Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-03260
StatusFinaled
Name LEVCO
Site Address 1454 E SHENANDOAH DR
Project Name 
Customer Number 
ePlanReviewNo
Description
4/11/07 OK TO ELIMINATE REBAR IN THE SLAB 4/11/07 PEP 2.28.2007 THIS PROJECT IS MODIFIED THIS DAY TO REFLECT THE ADDED CONSTRUCTION TO BETTER UTILIZE EXISTING CRAWL SPACE AND ADJACENT BASEMENT AREA. THERE WILL BE A NEW INTERIOR RETAINING WALL. THERE IS TO BE SELECT BEARING AND NON BEARING PARTITION WORK TO CREATE A BATHROOM AND LARGE OPEN AREA. SEPARATE ELECTRICAL, PLUMBING, MECHANICAL AND ESC PERMITS ARE REQUIRED. ADDED VALUE TO THIS PERMIT IS $80,000 WITH APPROVED ESC PLAN. 2/28/2007} (Levco RCE-2554) This project is for an interior remodel of the master bath area selact window work, relocating the shower area and watercloset. Separate electrical, plumbing and mechanical permits are required.R-1B ok per Colleen Carroll. All per the approved plans as marked and plan review notes. A letter from the applicant's geotechnical engineer indicating that the footing sub-grade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Terry Records at 384-3946 pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/27/20078/28/20078/28/2007APASS
DetailsDave Hannah
Joe; call 45 min. prior; Phone #: ###-#### Internet Inspection Request from: Hattie James
DOC - Permit Finaled8/28/20078/28/20078/28/2007PPASS
DetailsDave Hannah
BLD-Energy code compliance4/26/20074/27/20074/27/2007PPASS
DetailsDave Hannah
joe call 30 min before; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Framing/Rough-in4/26/20074/27/20074/27/2007PPASS
DetailsDave Hannah
joe call 30 min before; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
Case Summary (BLD)  4/11/2007  
BLD-Other4/9/20074/9/20074/9/2007PPASS
DetailsDave Hannah
Joe Rebar in a retaining wall as early as possible; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
BLD-Footing3/29/20073/30/20073/30/2007APASS
DetailsDave Hannah
joe - pls cal 30 min prior ; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to pour ftg
BLD-Footing3/28/20073/29/20073/29/2007ANR
DetailsMike Jordan
Jim; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. No entry from Terry Records for Geo-tech report. Contacted contractor to inform him that no insp could be done, do not place conc, and to submit report before scheduling insp.
PubWorks Subgrade Approval3/29/20073/29/20073/29/2007 DONE
footing subgrade approved by the geotechnical engineer
Routing Walk-In (BLD)2/28/20072/28/20072/28/2007PDONE
2/28/2007 15:09:23 PEP - activity updated through activity BLDA022 from case BLD06-03260.
Case Summary (BLD)  2/28/2007  
Inspection Record Card- Bld  2/28/2007  
PLANS/APPL TAKEN TO FRONT DESK  2/28/2007 DONE
CHANGE STATUS TO (REV)  2/28/2007 DONE
modification of existing permit ///dld
BLD-Wall cover12/6/200612/7/200612/7/2006APART
DetailsDave Hannah
joe Note: please call prior meet with; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles bathroom ok to cover
Routing Walk-In (Zoning)11/15/200611/15/200611/15/2006PPASS
Routing Walk-In (BLD)11/15/200611/15/200611/15/2006PDONE
11/15/2006 14:26:26 PEP - activity updated through activity BLDA022 from case BLD06-03260.
Case Summary (BLD)  11/15/2006  
Inspection Record Card- Bld  11/15/2006  
PLANS/APPL TAKEN TO FRONT DESK  11/15/2006 DONE
Issue PAID IN FULL permit  11/15/2006 DONE
Application received  11/15/2006  
CHANGE ISSUED DATE  11/15/2006 DONE