Third Notice BLD | 10/30/2007 | 10/30/2007 | 12/27/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
(F) Reprint permit | | | 11/26/2007 | | DONE |
|
|
|
|
Second Notice BLD | 10/17/2007 | 10/17/2007 | 10/30/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 9/27/2007 | 10/17/2007 | | DONE |
|
|
|
|
FIRE-Final Inspection | 9/27/2007 | 9/27/2007 | 9/27/2007 | | CANC |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 9/27/2007 | 9/27/2007 | 9/27/2007 | P | PASS |
Mike Jordan
|
|
|
Was looked at yesterday Phone #: ###-#### Internet Inspection Request from: Duane Seid. ok for perm occ.
|
Permanent Occupancy | | | 9/27/2007 | | DONE |
|
|
|
|
BLD-Final | 9/4/2007 | 9/4/2007 | 9/4/2007 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-#### Internet Inspection Request from: Duane Seid
|
BLD-Final | 7/26/2007 | 7/26/2007 | 7/26/2007 | P | PART |
Jim Storey
|
|
|
Phone #: ###-#### Internet Inspection Request from: Duane Seidtemp ok
|
FIRE-Final Inspection | 7/26/2007 | 7/26/2007 | 7/26/2007 | P | PART |
Troy Cobbley
|
|
|
A temporay occupancy was given until the east elevator has been inspected and approved. Until then the east elevator is to remain locked out and is not to be used. The west elevator is approved for use. Also one additional emergency light is required in the exit lobby of the first floor south exit. Temporary signage in the stair towers has been provided until the permanant signs have been made. The non approved hardware on the second floor pocket door has been removed. The three fire hydrants have been tested for flow.
|
BLD-Other | 6/28/2007 | 6/28/2007 | 6/28/2007 | P | PASS |
Mike Jordan
|
|
|
dwayne - grid ceiling; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. grid ok.
|
BLD-Wall cover | 6/25/2007 | 6/25/2007 | 6/25/2007 | P | PART |
Jim Sly
|
|
|
Instpect ceiling grid and above ceiling rough-ins. Phone #: ###-#### Internet Inspection Request from: Duane Seid Select grid ceilings....2nd floor....OK. Entry...hard lid frame...OK
|
BLD-Wall cover | 5/30/2007 | 5/30/2007 | 5/30/2007 | A | PASS |
Mike Jordan
|
|
|
I am ready for cover in the remainder of the TI on the second floor. Phone #: ###-#### Internet Inspection Request from: Duane Seid. grid in ada restroom.
|
BLD-Energy code compliance | 5/21/2007 | 5/21/2007 | 5/21/2007 | P | PASS |
Mike Jordan
|
|
|
Perimeter walls are insulated and ready for inspection Phone #: ###-#### Internet Inspection Request from: Duane Seid. Should be shell and core energy.
|
BLD-Framing/Rough-in | 5/11/2007 | 5/11/2007 | 5/11/2007 | P | PASS |
Mike Jordan
|
|
|
I am ready for inspection for cover on the second floor tennant space. Phone #: ###-#### Internet Inspection Request from: Duane Seid Interior framing 2nd floor. pending plumbing.
|
BLD-Aging Inspection | 4/25/2007 | 4/25/2007 | 4/25/2007 | | PASS |
Mike Jordan
|
|
|
wip on shell and core.
|
Issue PAID IN FULL permit | | | 1/24/2007 | | |
|
|
|
|
Print Occupancy Form | | | 1/17/2007 | | DONE |
|
|
|
|
Telephone call | | | 1/17/2007 | | DONE |
|
|
|
tlk to bryce Jones ###-#### that permit and fees are ready to be picked up
|
Permit Ready to Issue | | | 1/17/2007 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 11/9/2006 | | 1/16/2007 | | PASS |
|
|
|
1/16/2007 11:36:20 JCM - activity updated through activity BLDA022 from case BLD06-03212.
|
Routing - FIRE | 1/11/2007 | | 1/16/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Routing - PLAN CHECK | 1/16/2007 | | 1/16/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/16/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 11/27/2006 | | 1/11/2007 | | PASS |
|
|
|
|
Plan Reviewer's activity | | | 1/11/2007 | | PASS |
|
|
|
Review and approved resubmitted construction documents. JCM
|
Plan resubmittals received | | | 1/9/2007 | | |
|
|
|
received transmittal from mhtn arch totaling (34) pages. also "2" sets of plans including each sheet of EL102, AC102, AE001, AE102, & AE409/ plans taken to john menard
|
1st review completed | | | 11/27/2006 | | FAIL |
|
|
|
Failed plan check and fire.
|
Routing - FIRE | 11/22/2006 | | 11/27/2006 | | FAIL |
|
|
|
Faxed resubmittal item to architect. Attached review comments to plans.
|
Plan resubmittals requested | | | 11/22/2006 | | DONE |
|
|
|
E-mailed the architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 11/16/2006 | | 11/21/2006 | | FAIL |
|
|
|
|
Routing - PLUMBING | 11/13/2006 | | 11/16/2006 | | PASS |
|
|
|
additional cross connection protection may be required at the lab sinks.
|
Routing - PLANNING | 11/9/2006 | | 11/16/2006 | | PASS |
|
|
|
Susan Riggs for Carl Miller CUP05-00093 Pending DR approval
plans for 2nd story tennant improvement
Sarah Schafer DRH05-00287 - Approved per the DR.
|
Routing - PUBLIC WORKS | 11/9/2006 | | 11/9/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/9/2006 | | |
|
|
|
|
Application received | | | 11/7/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/7/2006 | | DONE |
|
|
|
|
Routing - PLANNING | 1/16/2007 | | 1/17/2006 | | PASS |
|
|
|
Routed to Sarah S. to verify if approved. JCM
Approved per DRH05-00287.
|