Micron Building #02 - F1A (C9894) - Photo Bay 10 Remodel - To demo and remove interior partitions and doors to eliminate Smock Room #102B, Bootie #102A YA Sem Lab #105B and YA Prep Lab #105A. To sawcut and remove existing concrete floor, excavate and install 3'-6" reinforced concrete retaining walls and new concrete slab floor for raised floor system. To install new clean room wall system, two new 4070 doors, raised floor system and hepa filter ceiling system to create a new 27'-6" x 86'-6" (2,380 sq. ft.) Photo Bay 10 room #103D. To demo and remove second floor structural framing and floor deck between grid lines #11 & #12 and #C.9 & #B. To install new steel structural frame with 3/4" fire retardant treated plywood over metal floor deck for new mechanical equipment. To install new access vestibule walls and door at the Make Up Air Unit area of the roof. --- PLAN MODIFICATION (5/30/07) This permit was modified to eliminate two control areas and change occupancy classification from F-1 to H-5. To install approximately 90 lineal feet of clean room wall and four additional egress doors to create a 900 sq. ft. Bay 10 #103E and a 1,900 sq. ft. Service Aisle #103F at original Bay 10 area. This modification is also to change existing door swings and hardware as required to comply with H-5 egress requirements at the first and second floors. All construction per the approved plans. JCM
Contact Information
See Activities list for contact information
Show Inspection Activities Only
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Second Notice BLD9/13/20079/13/200710/1/2007 DONE
First Notice has not been responded to.
First Notice8/14/20078/14/20079/13/2007 DONE
DetailsJim Storey
BLD-Final8/10/20078/14/20078/14/2007APASS
DetailsJim Storey
Bay 10 final Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
DOC - Permit Finaled8/14/20078/14/20078/14/2007PPASS
DetailsJim Storey
FIRE-Final Inspection8/10/20078/14/20078/14/2007APASS
DetailsForrest France
Fire life safety finaled.
FIRE-Final Inspection8/10/20078/13/20078/10/2007ACANC
Details
life safety final Phone #: ###-#### Internet Inspection Request from: Greg Kirkes Inspection cancelled from web by: Greg Kirkes
BLD-Final8/8/20078/9/20078/10/2007PCANC
DetailsJim Storey
Bay 10 final Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
FIRE-Final Inspection8/9/20078/9/20078/9/2007PNR
DetailsForrest France
Fire life safety inspection completed acceptable, final pending project related fire sprinkler permits FIR06-00959 and FIR07-00553.
BLD-Final8/3/20078/8/20078/8/2007PPART
DetailsJim Storey
C9894 final inspection. Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
FIRE-Final Inspection7/30/20078/2/20078/3/2007PNR
DetailsForrest France
Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
BLD-Final7/31/20078/3/20078/3/2007ACANC
DetailsJim Storey
final for building 2 bay 10. Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
BLD-Conference7/30/20077/31/20077/31/2007APART
DetailsJim Storey
Phone #: ###-#### Internet Inspection Request from: Greg Kirkes resolve hardware isue.
Issue & PRINT to be Invoiced  7/27/2007 DONE
Plan assigned to (JCM)5/29/20075/29/20077/26/2007 PASS
7/26/2007 17:35:22 SLR - activity updated through activity BLDA022 from case BLD06-03339.
Routing - FIRE7/26/2007 7/26/2007 PASS
New HazMat classification for MAQ's and Workstation Q's reviewed on site; not accurate, revised and a subsequent report was prepared during onsite visit, re-discussed and approved. A New Memorandum from B. Rice addressing other H5 requirements of IFC 18 was also provided and reviewed/discussed at site visit; revised the master Exiting sheet to show proper exiting paths; Plans approved subject to these documents and plan notations.
PLANS/APPL TAKEN TO FRONT DESK  7/26/2007 PASS
Okay to issue.
Routing - FIRE7/24/2007 7/25/2007 FAIL
Plans lack infomation necessary to confirm compliance with IFC 18. Disucssed with P. Marcolina and B. Smith on 7/25/07; set up appoint to meet with B. Smith onsite on 7/26.
Plan Reviewer's activity  7/24/2007 PASS
Reviewed and approved resubmitted construction documents for the requested plan modification.
Routing - PLAN CHECK7/18/2007 7/24/2007 PASS
Plan resubmittals received  7/23/2007  
Received plan review responce letter (3 PG), 1 copy of pages A3.1, EL2.1.1, A2.1.c.1, A2.1.c.2, A2.2.0.1, A2.2.c.1 and taken to John Menard
Second Notice BLD6/21/20076/21/20077/18/2007 DONE
First Notice has not been responded to.
Plan resubmittals received  7/18/2007  
received memorandum from micron tech & chemical quanity code analysis sheet-- paperwork taken to John Menard
Routing - FIRE7/12/2007 7/13/2007 FAIL
On-site review conducted 7/12 and plan set brought back into office for further review by fire, building and fire alarm. The resubmitted hazardous material analysis report indicates it is only for the 1900 sf Bay 10 area; it should include the entire H5 envelope as shown on G1.1.0 and G2.1.0, as previously requested.
Also, the haz mat analysis report should show the actual quantities and MAQ's by Material Classification and other relevant categories, as shown in Tables 1804.2.1 and 2703.1.1. Similarly, the Workstation haz mat analysis report should include actual quantities and the MAQ by categories as shown in Table IFC1805.2.1.
This permit is limited to Bay 10, however, the design is based on changing the two adjacent F1 "control areas" to H5 and including Bay 10 to create one new H5 envelope. Micron has created a new permit, BLD 07-00959 for the work to be done in these adjacent areas, and is limiting this permit to Bay 10 work only. The permit scopes need to be revised, and with the simultaneous change in occupancy for both permit areas, both permits will still need to be reviewed and evaluated at the same time. Plans routed to building for further review.
Routing - PLAN CHECK  7/12/2007  
SLR- The resubmitted FA plans were reviewed 7/12/07 on-site. See further comments under the FA permit FIR06-00934.
Routing - FIRE7/12/2007 7/12/2007 FAIL
On-site review of new sheets showing revised H5 boundary, but reqested Haz Mat Classification Summary report only addresses the Bay 10 area, which has also not been clearly defined. Micron intends to limit the scope of this permit to Bay 10, but they are simulataneously changing the occupancy of areas A,B and C (of which Bay 10 is only a portion). Exiting on the new G sheets is unclear and cannot be evaluated as shown. Need building review/approval of the enlarged 5 area prior to completing the fire review. Micron advised on site and by phone of deficiencies.
Plan resubmittals received  7/12/2007 DONE
1 copy sheets FA0, FA1.1, FA1.2,FA2.1.1,F12.2.1,FA2.3.1,FA4.1,FA5.1.
Plan resubmittals received  7/12/2007  
received 1 copy of all of the following-Cover transmittal, 1 Horn Panel-building 2 Calc sheet, Fire Alarm Circuit Calc sheet for AE01, AE02, AE09, AE17, AE18, FA0, FA1.1, FA1.2, FA2.1.1, FA2.2.1, FA2.3.1, FA4.1, FA5.1 and taken to John Menard
Plan resubmittals received  7/12/2007  
emailed received from P. Marcolina responding to SLR's email dated 6/8/07 with a Haz Mat analysis attached.
First Notice5/24/20075/24/20076/21/2007 DONE
DetailsJim Storey
BLD-Other6/18/20076/18/20076/18/2007PPASS
DetailsJim Storey
greg - ###-#### -firewall 2 hr paches east side of wall ok
Telephone call  6/15/2007 DONE
Telconference with Bobbie Smith; reviewed the information needed per my pervious email to Paul Marcolina. She will see that this information is resubmitted, along with the information requested by John Menard for the building review.
Routing - FIRE5/31/2007 6/8/2007 FAIL
Plan Modification Review. the following email was sent to Paul, to document the required additional information:
Paul,
To complete my review of these two permits, I will need the following information:
1. Because the previous F1 areas are being converted to H5, I need to see on the Building plans, the new boundaries of the H5 area.
2. I will need a Hazardous Material Summary/Classification/analysis of the entire H5 area, verifying that the total Haz Mat quantities located within the new H5 envelope are within allowable limits per IFC 1804; and a Haz Mat Classification/analysis verifying quantities at workstations within the proposed new H5 areas are within the allowable quantities per 1805.2.1.
3. The FA plans need to be revised to show the new boundaries of the entire H5 area and also show sufficient area surrounding the proposed new H5 spaces to confirm that:
A. manual pull stations are provided and spaced as required by 1803.11 and 907.4.1.
B. the emergency alarm system initiating devices and notification appliances are provided as required by 1803.12 and 908.2, including outside the H5 exits as required by 2704.9 and as applicable per 2705.4.4.
3. The title sheet FA0 should be revised to reflect the new occupancy and all appropriate alarm systems.
Thanks,
Sam
Plan Reviewer's activity  5/31/2007 FAIL
Reviewed and failed plans.
Plan resubmittals requested  5/31/2007 DONE
E-mailed the architect with a copy of the plan review requesting revisions. JCM
BLD-Conference5/22/20075/24/20075/24/2007ANR
DetailsJim Storey
Review drawings and H5 requirements for the area. Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
BLD-Footing5/18/20075/23/20075/24/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/18/2007 at 12:07:12 PM. Contact: ###-####.
DOC - Permit Finaled5/24/20075/24/20075/24/2007PPASS
DetailsJim Storey
CHANGE STATUS TO (ISS)  5/24/2007 DONE
change back to issue per jim storey 5-24-07ps
BLD-Footing5/18/20075/22/20075/22/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/18/2007 at 12:06:49 PM. Contact: ###-####.wip
BLD-Footing5/18/20075/21/20075/21/2007APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/18/2007 at 12:06:22 PM. Contact: ###-####. placed w/si
BLD-Footing5/14/20075/17/20075/17/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/14/2007 at 5:03:14 PM. Contact: ###-####.placed with si
BLD-Conference5/16/20075/17/20075/17/2007PPART
DetailsJim Storey
inspect sheetrock walls on the 2nd floor of building 2. Phone #: ###-#### Internet Inspection Request from: Greg Kirkes will review job tue/conf pass
BLD-Footing5/14/20075/16/20075/16/2007PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/14/2007 at 5:02:45 PM. Contact: ###-####.placed w si am ok
BLD-Footing5/14/20075/15/20075/15/2007PPEND
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/14/2007 at 5:02:23 PM. Contact: ###-####.
BLD-Footing5/9/20075/11/20075/11/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/9/2007 at 3:26:33 PM. Contact: ###-####.wip
BLD-Footing5/9/20075/10/20075/10/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/9/2007 at 3:25:49 PM. Contact: ###-####. conf.
BLD-Footing5/3/20075/4/20075/8/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/3/2007 at 11:29:46 AM. Contact: ###-####.wip
BLD-Framing/Rough-in5/3/20075/3/20075/3/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 5/3/2007 at 11:28:49 AM. Contact: ###-####.wip si
BLD-Framing/Rough-in4/30/20075/2/20075/2/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/30/2007 at 9:32:43 AM. Contact: ###-####.deck ok
BLD-Framing/Rough-in4/30/20075/1/20075/1/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/30/2007 at 9:32:14 AM. Contact: ###-####.deck pw wip
BLD-Footing4/23/20074/26/20074/26/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/23/2007 at 1:12:45 PM. Contact: ###-####.
BLD-Concrete4/25/20074/26/20074/26/2007APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/23/2007 at 1:12:17 PM. Contact: ###-####.
BLD-Footing4/23/20074/25/20074/25/2007PDEFR
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/23/2007 at 1:12:17 PM. Contact: ###-####.
BLD-Footing4/18/20074/23/20074/23/2007PPART
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/18/2007 at 3:36:13 PM. Contact: ###-####.rebar ok placed with si
BLD-Conference4/18/20074/20/20074/20/2007PPASS
DetailsJim Storey
inspect footings and walls Phone #: ###-#### Internet Inspection Request from: Greg Kirkes
BLD-Footing4/18/20074/19/20074/20/2007PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 4/18/2007 at 3:35:45 PM. Contact: ###-####.
BLD-Conference1/22/20071/29/20071/30/2007APART
DetailsJim Storey
Meet to look at temp ramp in building 2. Phone #: ###-#### review of demo.
Issue & PRINT to be Invoiced  12/27/2006 DONE
Routing - PLAN CHECK11/22/2006 12/22/2006 PASS
Reviewed and approved on site at Micron. JCM
PLANS/APPL TAKEN TO FRONT DESK  12/22/2006 DONE
Plan assigned to (JCM)11/22/2006 12/22/2006 PASS
12/22/2006 10:14:24 JCM - activity updated through activity BLDA022 from case BLD06-03339.
Routing - FIRE12/21/2006 12/21/2006 PASS
On site review of plans, including Micron's Haz Mat Classification and Summary.
1st review completed  12/21/2006 PASS
DetailsJohn Menard
Application received  11/22/2006 DONE
This permit was created on the web by Paul Marcolina
Plan Reviewer's activity  11/22/2006 PEND
Started plan review on site, not able to finish review today. Will finish on next visit to Micron.
Third Notice BLD10/1/200710/1/2007   
Second Notice has not been responded to.
Third Notice BLD7/18/20077/18/2007   
Second Notice has not been responded to.
Plan assigned from Web11/22/2006