Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD06-03114
StatusFinaled
Name BOWN CROSSING BLDG D RESIDENTIAL
Site Address 3066 S BOWN WAY
Project NameBown Crossing Market Place
Customer Number 
ePlanReviewNo
Description
BOWN CROSSING MARKET PLACE - BLDG D - 2nd floor CONDO UNITS D2/D3/D4) To finish the second floor for three condominium units. Unit A is 1,060 square feet, unit B is 780 square feet, unit C is 995 square feet. This building is fully fire sprinklered per NFPA 13. All construction per the approved plans and attached comment list. NOTE: Dave Abo must approve this project prior to the issuance of the Certificate of Occupancy. See attached document showing approved alternate for increase of travel distance to the exit. MJP
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD10/30/200710/30/200712/7/2007 DONE
Second Notice has not been responded to.
Second Notice BLD10/17/200710/17/200710/30/2007 DONE
First Notice has not been responded to.
First Notice 10/4/200710/17/2007 DONE
BLD-Final10/3/200710/4/200710/4/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/3/2007 at 2:19:33 PM. Contact: ###-####.
Permanent Occupancy  10/4/2007 DONE
FIRE-Final Inspection10/3/200710/3/200710/3/2007PPASS
DetailsForrest France
C/N items are finished, fire life safety finaled.
BLD-Final10/2/200710/2/200710/2/2007PCANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 10/2/2007 at 8:43:26 AM. Contact: ###-####.
FIRE-Final Inspection10/1/200710/2/200710/2/2007AFAIL
DetailsForrest France
Missing the required PFE, need to replace two fire sprinkler heads in the common exit stairway-one at the top, one at the bottom landing, install missing escutcheons in unit 203.
BLD-Final9/25/20079/26/20079/27/2007PFAIL
DetailsJim Storey
Scheduled by a contractor via Hello! on 9/25/2007 at 2:44:36 PM. Contact: ###-####.
BLD-Framing/Rough-in7/10/20077/11/20077/11/2007APASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/10/2007 at 3:38:51 PM. Contact: ###-####.
BLD-Framing/Rough-in7/5/20077/6/20077/6/2007PNR
DetailsJim Storey
Scheduled by a contractor via Hello! on 7/5/2007 at 11:11:48 AM. Contact: ###-####. fire failled/ fire walls not complet.
BLD-Framing/Rough-in5/11/20075/14/20075/14/2007APART
DetailsJim Storey
BOB NOTE: PARTIAL; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Routing - PLANNING Land Div4/30/2007 4/30/2007 PASS
Instrument No. 106189614 revision to condo plat on 12/05/06
Override - Parcel Holds  3/21/2007  
Issue PAID IN FULL permit  3/21/2007 DONE
Override - Parcel Holds  3/7/2007  
Permit Ready to Issue  3/7/2007  
Telephone call  3/6/2007 DONE
t/c w kay at erstad architects ###-#### - permit ready and fees given - also need gc name and rce#
Plan assigned to (M_P)11/2/2006 3/5/2007 PASS
3/5/2007 15:28:04 M_P - activity updated through activity BLDA022 from case BLD06-03114.
Routing - PLAN CHECK2/13/2007 3/5/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  3/5/2007 DONE
Override - Parcel Holds  3/5/2007  
Print Occupancy Form  3/5/2007 DONE
Routing - PLAN CHECK12/18/2006 2/13/2007 FAIL
Exit travel distance to an exit has been exceeded, Talked to Matt @ Erstad's office and discussed a possible alternate request, to be submitted for the Building Official's approval.
Plan resubmittals received  12/20/2006  
Received transmittal letter, 1pg. response letter, and one copy of sketch a.1 & sketch a.2; taken to Mike Phillips
Routing - PLAN CHECK11/20/2006 12/18/2006 FAIL
Second review failed, sent correction report to the architect requesting additional information to be submitted for further review prior to issuing permit.
Plan resubmittals received  12/5/2006  
Received transmittal letter, 1pg. response letter, copy of letter and plan review report from Boise City, and 2 copies of the following pages: a0.11, a2.11, a5.11, a6.11; taken to Mike Phillips
1st review completed  11/20/2006 FAIL
Failed plan check.
Routing - FIRE11/16/2006 11/20/2006 PASS
Attached review comments to plans.
Routing - PLAN CHECK11/9/2006 11/15/2006 FAIL
Plan review completed, sent correction report to the architect requesting additional information
Routing - PUBLIC WORKS11/7/2006 11/9/2006 PASS
Routing - PLANNING Land Div11/2/2006 11/7/2006 FAIL
Pending Assignment by MYS10/27/2006 11/2/2006 DONE
11/2/2006 12:12:37 MYS - activity updated through activity BLDA170 from case BLD06-03114.
Plans ACCEPTED BY PLAN TECH  10/30/2006  
Application received  10/27/2006  
Recd Pcfee & Taken To Pln CK  10/27/2006