Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-03088
StatusFinaled
Name MICRON TECHNOLOGY INC
Site Address 10136 S FEDERAL WAY
Project NameMICRON NANOFAB
Customer NumberC9793
ePlanReviewNo
Description
(Micron Nano Fab (01-9793) - To construct a new 112,315 square foot, three story, semiconductor fabrication facility and related site improvements. This building contains a fabrication area, support areas for the fabrication area, hazardous materials storage areas at the first floor and administrative office areas. 1st. Fl. (B Level) 28,715 sq. ft., 2nd. Fl. (Main Level) 61,150 sq. ft., 3rd. Fl. 22,450 sq. ft.. A partial footing and foundation permit was issued under BLD06-02671. All construction per the approved plans and attached comment list. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD1/9/20081/9/20083/5/2008 DONE
DetailsCathy Brown
First Notice has not been responded to.
First Notice 11/30/20071/9/2008 DONE
BLD-Final11/29/200711/30/200711/30/2007APASS
DetailsJim Storey
Brian Phone #: ###-####
FIRE-Final Inspection11/30/200711/30/200711/30/2007PPASS
DetailsForrest France
Corrections have been verified for compliance, fire life safety finaled.
FIRE-Final Inspection11/30/200711/30/200711/30/2007APEND
DetailsForrest France
Override - People Holds  11/30/2007  
Permanent Occupancy UNPAID FEE  11/30/2007 DONE
Override - People Holds  11/30/2007  
FIRE-Final Inspection11/29/200711/29/200711/29/2007PNR
DetailsForrest France
FIRE-Final Inspection11/27/200711/28/200711/28/2007AFAIL
DetailsForrest France
Missing required fire extinguishers at the cleanroom area, one wall mounted av needs to be reinstalled, need project related fire alarm permit final. EM lighting and exit signs tested acceptable, remainder of fire life safety items are satisfactory.
FIRE-Final Inspection11/13/200711/13/200711/14/2007PNR
DetailsForrest France
Brian; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt
Code Occupancy Approval10/24/200710/24/200710/24/2007PPASS
DetailsMichael Garner
site inspection complete - I found the landscaping and parking lot in compliance with approved plans/conditions of approval - PASS
FIRE-Final Inspection10/23/200710/23/200710/23/2007PNR
DetailsForrest France
Need project related fire alarm and fire sprinkler permits finaled prior to building life safety final.
FIRE-Conference9/11/20079/12/20079/12/2007ADONE
DetailsForrest France
On site conference regarding first floor life safety including fire alarm and sprinkler work for the first floor office area only.
BLD-Final9/11/20079/12/20079/12/2007APASS
DetailsJim Storey
Brian Phone #: ###-#### temp occ. aproved for use of office ( b occupancies ) all sign offs are complet and all life saftey code compliance has been achived.
BLD-Framing/Rough-in9/6/20079/7/20079/11/2007APART
DetailsJim Storey
brian Phone #: ###-#### set up tenp occ card for sign off to occupy b office area. all good pending fires inspection and aproval.
Code Occupancy Approval Temp  8/30/2007 DONE
Temp occ approved based on the submission of a $128 bond by McAlvain Construction for extensive landscaping and parking lot striping, to be completed on or before 11/1/07. The actual work is priced at $115,000, with a 10% fee.

The building will be used by techs only thru 11/1 with no actual occupancy until after the first of Dec.
FIRE-Final Inspection8/29/20078/29/20078/29/2007PCANC
DetailsTroy Cobbley
Due to the abundance of inspections today there was not adequate time to perform this one. It will need to be rescheduled.
BLD-Aging Inspection6/15/20076/15/20076/22/2007 PASS
DetailsJim Storey
wip
(F) Reprint permit  3/8/2007  
Issue & PRINT to be Invoiced  3/7/2007 DONE
Plan assigned to (JCM)10/26/200610/26/20063/6/2007 PASS
3/6/2007 14:44:08 JCM - activity updated through activity BLDA022 from case BLD06-03088.
Routing - PLAN CHECK12/18/2006 3/6/2007 PASS
Routing - FIRE3/6/2007 3/6/2007 PASS
Routing - PLAN CHECK3/6/2007 3/6/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/6/2007 DONE
Permit Ready to Issue  3/6/2007 DONE
Print Occupancy Form  3/6/2007 DONE
Telephone call  3/6/2007 DONE
E-mailed Paul that permit is ready & fees///3/6/07 @ 3:15pm BAS
Plan resubmittals received  3/2/2007 DONE
Recieved fire flow documentation dated, 3/1/07.
Plan resubmittals requested  2/16/2007 DONE
E-mailed a letter to the architect requesting final revisions for this project. JCM
Plan resubmittals received  2/16/2007 DONE
Paul dropped off a response letter to John Menard, an e-mail on fire flow testing, and ACHD correspondence and an e-mail. Will forward response letter to John Menard, discuss fire flow e-mail with Fire Plan Review, and discuss ACHD correspondence with Permit Technicians.
Plan resubmittals received  1/10/2007  
received 1 cover transmittal - 1 copy 5 pg response letter, 3 copies of the following spec. booklet - sheets go.92, en.01, a2.1.01, a2.1b.01, a2.1c.01, a2.1d.01, a2.3.01, a2.3a.01, a2.3c.01, a2.b.01, a2.ba.01, a5.01, a5.02, as0.01, av2.1.01, av2.3.01, av2.b.01, ax2.1.01, ax2.3.01, ax2.b.01, el2.bb.01, and taken to john menard
Routing Off Site - STRUCTURAL12/11/2006 12/19/2006 PASS
Called Action Courier for pick up @1:20pm on 12/11/06 BAS - Received letter from consulting structural engineer approving rsubmittals. JCM
Routing - FIRE12/13/2006 12/18/2006 FAIL
Faxed resubmittal item to Paul Marcolina and Ron Gates. Attached review comments to plans.
1st review completed  12/18/2006 FAIL
Plan resubmittals requested  12/13/2006 DONE
E-mailed the applicant a copy of the plan review requesting revisions. JCM
Routing - PLAN CHECK11/6/2006 12/13/2006 FAIL
John Menard
Plan resubmittals received  12/8/2006  
Received 1 cover transmittal, 3 copies of response to city structural calcs only, 3 copies of sheets--G0.91, S0.01, S0.02, S2.1a.01, S2.1b.01, S5.04 and taken to John Menard
Plan resubmittals received  11/30/2006  
Received transmittal letter, 5pg. letter from Derek A. White (Eng.) on code review, 25pg. Engineering Analysis, 2 copies of the following pages: G0.90, A2.1.01, A2.1A.01, A2.1B.01, A2.1C.01, A2.1D.01, A5.01, A5.02, AV2.1.01, AX2.1.01, EL2.1A.01, EL2.1B.01, EL2.1C.01, EP2.1C.02, EP2.UC.02; taken to John Menard
Routing Off Site - STRUCTURAL10/27/2006 11/9/2006 FAIL
Called Action Courier for pick up @12:10 on 10/26/06 BAS - Received e-mailed comment list from the consulting structural engineer requesting revisions. JCM
Plan resubmittals requested  11/9/2006 DONE
E-mailed the architect a copy of the structural review. JCM
Plan resubmittals received  11/6/2006  
Received 4 copies of page EN.01; taken to John Menard
Routing - PLANNING11/3/2006 11/6/2006 PASS
drh06-00354 Sarah Schafer
Approved per DRH06-00354.
Routing - Erosion and Sediment11/1/2006 11/3/2006 PASS
No ESC permiting required.
Routing - PLUMBING11/3/2006 11/3/2006 PASS
per plans and 2003 upc
Routing - PUBLIC WORKS10/31/2006 11/1/2006 PASS
Routing - PLANNING Land Div10/26/2006 10/31/2006 PASS
Application received  10/26/2006  
Pending Assignment by MYS10/26/2006 10/26/2006 DONE
10/26/2006 09:31:06 B_S - activity updated through activity BLDA166 from case BLD06-03088.
Plans ACCEPTED BY PLAN TECH  10/26/2006  
Third Notice BLD3/5/20083/5/2008   
Second Notice has not been responded to.