Third Notice BLD | 5/25/2007 | 5/25/2007 | 2/27/2009 | | DONE |
Patricia Smith
|
|
|
Second Notice has not been responded to.
|
Meeting | | | 2/27/2009 | | DONE |
|
|
|
no final cert of value ever received - signed off per RAD
|
Telephone call | | | 10/4/2007 | | DONE |
|
|
|
tlk to dave miller ###-#### regarding the final values that I need ASAP put due - he will be calling me back 8:35 am
|
Second Notice BLD | 5/9/2007 | 5/9/2007 | 5/25/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 4/19/2007 | 5/9/2007 | | DONE |
|
|
|
|
Permanent occupancy | | | 4/11/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11526 issued 4-11-07 to Health Management Systems.
|
BLD-Final | 4/6/2007 | 4/9/2007 | 4/9/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/6/2007 at 2:15:24 PM. Contact: ###-####. ok for perm occ
|
Permanent Occupancy | | 4/9/2007 | 4/9/2007 | | DONE |
|
|
|
|
BLD-Final | 3/28/2007 | 3/29/2007 | 3/29/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 3/28/2007 at 1:22:49 PM. Contact: ###-####. ok for temp occ ok for perm occ after elec gos perm
|
FIRE-Final Inspection | 3/20/2007 | 3/21/2007 | 3/21/2007 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Other | 2/19/2007 | 2/20/2007 | 2/20/2007 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/19/2007 at 2:35:45 PM. Contact: ###-####. ok to cover ceiling
|
BLD-Other | 2/15/2007 | 2/16/2007 | 2/16/2007 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/15/2007 at 12:25:39 PM. Contact: ###-####. ok to cover ceiling c/n issued need to remove paper backed insulation and repair fire blocking at curtain wall
|
(F) Reprint permit | | | 1/23/2007 | | DONE |
|
|
|
|
BLD-Framing/Rough-in | 1/15/2007 | 1/16/2007 | 1/16/2007 | P | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 1/15/2007 at 1:29:13 PM. Contact: ###-####. framing ok need to address fire pannel and heater box in 2hr wall as well as penatrations.
|
Issue PAID IN FULL permit | | | 12/26/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/22/2006 | | |
|
|
|
called Katie Butler ###-#### and left voice message that permit is ready and fee
|
Permit Ready to Issue | | | 12/22/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/21/2006 | | DONE |
|
|
|
|
Print Occupancy Form | | | 12/21/2006 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 10/31/2006 | | 12/21/2006 | | PASS |
|
|
|
12/21/2006 07:26:03 CJW - activity updated through activity BLDA022 from case BLD06-03110.
|
Routing - PLAN CHECK | 12/8/2006 | | 12/21/2006 | | PASS |
|
|
|
Drawings approved after resubmittal review.
|
Plan resubmittals received | | | 12/15/2006 | | |
|
|
|
Received transmittal letter, 2pg. response letter, 2 copies of the following pages: A2.1, A6.1, A8.1, A10.1; Taken to Carl Westfall
|
Routing - FIRE | 12/5/2006 | | 12/8/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 12/8/2006 | | FAIL |
|
|
|
Failed plan check.
|
Routing - PLAN CHECK | 11/1/2006 | | 12/5/2006 | | FAIL |
|
|
|
The IBC plan review was started on December 4, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
|
Routing - PUBLIC WORKS | 10/31/2006 | | 11/1/2006 | | PASS |
|
|
|
|
Pending Assignment by MYS | 10/27/2006 | | 10/31/2006 | | DONE |
|
|
|
10/31/2006 15:16:45 MYS - activity updated through activity BLDA172 from case BLD06-03110.
|
Plans ACCEPTED BY PLAN TECH | | | 10/30/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/27/2006 | | |
|
|
|
|
Application received | | | 10/27/2006 | | |
|
|
|
|