BLD-Final | 12/14/2007 | 12/14/2007 | 12/14/2007 | P | PASS |
Mike Jordan
|
|
|
chris Phone #: ###-####
|
DOC - Permit Finaled | 12/14/2007 | 12/14/2007 | 12/14/2007 | P | PASS |
Mike Jordan
|
|
|
|
Code Occupancy Approval | 11/16/2007 | 11/16/2007 | 11/16/2007 | P | PASS |
Dena Gambrel
|
|
|
|
BLD-Framing/Rough-in | 9/25/2007 | 9/25/2007 | 9/25/2007 | P | PASS |
Tom Arcoraci
|
|
|
Please call Chris prior to inspection Phone #: ###-####
|
Plan Reviewer's activity | | | 9/20/2007 | | DONE |
|
|
|
OK to cover per passing framing Inspection. No Final permit until ROS is recorded & copy brought to me in Plan Review. (SRZ)
|
BLD-Conference | 5/3/2007 | 5/4/2007 | 5/4/2007 | A | PASS |
Tom Arcoraci
|
|
|
chris; Phone #: ###-#### Internet Inspection Request from: Victoria Beall needs one hour walls no openings
|
Telephone call | | | 5/2/2007 | | DONE |
|
|
|
I recieved a telephone call from a Greg Sabala. I let him know this structure did not meet the Building Code as far as Location on Lot (2003 IRC section R302) when he asked. I just happen to be on site with the Field inspector the day before. (SRZ)
|
BLD-Energy code compliance | 4/30/2007 | 5/1/2007 | 5/1/2007 | A | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/30/2007 at 5:17:44 PM. Contact: ###-####.
|
BLD-Energy code compliance | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | CANC |
Tom Arcoraci
|
|
|
Chris ; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
BLD-Framing/Rough-in | 4/26/2007 | 4/26/2007 | 4/26/2007 | A | FAIL |
Tom Arcoraci
|
|
|
Chris ; Phone #: ###-#### Internet Inspection Request from: Victoria Beall cn posted
|
BLD-Footing | 2/20/2007 | 2/20/2007 | 2/20/2007 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/20/2007 at 7:35:02 AM. Contact: ###-####.
|
Issue PAID IN FULL permit | | | 2/9/2007 | | |
|
|
|
|
Routing - PLAN CHECK | 1/16/2007 | | 1/31/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/31/2007 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 1/31/2007 | | DONE |
|
|
|
|
CHANGE STATUS TO (RDY) | | | 1/31/2007 | | DONE |
|
|
|
|
Telephone call | | | 1/31/2007 | | DONE |
|
|
|
tlk to chris ###-#### that permit and fees are ready to be picked up
|
Plan assigned to (SRZ) | 11/13/2006 | | 1/31/2007 | | DONE |
|
|
|
Plans do not meet Building code for Location on lot. (SRZ)
|
Routing - PLAN CHECK | 1/4/2007 | | 1/12/2007 | | FAIL |
|
|
|
Re-submittals recieved. Plans Failed again. Applicant is picking up and correcting. (SRZ)
|
Telephone call | | | 1/12/2007 | | DONE |
|
|
|
I spoke with applicant and he is going to pick up the plans and get his designer to correct the red-lines and bring back. (SRZ)
|
Plan resubmittals received | | | 1/11/2007 | | |
|
|
|
Taken to Sam Z
|
Telephone call | | | 1/5/2007 | | DONE |
|
|
|
Spoke with Applicant and let him know about failed plans.
|
Routing - PLAN CHECK | 12/15/2006 | | 1/4/2007 | | FAIL |
|
|
|
PERMITS SHOULD NOT BE ISSUED UNTIL NON-BUILD AGREEMENT IS RESOLVED. SEE SUBDIVISION DEPT.
Plans do not meet Building code for Location on lot. (SRZ)
|
Routing - PUBLIC WORKS | 12/14/2006 | | 12/14/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 12/14/2006 | | 12/14/2006 | | PASS |
|
|
|
|
Routing - PLANNING | 11/24/2006 | | 11/27/2006 | | FAIL |
|
|
|
Routed to Cody CUP05-00088 11/27
Routed to Cody CUP05-00088 11/27
Applicant has not submitted revised site, landscape, floor, and elevation plans to confirm compliance with CUP.
|
Routing - Addressing | 11/24/2006 | | 11/24/2006 | | PASS |
|
|
|
|
Application received | | | 11/13/2006 | | |
|
|
|
|