Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD06-03299
StatusFinaled
Name SOMERSET BUILDERS
Site Address 812 E OPUS ST
Project Name 
Customer Number 
ePlanReviewNo
Description
"RCE-5778 Somerset Builders" To build a new 3883s.f. 2-story single family dwelling with 3117s.f. on the main level and 916s.f. on the upper level that includes 150s.f. of storage area off of the upper level bedroom. R-2D ok per Sue Hansen with common driveway approved by Scott Spjute Planning Director. All per the approved plans as marked REScheck and plan review notes. PC# 067 pep
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/7/20081/7/20081/7/2008PPASS
DetailsDave Hannah
Bob Phone #: ###-####
DOC - Permit Finaled1/7/20081/7/20081/7/2008PPASS
DetailsDave Hannah
BLD-Final12/21/200712/24/200712/24/2007ANR
DetailsTom Arcoraci
bob Phone #: ###-####
BLD-Energy code compliance7/6/20077/9/20077/9/2007APASS
DetailsJim Storey
bob; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang
BLD-Framing/Rough-in7/3/20077/5/20077/5/2007APASS
DetailsJim Storey
BOB Phone #: ###-####c/nmade ok
BLD-Framing/Rough-in6/29/20077/3/20077/3/2007AFAIL
DetailsMike Jordan
bob; Phone #: ###-#### Internet Inspection Request from: Victoria Apatang. Provide min 3 nails for attachment of jack trusses. Fireblock fireplace flue at ceiling level. Draft stop open floor trusses so as not to exceed 1000sqft. G1 and G2 trusses require scab brace as noted on truss engineering. Provide additional studs under bearing points on F1 and F3 floor trusses. More nails on G2 top chord. Justify deletion of 2x6 bearing condition as noted on truss engineering? ok to insul. c/n posted.
BLD-Foundation3/8/20073/9/20073/9/2007APASS
DetailsJim Storey
dave; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
BLD-Footing3/6/20073/7/20073/7/2007APASS
DetailsJim Storey
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
Issue PAID IN FULL permit  2/15/2007 DONE
Telephone call  12/27/2006 DONE
t/c w bob at somerset builders ###-#### - permit ready and fees given
Permit Ready to Issue  12/27/2006 DONE
Routing - PLAN CHECK11/22/2006 12/26/2006 PASS
Plan assigned to (PEP)12/8/2006 12/26/2006 PASS
12/26/2006 08:24:21 PEP - activity updated through activity BLDA022 from case BLD06-03299.
PLANS/APPL TAKEN TO FRONT DESK  12/26/2006 DONE
Inspection Record Card- Bld  12/26/2006 DONE
Case Summary (BLD)  12/11/2006  
Plan Reviewer's activity  12/8/2006 DONE
left message that truss design is required ###-#### Robert Head
Routing - PLANNING11/20/2006 11/22/2006 PASS
Scott will do site check for the common driveway. Scott said O.K.
Routing - PUBLIC WORKS11/22/2006 11/22/2006 PASS
Application received  11/20/2006  
Routing - Addressing11/20/2006 11/20/2006 PASS