Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD06-03318
StatusFinaled
Name ROYAL PLAZA MASTER CONDO OA INC
Site Address 1112 W MAIN ST Unit: 304
Project NameROYAL PLAZA
Customer Number 
ePlanReviewNo
Description
(ROYAL PLAZA - ANDREA CONDOS - SUITE 304) This building is fire sprinklered for high-rise. To create a 1,330 square foot residential condominium unit on the 3rd story of a high-rise building. Work is to include 1-hr fire-resistance-rated dwelling unit separation walls, interior nonbearing walls, suspended gypsum board ceilings, millwork, and finishes. The 1-hr fire-resistance-rated corridor was constructed under permit BLD06-03304. Work is required to comply with the approved drawings, with the plan review report, and with all applicable codes. The fire sprinkler system is required to comply with NFPA 13 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy  6/1/2018 DONE
BLD-Final5/31/20185/31/20185/31/2018PPASS
DetailsBob Archibald
Chrisitna Phone #: ###-####. Affidavit of agreement, # 2###-####10, filed with Ada County. Ok to final.
BLD-Aging Inspection4/23/20184/23/20184/23/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection2/19/20182/19/20182/20/2018 PEND
DetailsDave Hannah
BLD-Aging Inspection12/18/201712/18/201712/18/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection10/16/201710/16/201710/16/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection8/14/20178/14/20178/14/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection6/12/20176/12/20176/12/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection4/10/20174/10/20174/10/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection2/6/20172/6/20172/6/2017 PEND
DetailsDave Hannah
BLD-Aging Inspection12/5/201612/5/201612/6/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection10/3/201610/3/201610/3/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection8/1/20168/1/20168/2/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection5/30/20165/30/20165/31/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection3/28/20163/28/20163/28/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection1/25/20161/25/20161/25/2016 PEND
DetailsDave Hannah
BLD-Aging Inspection11/23/201511/23/201511/23/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection9/21/20159/21/20159/21/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection7/20/20157/20/20157/20/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection5/18/20155/18/20155/19/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection3/16/20153/16/20153/16/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection1/12/20151/12/20151/12/2015 PEND
DetailsDave Hannah
BLD-Aging Inspection11/10/201411/10/201411/12/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection9/8/20149/8/20149/8/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection7/7/20147/7/20147/7/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection5/5/20145/5/20145/5/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection3/3/20143/3/20143/3/2014 PEND
DetailsDave Hannah
BLD-Aging Inspection12/30/201312/30/201312/30/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection10/28/201310/28/201310/28/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection8/26/20138/26/20138/26/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection6/24/20136/24/20136/24/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection4/22/20134/22/20134/22/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection2/18/20132/18/20132/19/2013 PEND
DetailsDave Hannah
BLD-Aging Inspection12/17/201212/17/201212/17/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection10/15/201210/15/201210/16/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection8/13/20128/13/20128/13/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection6/11/20126/11/20126/13/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection4/9/20124/9/20124/9/2012 PEND
DetailsDave Hannah
BLD-Aging Inspection2/6/20122/6/20122/9/2012 DEFR
DetailsDave Hannah
see history temp occ ok for perm occ after shell and core is finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Aging Inspection12/5/201112/5/201112/5/2011 DEFR
DetailsDave Hannah
see history temp occ ok for perm occ after shell and core is finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Aging Inspection10/4/201110/4/201110/5/2011 DEFR
DetailsDave Hannah
see history temp occ ok for perm occ after shell and core is finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Aging Inspection8/2/20118/2/20118/3/2011 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection5/31/20115/31/20116/1/2011 PEND
DetailsDave Hannah
temp occ ok for perm occ after shell and core is finaled this is all been aproved by Bruce D Chatterton and Legal and an Agreement with Bob Hosac
BLD-Aging Inspection3/28/20113/28/20113/28/2011 DEFR
DetailsDave Hannah
BLD-Aging Inspection1/24/20111/24/20111/24/2011 DEFR
DetailsDave Hannah
BLD-Aging Inspection11/22/201011/22/201011/22/2010 DEFR
DetailsDave Hannah
BLD-Aging Inspection9/20/20109/20/20109/21/2010 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection7/19/20107/19/20107/19/2010 DEFR
DetailsDave Hannah
see history
BLD-Aging Inspection4/26/20104/26/20104/26/2010 PASS
DetailsDave Hannah
ok for temp occ. ok for perm occ after shell and core is finaled.This is per Bruce D Chatterton and Boise city legal dept per an agreement signed by Bob Hosac on 12/5/07
Temporary Occupancy12/21/20073/20/200812/21/2007 DONE
BLD-Final12/18/200712/19/200712/19/2007APART
DetailsDave Hannah
todd Phone #: ###-#### ok for temp occ. ok for perm occ after shell and core is finaled.This is per Bruce D Chatterton and Boise city legal dept per an agreement signed by Bob Hosac on 12/5/07
FIRE-Final Inspection12/18/200712/18/200712/18/2007PPART
DetailsForrest France
Life safety inspection passed, final pending shell and core permit final.
BLD-Framing/Rough-in8/1/20078/2/20078/3/2007APASS
DetailsDave Hannah
jerry Phone #: ###-####
BLD-Framing/Rough-in7/20/20077/20/20077/20/2007APASS
DetailsDave Hannah
ok to cover
BLD-Framing/Rough-in7/13/20077/16/20077/16/2007APART
DetailsDave Hannah
darey Phone #: ###-#### darey has c/n
BLD-Wall cover6/28/20076/29/20076/29/2007ACANC
DetailsTom Arcoraci
###-#### Jerry Drywall for ceilings & walls please
(F) Reprint permit  5/9/2007  
Issue PAID IN FULL permit  3/30/2007 DONE
Telephone call  2/23/2007 DONE
faxed permit #s and amounts due to randy jordan at ###-####
Permit Ready to Issue  2/23/2007  
Routing - PLAN CHECK2/21/2007 2/22/2007 DONE
PLANS/APPL TAKEN TO FRONT DESK  2/22/2007 DONE
Print Occupancy Form  2/22/2007 DONE
Plan assigned to (CJW)11/27/2006 2/22/2007 PASS
2/22/2007 13:17:05 CJW - activity updated through activity BLDA022 from case BLD06-03318.
Routing - FIRE2/15/2007 2/21/2007 PASS
Attached updated review comments to plans.
Routing - PLAN CHECK12/21/2006 2/15/2007 PASS
Completed the resubmittal review. Drawings approved.
Plan resubmittals received  2/8/2007  
rec'd response letter from, response letter from DC Engineering - 2 copies of sheet #s A2.2, A2.1, E0.1, E0.2, and E1.0 - taken to Carl Westfall
Plan resubmittals received  1/25/2007  
rec'd response letter from Habitec, response letter from DC Engineering - fire code review - plan review report - 2 copies of sheet #s A2.1, A3.1, M0.2, M1.1, E0.1, E0.2, E1.0, P1.3 - taken to Carl Westfall
Routing - FIRE12/18/2006 12/21/2006 FAIL
Faxed resubmittal requirement to architect. Attached review comments to plans.
1st review completed  12/21/2006 FAIL
Routing - PLAN CHECK11/28/2006 12/18/2006 FAIL
The IBC plan review was started and finished on December 18, 2006. Revised drawings were required. See the plan review report.
Routing - PUBLIC WORKS11/27/2006 11/28/2006 PASS
Pending Assignment by MYS11/24/2006 11/27/2006 DONE
11/27/2006 10:51:03 MYS - activity updated through activity BLDA172 from case BLD06-03318.
Plans ACCEPTED BY PLAN TECH  11/22/2006  
Recd Pcfee & Taken To Pln CK  11/22/2006  
Application received  11/21/2006