Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-03222
StatusFinaled
Name FALASH & ROSS CONSTRUCTION
Site Address 1010 W JEFFERSON ST Unit: 104
Project Name1010 JEFFERSON LLC BLDG
Customer Number 
ePlanReviewNo
Description
(RCE-2502 FALASH & ROSS CONSTRUCTION) (ARKOOSH LAW OFFICES - 1ST STORY - STE 104) Only the basement of this building is fire sprinklered. To construct a 1,991 square foot office tenant space on the 1st story of an existing 25,745 square foot, 2 story with basement building. This building was renovated under permit BLD06-00879. Work is to include interior nonbearing walls, 20 minute doors in a corridor wall, interior nonrated doors, millwork, suspended ceilings, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Third Notice BLD2/22/20072/22/20073/16/2007 DONE
Second Notice has not been responded to.
Second Notice BLD2/7/20072/7/20072/22/2007 DONE
First Notice has not been responded to.
First Notice 1/26/20072/7/2007 DONE
Plan Reviewer's activity  1/29/2007 PASS
Approved revised drawings with "red lines".
Telephone call  1/29/2007 DONE
Left message for Sam to pick up approved resubmitals per Carl W no fees charged
BLD-Final1/25/20071/26/20071/26/2007APASS
DetailsDave Hannah
Call First Thanks Phone #: ###-#### ok for perm occ
Permanent Occupancy 1/26/20071/26/2007 DONE
Details
Permanent occupancy  1/26/2007 DONE
Perm. Occ. Cert. # 11414 issued 1-26-07 to the Arkoosh Law Offices.
FIRE-Final Inspection1/25/20071/25/20071/25/2007APASS
DetailsForrest France
Fire life safety passed final inspection.
BLD-Final1/24/20071/25/20071/25/2007ANR
DetailsDave Hannah
Please contact Greg Bolton prior to going out. Thanks Phone #: ###-#### needs fire sign offs
BLD-Other1/24/20071/25/20071/25/2007ACANC
DetailsDave Hannah
This is for a Fire/Life/Safety Final. Please contact Greg Bolton at ###-#### prior to going out. Thanks Phone #: ###-####
FIRE-Final Inspection1/25/20071/25/20071/25/2007ACANC
DetailsDave Hannah
This is for a Fire/Life/Safety Final. Please contact Greg Bolton at ###-#### prior to going out. Thanks Phone #: ###-####
Plan resubmittals received  1/24/2007  
rec'd 1 transmittal cover - 3 copies of sheet #s A2.0 - taken to Carl Westfall
BLD-Other1/18/20071/18/20071/19/2007PPASS
DetailsDave Hannah
This is for a ceiling inspection. Please contact Greg Bolton @ ###-####. Thanks Phone #: ###-####
BLD-Framing/Rough-in12/26/200612/27/200612/27/2006APART
DetailsDave Hannah
Please contact Greg Bolton @ ###-#### prior to going out. Thanks; Phone #: ###-#### Internet Inspection Request from: Jennifer Jenson ok to cover walls but need plans resubmitted becouse of wall relocations
Issue PAID IN FULL permit  12/22/2006 DONE
Telephone call  12/21/2006 DONE
lft vm with sam ###-#### that permit and fees are ready to picked up
Permit Ready to Issue  12/21/2006  
Print Occupancy Form  12/20/2006 DONE
Routing - PLAN CHECK12/15/2006 12/19/2006 PASS
Drawings approved after resubmittal review.
PLANS/APPL TAKEN TO FRONT DESK  12/19/2006 DONE
Plan assigned to (CJW)11/17/2006 12/19/2006 PASS
12/19/2006 11:45:56 CJW - activity updated through activity BLDA022 from case BLD06-03222.
Routing - FIRE12/12/2006 12/15/2006 PASS
Attached review comments to plans.
1st review completed  12/15/2006 FAIL
Failed plan check.
Plan resubmittals received  12/13/2006  
Recieved 1 cover transmittal and 3 copies of sheets A2.0 & A2.1 and taken to Carl Westfall
Routing - PLAN CHECK11/17/2006 12/12/2006 FAIL
The IBC plan review was started on December 11, 2006 and was finished the next day. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS11/17/2006 11/17/2006 PASS
Pending Assignment by MYS11/9/2006 11/17/2006 DONE
11/17/2006 08:58:10 MYS - activity updated through activity BLDA172 from case BLD06-03222.
Plans ACCEPTED BY PLAN TECH  11/13/2006  
Application received  11/9/2006  
Recd Pcfee & Taken To Pln CK  11/9/2006  
Telephone call     
DetailsVictoria A Beall
Call to Bob Ross - Ross stated he figured the intire job (demo, shell & core, and building) on final cert. He will redue his figures for BLD06-0322 only and refax final cert of value.