Telephone call | | | 3/27/2007 | | DONE |
|
|
|
call to carrie w/ paige mec re final value, she will have joe paige call back with that figure. (2nd call)
|
Third Notice BLD | 3/21/2007 | 3/21/2007 | 3/22/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Telephone call | | | 3/22/2007 | | DONE |
|
|
|
call to paige mech, carrie will have joe paige call re FV on this job
|
Second Notice BLD | 3/8/2007 | 3/8/2007 | 3/21/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 2/21/2007 | 3/8/2007 | | DONE |
|
|
|
|
BLD-Final | 2/20/2007 | 2/21/2007 | 2/21/2007 | P | PASS |
Dave Hannah
|
|
|
tim; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok for perm occ
|
FIRE-Final Inspection | 2/20/2007 | 2/21/2007 | 2/21/2007 | A | PASS |
Troy Cobbley
|
|
|
Life safety finaled. Items on correction notice have been corrected.
|
FIRE-Final Inspection | 2/20/2007 | 2/20/2007 | 2/21/2007 | P | CANC |
Troy Cobbley
|
|
|
No time for inspection. To be rescheduled for tomorrow
|
Permanent occupancy | | | 2/21/2007 | | DONE |
|
|
|
Perm. Occ. Cert. # 11447 issued 2-21-07 to Urban Outfitters.
|
Permanent Occupancy | | 2/20/2007 | 2/20/2007 | | DONE |
|
|
|
|
BLD-Final | 2/15/2007 | 2/16/2007 | 2/16/2007 | P | FAIL |
Dave Hannah
|
|
|
TIM; Phone #: ###-#### as late in the afternoon as possible Internet Inspection Request from: Victoria Beall needs fire sign offs and finish installing door hardwear
|
FIRE-Final Inspection | 2/15/2007 | 2/15/2007 | 2/15/2007 | P | FAIL |
Forrest France
|
|
|
Missing address numbers, provide signage at the main entry/exit door, one emergency light did not operate, need to mount one additional PFE, need to final the project related FA permit.
|
BLD-Other | 1/25/2007 | 1/26/2007 | 1/26/2007 | A | PASS |
Dave Hannah
|
|
|
tim t-bar grid inspection; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Other | 1/11/2007 | 1/12/2007 | 1/12/2007 | A | PART |
Dave Hannah
|
|
|
tim - needs fire proofing inspected; Phone #: ###-#### Internet Inspection Request from: Patricia Smith ok to cover columns
|
BLD-Energy code compliance | 1/9/2007 | 1/10/2007 | 1/10/2007 | A | PASS |
Dave Hannah
|
|
|
time; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover ext walls
|
BLD-Framing/Rough-in | 1/4/2007 | 1/5/2007 | 1/5/2007 | A | PASS |
Dave Hannah
|
|
|
TIM; Phone #: ###-#### Internet Inspection Request from: Cathy Chilesok to insulate ext walls ok to cover int walls
|
Issue PAID IN FULL permit | | | 1/4/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 1/3/2007 | | |
|
|
|
|
Permit Ready to Issue | | | 1/3/2007 | | |
|
|
|
|
Telephone call | | | 1/3/2007 | | DONE |
|
|
|
talked to tim escriua at ###-#### permit is ready
|
Routing - FIRE | 1/2/2007 | | 1/2/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLAN CHECK | 1/2/2007 | | 1/2/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/2/2007 | | DONE |
|
|
|
|
Plan assigned to (CJW) | 11/3/2006 | | 1/2/2007 | | PASS |
|
|
|
1/2/2007 16:05:49 CJW - activity updated through activity BLDA022 from case BLD06-03118.
|
Routing - PLAN CHECK | 12/11/2006 | | 1/2/2007 | | PASS |
|
|
|
(12-23-06) Reviewed resubmitted drawings. Another copy was required. Emailed the Architect to let him know. (1-2-07) Drawings approved after additional copy was received and the resubmittal review was completed.
|
Plan resubmittals received | | | 12/28/2006 | | |
|
|
|
received 1 copy of the following sheets--A000, A005, A100, A103, A104, A104a, A2.2, A2.3, A5.2 and taken to Carl Westfall
|
Plan resubmittals received | | | 12/22/2006 | | |
|
|
|
Recieved 1 cover transmittal and 3 copies of M3.2 and taken to Carl Westfall
|
Plan resubmittals received | | | 12/22/2006 | | |
|
|
|
Received 1 copy of the following sheets--A000, A005, A100, A103, A104, A104a, A202, A203, A502 and taken to Carl Westfall
|
Plan resubmittals received | | | 12/19/2006 | | |
|
|
|
Received 1 cover transmittal and 3 copies of sheet M3.2 and taken to Carl Westfall
|
Plan resubmittals received | | | 12/15/2006 | | |
|
|
|
received plan review report (15) pages from paul l bosman architect. also "2" sets of plans including 2 sheets each of M2.2, AOOO, AOO5, A1OO, A1O4, A1O4A, A2O2, A2O3, A5O2. and "2" sheets each of M1.2, M2.2, & M1.1--plans taken to carl westfall
|
1st review completed | | | 12/11/2006 | | FAIL |
|
|
|
Failed plan check and fire.
|
Routing - FIRE | 12/7/2006 | | 12/11/2006 | | FAIL |
|
|
|
Faxed resubmittal item to architect. Attached review comments to plans.
|
Routing - PLAN CHECK | 11/7/2006 | | 12/7/2006 | | FAIL |
|
|
|
The IBC plan review was started on December 5, 2006 and was finished on December 7, 2006. Revised drawings were required. See the plan review report.
|
Plan Reviewer's activity | | | 11/17/2006 | | DONE |
|
|
|
PARTIAL PERMIT ISSUED at the request of Tim Escriva, the general contractor.
|
Early Start Permit | | | 11/17/2006 | | DONE |
|
|
|
|
Telephone call | | | 11/17/2006 | | DONE |
|
|
|
Spoke with Tim and told him that early start is ready///11/17/06 @ 11:15am BAS
|
MISC ACTIONS | | | 11/17/2006 | | |
|
|
|
picked up early start permit
|
Routing - PLANNING | 11/6/2006 | | 11/7/2006 | | PASS |
|
|
|
Approved per CZC06-00209.
|
Routing - PUBLIC WORKS | 11/3/2006 | | 11/6/2006 | | PASS |
|
|
|
|
Pending Assignment by MYS | 10/30/2006 | | 11/3/2006 | | DONE |
|
|
|
11/3/2006 16:06:34 MYS - activity updated through activity BLDA172 from case BLD06-03118.
|
Plans ACCEPTED BY PLAN TECH | | | 10/30/2006 | | |
|
|
|
|
Application received | | | 10/27/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 10/27/2006 | | DONE |
|
|
|
|