Second Notice BLD | 7/18/2007 | 7/18/2007 | 7/24/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 7/3/2007 | 7/3/2007 | 7/18/2007 | | DONE |
Dave Hannah
|
|
|
|
BLD-Final | 7/3/2007 | 7/3/2007 | 7/3/2007 | P | PASS |
Dave Hannah
|
|
|
|
DOC - Permit Finaled | 7/3/2007 | 7/3/2007 | 7/3/2007 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 6/29/2007 | 7/3/2007 | 7/3/2007 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/29/2007 at 2:45:05 PM. Contact: ###-####. needs hand rails
|
FIRE-Final Inspection | 6/29/2007 | 7/2/2007 | 7/2/2007 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
BLD-Wall cover | 6/12/2007 | 6/13/2007 | 6/14/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 6/12/2007 at 2:07:31 PM. Contact: ###-####. ok to cover ceiling
|
BLD-Wall cover | 5/30/2007 | 5/31/2007 | 5/31/2007 | A | CANC |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 5/30/2007 at 6:38:08 AM. Contact: ###-####.
|
BLD-Wall cover | 4/24/2007 | 4/25/2007 | 4/25/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/24/2007 at 9:54:00 AM. Contact: ###-####. ok to cover wall ? on duct work though brick wall
|
Plan resubmittals received | | | 3/22/2007 | | |
|
|
|
received letter of transmittal & fire resistance ratings (13) pages total--paperwork taken to dan stuart
|
FIRE-Conference | 1/4/2007 | 1/5/2007 | 1/5/2007 | A | DONE |
Forrest France
|
|
|
On site confrence to discuss demo schedule for the remodel area as it affects the existing fire sprinkler system. Contractor agreed to leave the CPVC system in service until such time as the combustible loading and debris within the space are removed, after which time the CPVC system may be isolated to the remodel area only and a fire watch by hospital security is to be implemented until such time as the new sprinkler system piping is installed per permit scope.
|
Issue & PRINT to be Invoiced | | | 12/15/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/11/2006 | | DONE |
|
|
|
lft ms with secretary for curtis ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 12/11/2006 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/7/2006 | | 12/8/2006 | | PASS |
|
|
|
Routing to permit desk to issue permit.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/8/2006 | | PASS |
|
|
|
|
Inspection Record Card- Bld | | | 12/8/2006 | | DONE |
|
|
|
|
Plan assigned to (DRS) | 10/31/2006 | | 12/8/2006 | | PASS |
|
|
|
12/8/2006 06:36:35 DRS - activity updated through activity BLDA022 from case BLD06-03086.
|
Routing - FIRE | 12/4/2006 | | 12/7/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 12/7/2006 | | PASS |
|
|
|
|
Print Pending Permit.LaserJet4 | | | 12/4/2006 | | |
|
|
|
|
Case Summary (BLD) | | | 12/4/2006 | | |
|
|
|
|
Routing - PLAN CHECK | 11/3/2006 | | 12/4/2006 | | PEND |
|
|
|
No resubmittals required. Routing to fire code analyst for review.
|
Routing - PLUMBING | | | 11/3/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 10/31/2006 | | 10/31/2006 | | PASS |
|
|
|
|
Pending Assignment by MYS | 10/25/2006 | | 10/31/2006 | | DONE |
|
|
|
10/31/2006 12:17:22 MYS - activity updated through activity BLDA168 from case BLD06-03086.
|
Plans ACCEPTED BY PLAN CHECK | | | 10/27/2006 | | |
|
|
|
|
Application received | | | 10/25/2006 | | |
|
|
|
|