life safety finaled
BLD-Framing/Rough-in1/16/20071/17/20071/17/2007APASS
DetailsMike Jordan
don; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
BLD-Framing/Rough-in12/21/200612/22/200612/22/2006PPASS
DetailsTom Arcoraci
Don; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett
BLD-Framing/Rough-in12/15/200612/15/200612/15/2006PPART
DetailsMike Jordan
Don; Phone #: ###-#### Internet Inspection Request from: Sherri Bennett. Inspected framing for 2hr wall infill and seperation walls in canopy. Noted that wood penetrations into fire walls are being allowed as per George Slane in canopy area with the addition of additional sprinkler heads in canopy.
BLD-Conference12/5/200612/6/200612/6/2006AFAIL
DetailsMike Jordan
don ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Issued C/N to contractor noting architect to provide approved thruogh penetration listing for wood penetrations on firewalls in canopy sections as per sec. 712.3 ( Must meet requirements of ASTM E119 and E814.) Details to be submitted and approved by plan reveiw.
FIRE-Conference12/4/200612/4/200612/4/2006PDONE
DetailsTroy Cobbley
Don and I went over requirements for the final inspection. I told him a fire sprinkler contractor needs to verify correct sprinkler coverage on either side of the new walls in the canopy.
BLD-Conference12/4/200612/4/200612/4/2006PPART
DetailsMike Jordan
don ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Reviewed approved plans. Contractor to get additional details for 2hr. wall in canopy and for infill wall. Noted that their will be existing 2x6 rafter penetrations in rated walls in canopy.
Issue PAID IN FULL permit  11/28/2006 DONE
Telephone call  11/27/2006  
tlk to bill matter that permit and fees are ready to be picked up
1st review completed  11/22/2006 PASS
Routing - PLAN CHECK11/22/2006 11/22/2006 PASS
Permit and plans approved and taken to front desk.
PLANS/APPL TAKEN TO FRONT DESK  11/22/2006 PASS
Inspection Record Card- Bld  11/22/2006 DONE
Telephone call  11/22/2006 DONE
TLK TO ASSOC WITH MATTHEW WITT ###-#### THAT PERMIT AND FEES ARE READY TO BE PICKED UP
Permit Ready to Issue  11/22/2006 DONE
Plan assigned to (JCB)10/25/2006 11/22/2006 PASS
11/22/2006 13:27:28 JCB - activity updated through activity BLDA022 from case BLD06-03074.
Routing - FIRE11/20/2006 11/22/2006 PASS
Attached review comments to plans. Attached to the issue set of plans is a copy of the upgrade agreement with specific items to be inspected, which is located on page #6.
Routing - Erosion and Sediment11/17/2006 11/20/2006 PASS
ESC waiver request approved with attached conditions.
Routing - PLAN CHECK11/9/2006 11/17/2006 PEND
Plan review e-mailed to architect. No response required. Plans to route to Erosion & Sediment Control and then to the Fire Department. When approved by these Sections, the permit can be issued.
Plan resubmittals received  11/9/2006  
Received 1 copy of response letter from Bill Matter, 1 copy of Registered Design Professional in Responsible Charge, 2 copies of 4 pages of Firelite NT safety rated glass info, 2 copies of 1 pg of wall section, 2 copies of 1 pg of colums, 2 copies of 1 pg of beams & trusses, 2 copies of sheets--A5A, A4A and taken to Jason Blais
Routing - PLANNING11/8/2006 11/9/2006 PASS
Sarah Schafer. Existing exterior double doors on one tenant being replaced with one rated door and rated sidelight. One existing exterior window to be removed and infilled with rated exterior wall in lieu of providing a rated window. Parapet on fire wall between Albertsons and rest of shops being extended to 30" minimum above roof. All this work is to comply with an Upgrade Agreement on file.
Routing - PLAN CHECK10/25/2006 11/6/2006 PEND
Bill Matter came in and will be providing a few additional details to attach to the plans and the Registered Design Professional form signed by the owner. He will also be providing an ESC Application and waiver letter. Will route the plans to Sarah Schafer for approval.
Plans ACCEPTED BY PLAN TECH  10/25/2006  
Application received  10/24/2006  
Recd Pcfee & Taken To Pln CK  10/24/2006