BLD-Final | 4/24/2007 | 4/25/2007 | 4/25/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 4/24/2007 at 9:56:44 AM. Contact: ###-####.
|
DOC - Permit Finaled | 4/25/2007 | 4/25/2007 | 4/25/2007 | P | PASS |
Mike Jordan
|
|
|
Lot has been fine graded, handrail installed.
|
BLD-Final | 4/20/2007 | 4/20/2007 | 4/20/2007 | P | FAIL |
Dave Hannah
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Barbara Stitt grade lot install handrail stairs to basement
|
BLD-Energy code compliance | 2/20/2007 | 2/21/2007 | 2/21/2007 | A | PASS |
Mike Jordan
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok toi cover.
|
BLD-Energy code compliance | 2/16/2007 | 2/20/2007 | 2/20/2007 | A | FAIL |
Mike Jordan
|
|
|
Ben; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt. Provide insulating foam at plumbing penetrations at tub and showers at main level floors. Provide insul at floor joist at cellar. Fireblock from cellar to crawl space transition.
|
BLD-Framing/Rough-in | 2/15/2007 | 2/16/2007 | 2/16/2007 | A | PASS |
Mike Jordan
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. All framing issues have been resolved. wip on insul.
|
BLD-Framing/Rough-in | 2/12/2007 | 2/13/2007 | 2/13/2007 | P | FAIL |
Mike Jordan
|
|
|
ben; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Provide header over doorway upstairs @ k1 truss. Provide approved repair for k3A truss were holes were drillled for plumbing. Winder treads for stairway to cellar are non conforming. Needs to have 6 inch min at any point and not vary more than 3/8 inch at 12 inch alk line. c/n posted. ok to insul.
|
BLD-Foundation | 1/8/2007 | 1/8/2007 | 1/8/2007 | P | PASS |
Mike Jordan
|
|
|
BRIAN nOTE: WALL FOUNDATION; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
BLD-Footing | 1/4/2007 | 1/5/2007 | 1/5/2007 | A | PART |
Mike Jordan
|
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Noted bottom of footing is frozen at about 1 inch down. Contractor to thaw or wait till weather warms up.
|
BLD-Foundation | 12/28/2006 | 12/29/2006 | 12/29/2006 | P | PASS |
Mike Jordan
|
|
|
bryan - wall; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Basement wall. Also spoke to contractor regarding backfill around basement wall. Will need to provide compaction testing or backfill with drain rock.
|
BLD-Footing | 12/21/2006 | 12/21/2006 | 12/21/2006 | P | PART |
Mike Jordan
|
|
|
brian ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Footing for basement wall.
|
Issue PAID IN FULL permit | | | 12/21/2006 | | |
|
|
|
|
Telephone call | | | 12/18/2006 | | DONE |
|
|
|
t/c w ben blazer at Interwest Homes - ###-#### - permit ready and fees given
|
Plan assigned to (PEP) | 11/30/2006 | | 12/11/2006 | | PASS |
|
|
|
12/11/2006 11:21:06 PEP - activity updated through activity BLDA022 from case BLD06-03276.
|
Routing - PLAN CHECK | 11/20/2006 | | 12/11/2006 | | PASS |
|
|
|
|
Case Summary (BLD) | | | 12/11/2006 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 12/11/2006 | | DONE |
|
|
|
|
Inspection Record Card- Bld | | | 12/11/2006 | | DONE |
|
|
|
|
Telephone call | | | 12/11/2006 | | DONE |
|
|
|
t/c w emory at Interwest Homes - ###-#### - permit ready and fees given ($8,901.64)
|
Permit Ready to Issue | | | 12/11/2006 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 11/30/2006 | | FAIL |
|
|
|
egress needed from basement; lateral support for window wall; call out reinfircing roe basement walls.returned 1-set of plans to designer 11/30/2006 11:50 a.m.
|
Routing - PLANNING | 11/17/2006 | | 11/20/2006 | | PASS |
|
|
|
Construction plans missing page 4 of 9. Called Ben 11/17. Brought in missing page on 11/20.
|
Routing - PUBLIC WORKS | 11/20/2006 | | 11/20/2006 | | PASS |
|
|
|
|
Application received | | | 11/17/2006 | | |
|
|
|
|
Routing - Addressing | 11/17/2006 | | 11/17/2006 | | PASS |
|
|
|
|