Permit Information
Permit NumberBLD06-03180
StatusFinaled
Name MORRISON VELMA V REVOCABLE TRUST
Site Address 815 E PARK BLVD
Project NameFALCON BLDG
Customer Number 
ePlanReviewNo
Description
(FALCON BUILDING - SHELL & CORE RENOVATION) To renovate an existing 38,057 sq.ft. 3 story office building shell, core area and exterior to comply with approved plans and DRH06-00334. No tenant improvements or occupancy under this permit. Work to include, new exterior ramp, stairs, patio and retaining wall, construction of core area exit access hallway and new accessible restrooms located on each floor, installation of suspended ceiling in hallways and core area, remodel west stair enclosure to create one hour rated exit enclosure, install new windows and storefronts, remove portion of second floor to create a large opening between the 1st & 2nd floors, installation of new elevator, installation of new HVAC roof top units and ducting, installation of new fire sprinkler system and alarm system per NFPA #13 as regulated by the fire department. Miscellaneous related finishes. RMH
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
PubWorks Occupancy Approval2/3/20102/3/20102/3/2010 DONE
DetailsTiffany Lowery
Telephone call  6/26/2008 DONE
DetailsTisha Gallop
Called Shawn and told him need final value and will be faxing another request. He said will fax back//6/26/08 4:00pm LEG
Code Occupancy Approval  4/3/2008 DONE
This sign-off is for the landscaping only at this site. The landscaping was completed per the bond which was posted by contractor.
Letter of compliance  4/3/2008 DONE
Letter of Compliance issued 4-3-08
BLD-Final1/9/20081/10/20081/10/2008APASS
DetailsDave Hannah
nick Phone #: ###-#### ok for c.c
Temporary Occupancy UNPAID FEE  1/10/2008 DONE
BLD-Final1/8/20081/8/20081/8/2008PNR
DetailsJim Sly
nick Phone #: ###-####
Need letter of approval from Eng. Check returns on handrails.....plus all other prev corr.
Code Occupancy Approval Temp  1/4/2008 DONE
Bond for the remaining landscape has been posted. Re-inspection for the FINAL will occur when the owner calls for a time and date.
FIRE-Final Inspection1/2/20081/3/20081/3/2008APASS
DetailsForrest France
Correction notice items are finished, sprinkler supervisory signals cleared by contractor, fire life safety inspection passed.
FIRE-Final Inspection12/26/200712/27/200712/27/2007AFAIL
DetailsForrest France
Need to repair EM lights at four locations including the exit discharges, provide signage at the door to the FACP room, one missing PFE provided while on site, need to final project related fire alarm permit and recieve copies of NFPA 72 record of completion.
BLD-Final12/12/200712/12/200712/13/2007PFAIL
DetailsDave Hannah
nick Phone #: ###-#### c/n on site
BLD-Conference9/11/20079/11/20079/12/2007PPASS
DetailsDave Hannah
nick Phone #: ###-####
BLD-Other9/5/20079/5/20079/5/2007PPASS
DetailsDave Hannah
hand rail; Nick; Phone #: ###-#### Internet Inspection Request from: Hattie James
BLD-Framing/Rough-in8/16/20078/17/20078/17/2007APART
DetailsDave Hannah
ceiling t-bar; Nick; Phone #: ###-#### Internet Inspection Request from: Hattie James hallways and top of stairs ok to cover
BLD-Other5/31/20076/1/20076/1/2007APART
DetailsDave Hannah
nick - ceiling; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ceiling west stair tower ok to cover
BLD-Other5/17/20075/17/20075/17/2007PPASS
DetailsDave Hannah
nick - caulking behind walls ; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in5/2/20075/2/20075/2/2007PPART
DetailsDave Hannah
Nick; Phone #: ###-#### Internet Inspection Request from: Andrea Whitema ok to cover entryway and rest room on 1st and 2nd floors shaft openning also ok
BLD-Framing/Rough-in4/24/20074/25/20074/25/2007APART
DetailsDave Hannah
Nick; Phone #: ###-#### Internet Inspection Request from: Victoria Beall core areas ok to cover walked project with nick
BLD-Footing2/8/20072/9/20072/9/2007APART
DetailsDave Hannah
nick ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith rebar for stair tower ftgs
Issue PAID IN FULL permit  1/25/2007 DONE
Telephone call  1/24/2007 DONE
spoke with someone from Russell Corp. about what fees ($18,971.81) are due and need ACHD
Permit Ready to Issue  1/22/2007 DONE
Routing - PLAN CHECK1/18/2007 1/19/2007 PASS
PLANS/APPL TAKEN TO FRONT DESK  1/19/2007 DONE
Inspection Record Card- Bld  1/19/2007 DONE
Plan assigned to (R_H)11/6/2006 1/19/2007 PASS
1/19/2007 07:06:56 RMH - activity updated through activity BLDA022 from case BLD06-03180.
Routing - FIRE1/17/2007 1/18/2007 PASS
Attached updated review comments to plans.
Routing - PLAN CHECK12/21/2006 1/17/2007 PEND
No corrections required by building department, routed plans to fire 12-17-07
Plan resubmittals received  1/16/2007  
Received 1pg. response letter, and two copies of the following pages: A2.3, A3.0, A3.1, A5.0, A5.1, A6.0, A9.0, A9.1, A9.2 ; taken to Ron Hill
Plan resubmittals received  1/16/2007  
Rec'd 2 copies of sheet # A6.0, A2.3 - taken to Ron Hill
Meeting  1/3/2007  
Met with Cory Nelson discussed stair enclosure issue, Cory stated that they were going to reconfigure stair to add landing and keep within enclosure, this will require structural and architectual resubmittals.
Plan resubmittals received  12/28/2006  
received transmittal letter to Ron Hill, 2pg. Plan Review Response, 2 copies of the following pages: A1.0, A2.0, A2.1, A2.2, A2.3, A2.4, A2.5, A5.0, A6.0, A7.0, A7.1, A9.0, A9.1; transmittal letter to Scott Arellano, 1pg. Plan Reveiw Response, 2 copies of the following pages: A2.1, A2.2, A2.3; taken to Ron Hill
1st review completed  12/21/2006 FAIL
Routing - FIRE12/18/2006 12/21/2006 FAIL
Faxed review comments to plans. Attached review comments to plans.
Routing - PLAN CHECK11/16/2006 12/18/2006 FAIL
faxed and mailed requirements to the architect, routed plans to fire for review, 12/18/06
Plan resubmittals received  12/13/2006  
received letter of transmittal, 1pg. letter of response, and 2 copies of the following pages: S0.2, S1.1, S2.1; taken to Ron Hill
Routing - PLUMBING11/14/2006 11/16/2006 PASS
per plans and 2003 upc
Routing - Erosion and Sediment11/9/2006 11/14/2006 PASS
ESC plan approved with attached conditions.
Routing - PLANNING11/8/2006 11/8/2006 PASS
Cody Riddle (greenbelt setback verification)-No work proposed, or allowed within the greenbelt setback. CER
Approved per DRH06-00334 11-8-06 Andrea Tuning
Routing - PUBLIC WORKS11/6/2006 11/8/2006 PASS
Pending Assignment by MYS11/3/2006 11/6/2006 DONE
11/6/2006 14:18:43 B_S - activity updated through activity BLDA175 from case BLD06-03180.
Routing Off Site - STRUCTURAL11/6/2006 11/6/2006 PASS
Called Action Courier for pick up @ 1:15pm on 11/6/06 BAS
Plans ACCEPTED BY PLAN TECH  11/6/2006  
Recd Pcfee & Taken To Pln CK  11/6/2006 DONE
Application received  11/3/2006