Second Notice BLD | 1/9/2008 | 1/9/2008 | 3/5/2008 | | DONE |
Cathy Brown
|
|
|
First Notice has not been responded to.
|
First Notice | | 11/30/2007 | 1/9/2008 | | DONE |
|
|
|
|
BLD-Final | 11/29/2007 | 11/30/2007 | 11/30/2007 | A | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-####
|
FIRE-Final Inspection | 11/30/2007 | 11/30/2007 | 11/30/2007 | P | PASS |
Forrest France
|
|
|
Corrections have been verified for compliance, fire life safety finaled.
|
FIRE-Final Inspection | 11/30/2007 | 11/30/2007 | 11/30/2007 | A | PEND |
Forrest France
|
|
|
|
Override - People Holds | | | 11/30/2007 | | |
|
|
|
|
Permanent Occupancy UNPAID FEE | | | 11/30/2007 | | DONE |
|
|
|
|
Override - People Holds | | | 11/30/2007 | | |
|
|
|
|
FIRE-Final Inspection | 11/29/2007 | 11/29/2007 | 11/29/2007 | P | NR |
Forrest France
|
|
|
|
FIRE-Final Inspection | 11/27/2007 | 11/28/2007 | 11/28/2007 | A | FAIL |
Forrest France
|
|
|
Missing required fire extinguishers at the cleanroom area, one wall mounted av needs to be reinstalled, need project related fire alarm permit final. EM lighting and exit signs tested acceptable, remainder of fire life safety items are satisfactory.
|
FIRE-Final Inspection | 11/13/2007 | 11/13/2007 | 11/14/2007 | P | NR |
Forrest France
|
|
|
Brian; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
|
Code Occupancy Approval | 10/24/2007 | 10/24/2007 | 10/24/2007 | P | PASS |
Michael Garner
|
|
|
site inspection complete - I found the landscaping and parking lot in compliance with approved plans/conditions of approval - PASS
|
FIRE-Final Inspection | 10/23/2007 | 10/23/2007 | 10/23/2007 | P | NR |
Forrest France
|
|
|
Need project related fire alarm and fire sprinkler permits finaled prior to building life safety final.
|
FIRE-Conference | 9/11/2007 | 9/12/2007 | 9/12/2007 | A | DONE |
Forrest France
|
|
|
On site conference regarding first floor life safety including fire alarm and sprinkler work for the first floor office area only.
|
BLD-Final | 9/11/2007 | 9/12/2007 | 9/12/2007 | A | PASS |
Jim Storey
|
|
|
Brian Phone #: ###-#### temp occ. aproved for use of office ( b occupancies ) all sign offs are complet and all life saftey code compliance has been achived.
|
BLD-Framing/Rough-in | 9/6/2007 | 9/7/2007 | 9/11/2007 | A | PART |
Jim Storey
|
|
|
brian Phone #: ###-#### set up tenp occ card for sign off to occupy b office area. all good pending fires inspection and aproval.
|
Code Occupancy Approval Temp | | | 8/30/2007 | | DONE |
|
|
|
Temp occ approved based on the submission of a $128 bond by McAlvain Construction for extensive landscaping and parking lot striping, to be completed on or before 11/1/07. The actual work is priced at $115,000, with a 10% fee.
The building will be used by techs only thru 11/1 with no actual occupancy until after the first of Dec.
|
FIRE-Final Inspection | 8/29/2007 | 8/29/2007 | 8/29/2007 | P | CANC |
Troy Cobbley
|
|
|
Due to the abundance of inspections today there was not adequate time to perform this one. It will need to be rescheduled.
|
BLD-Aging Inspection | 6/15/2007 | 6/15/2007 | 6/22/2007 | | PASS |
Jim Storey
|
|
|
wip
|
(F) Reprint permit | | | 3/8/2007 | | |
|
|
|
|
Issue & PRINT to be Invoiced | | | 3/7/2007 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 10/26/2006 | 10/26/2006 | 3/6/2007 | | PASS |
|
|
|
3/6/2007 14:44:08 JCM - activity updated through activity BLDA022 from case BLD06-03088.
|
Routing - PLAN CHECK | 12/18/2006 | | 3/6/2007 | | PASS |
|
|
|
|
Routing - FIRE | 3/6/2007 | | 3/6/2007 | | PASS |
|
|
|
|
Routing - PLAN CHECK | 3/6/2007 | | 3/6/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/6/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/6/2007 | | DONE |
|
|
|
|
Telephone call | | | 3/6/2007 | | DONE |
|
|
|
E-mailed Paul that permit is ready & fees///3/6/07 @ 3:15pm BAS
|
Plan resubmittals received | | | 3/2/2007 | | DONE |
|
|
|
Recieved fire flow documentation dated, 3/1/07.
|
Plan resubmittals requested | | | 2/16/2007 | | DONE |
|
|
|
E-mailed a letter to the architect requesting final revisions for this project. JCM
|
Plan resubmittals received | | | 2/16/2007 | | DONE |
|
|
|
Paul dropped off a response letter to John Menard, an e-mail on fire flow testing, and ACHD correspondence and an e-mail. Will forward response letter to John Menard, discuss fire flow e-mail with Fire Plan Review, and discuss ACHD correspondence with Permit Technicians.
|
Plan resubmittals received | | | 1/10/2007 | | |
|
|
|
received 1 cover transmittal - 1 copy 5 pg response letter, 3 copies of the following spec. booklet - sheets go.92, en.01, a2.1.01, a2.1b.01, a2.1c.01, a2.1d.01, a2.3.01, a2.3a.01, a2.3c.01, a2.b.01, a2.ba.01, a5.01, a5.02, as0.01, av2.1.01, av2.3.01, av2.b.01, ax2.1.01, ax2.3.01, ax2.b.01, el2.bb.01, and taken to john menard
|
Routing Off Site - STRUCTURAL | 12/11/2006 | | 12/19/2006 | | PASS |
|
|
|
Called Action Courier for pick up @1:20pm on 12/11/06 BAS - Received letter from consulting structural engineer approving rsubmittals. JCM
|
Routing - FIRE | 12/13/2006 | | 12/18/2006 | | FAIL |
|
|
|
Faxed resubmittal item to Paul Marcolina and Ron Gates. Attached review comments to plans.
|
1st review completed | | | 12/18/2006 | | FAIL |
|
|
|
|
Plan resubmittals requested | | | 12/13/2006 | | DONE |
|
|
|
E-mailed the applicant a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 11/6/2006 | | 12/13/2006 | | FAIL |
|
|
|
John Menard
|
Plan resubmittals received | | | 12/8/2006 | | |
|
|
|
Received 1 cover transmittal, 3 copies of response to city structural calcs only, 3 copies of sheets--G0.91, S0.01, S0.02, S2.1a.01, S2.1b.01, S5.04 and taken to John Menard
|
Plan resubmittals received | | | 11/30/2006 | | |
|
|
|
Received transmittal letter, 5pg. letter from Derek A. White (Eng.) on code review, 25pg. Engineering Analysis, 2 copies of the following pages: G0.90, A2.1.01, A2.1A.01, A2.1B.01, A2.1C.01, A2.1D.01, A5.01, A5.02, AV2.1.01, AX2.1.01, EL2.1A.01, EL2.1B.01, EL2.1C.01, EP2.1C.02, EP2.UC.02; taken to John Menard
|
Routing Off Site - STRUCTURAL | 10/27/2006 | | 11/9/2006 | | FAIL |
|
|
|
Called Action Courier for pick up @12:10 on 10/26/06 BAS - Received e-mailed comment list from the consulting structural engineer requesting revisions. JCM
|
Plan resubmittals requested | | | 11/9/2006 | | DONE |
|
|
|
E-mailed the architect a copy of the structural review. JCM
|
Plan resubmittals received | | | 11/6/2006 | | |
|
|
|
Received 4 copies of page EN.01; taken to John Menard
|
Routing - PLANNING | 11/3/2006 | | 11/6/2006 | | PASS |
|
|
|
drh06-00354 Sarah Schafer
Approved per DRH06-00354.
|
Routing - Erosion and Sediment | 11/1/2006 | | 11/3/2006 | | PASS |
|
|
|
No ESC permiting required.
|
Routing - PLUMBING | 11/3/2006 | | 11/3/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PUBLIC WORKS | 10/31/2006 | | 11/1/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 10/26/2006 | | 10/31/2006 | | PASS |
|
|
|
|
Application received | | | 10/26/2006 | | |
|
|
|
|
Pending Assignment by MYS | 10/26/2006 | | 10/26/2006 | | DONE |
|
|
|
10/26/2006 09:31:06 B_S - activity updated through activity BLDA166 from case BLD06-03088.
|
Plans ACCEPTED BY PLAN TECH | | | 10/26/2006 | | |
|
|
|
|
Third Notice BLD | 3/5/2008 | 3/5/2008 | | | |
|
|
|
Second Notice has not been responded to.
|