BLD-Final | 9/23/2008 | 9/25/2008 | 9/25/2008 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 9/23/2008 at 6:05:18 PM. Contact: ###-####.
|
DOC - Permit Finaled | 9/25/2008 | 9/25/2008 | 9/25/2008 | P | PASS |
Tony Young
|
|
|
done
|
BLD-Conference | 9/18/2008 | 9/25/2008 | 9/25/2008 | A | CANC |
Tony Young
|
|
|
jessica Phone #: ###-#### Disp set to [CANC] by a contractor via Hello! on Sep 25 2008 7:23AM.
|
BLD-Framing/Rough-in | 9/18/2007 | 9/19/2007 | 9/19/2007 | A | PASS |
Tony Young
|
|
|
jessica Phone #: ###-####
|
BLD-Framing/Rough-in | 9/14/2007 | 9/17/2007 | 9/17/2007 | A | FAIL |
Jim Sly
|
|
|
jessica Note: ok to cover Phone #: ###-#### Too many issues with engineered systems.......Complete per approved plan and Engineering ....or.......Have Engineer review as built and provide "stamped" letter of approval. Leave all paperwork on site for next insp.
|
BLD - Request for Extension | 9/13/2007 | 9/14/2007 | 9/13/2007 | | PASS |
Tony Young
|
|
|
Jessica ###-####
|
BLD-Conference | 9/13/2007 | 9/13/2007 | 9/13/2007 | P | PASS |
Tony Young
|
|
|
ok to keep active
|
BLD-Framing/Rough-in | 3/8/2007 | 3/8/2007 | 3/8/2007 | P | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/8/2007 at 9:36:45 AM. Contact: ###-####. will get letter ok ok on everything,, conf. on the job
|
BLD-Framing/Rough-in | 3/5/2007 | 3/6/2007 | 3/6/2007 | A | NR |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/5/2007 at 4:15:03 PM. Contact: ###-####. This is the 1st insp called in...........Eng shear panels, . Epoxy bolting, framing, siding, completed. No shear nailing insp completed. No approved plans on site. Need Engineering for shear........may have Engineer approve? Recall for insp with paperwork.
|
Routing Walk-In (Zoning) | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | DONE |
|
|
|
3/1/2007 13:34:24 SAH - activity updated through activity BLDI252 from case BLD06-03138.
|
Routing Walk-In (BLD) | 3/1/2007 | 3/1/2007 | 3/1/2007 | P | DONE |
|
|
|
3/1/2007 13:40:38 PEP - activity updated through activity BLDA022 from case BLD06-03138.
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/1/2007 | | DONE |
|
|
|
|
Case Summary (BLD) | | | 3/1/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 3/1/2007 | | |
|
|
|
|
CHANGE STATUS TO (ISS) | | | 3/1/2007 | | |
|
|
|
already issued previously
|
(F) Reprint permit | | | 3/1/2007 | | |
|
|
|
|
Routing Walk-In (BLD) | 2/27/2007 | 2/27/2007 | 2/27/2007 | P | FAIL |
|
|
|
resubmittals required for steel
|
Routing Walk-In (Zoning) | 10/31/2006 | 10/31/2006 | 10/31/2006 | A | PASS |
|
|
|
|
Routing Walk-In (BLD) | 10/31/2006 | 10/31/2006 | 10/31/2006 | A | DONE |
|
|
|
10/31/2006 14:15:02 PEP - activity updated through activity BLDA022 from case BLD06-03138.
|
Case Summary (BLD) | | | 10/31/2006 | | |
|
|
|
|
Inspection Record Card- Bld | | | 10/31/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 10/31/2006 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 10/31/2006 | | |
|
|
|
|
Application received | | | 10/31/2006 | | |
|
|
|
|