Second Notice BLD | 9/13/2007 | 9/13/2007 | 10/1/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 8/13/2007 | 9/13/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | | 8/13/2007 | | DONE |
|
|
|
|
BLD-Final | 8/6/2007 | 8/7/2007 | 8/7/2007 | P | PASS |
Mike Jordan
|
|
|
dave Phone #: 941-274. Ok for perm occ.
|
FIRE-Final Inspection | 8/6/2007 | 8/7/2007 | 8/7/2007 | A | PASS |
Forrest France
|
|
|
Items on previous c/n notice verified for completion, life safety final passed.
|
FIRE-Final Inspection | 8/5/2007 | 8/6/2007 | 8/7/2007 | P | FAIL |
Troy Cobbley
|
|
|
The keyed locks on the north and south exit doors need to be removed.
|
FIRE-Final Inspection | 8/2/2007 | 8/3/2007 | 8/6/2007 | P | FAIL |
Troy Cobbley
|
|
|
The key locks need to be removed from the north and south exits
|
BLD-Final | 8/1/2007 | 8/2/2007 | 8/2/2007 | P | NR |
Mike Jordan
|
|
|
Dave phone : ###-#### . Fire failed. Needs public works.
|
FIRE-Final Inspection | 7/30/2007 | 8/2/2007 | 8/2/2007 | A | FAIL |
Troy Cobbley
|
|
|
Access controlled egress doors are in the process of being installed and will need to be tested when ready. I called jim schmeer about ASI installing this system possibley without permits.
|
BLD-Final | 7/26/2007 | 8/1/2007 | 8/1/2007 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 7/26/2007 at 5:51:30 PM. Contact: ###-####. Inspection cancelled from web by: Patricia Smith
|
FIRE-Final Inspection | 7/27/2007 | 7/30/2007 | 7/30/2007 | P | CANC |
Troy Cobbley
|
|
|
zack - fire life safety Phone #: ###-#### Inspection cancelled from web by: Victoria Apatang
|
FIRE-Final Inspection | 7/26/2007 | 7/27/2007 | 7/27/2007 | A | FAIL |
Troy Cobbley
|
|
|
The south and the east exit discharge lights did not work. The north and south exit doors need approved hardware and the deadbolts removed. Per the plans there are three hvac units that require duct smoke detectors. I did not see remote annunciators as required. These duct detectors, if even installed, will need to be tested.
|
Code Occupancy Approval | | | 7/27/2007 | | PASS |
|
|
|
|
BLD-Energy code compliance | 4/19/2007 | 4/20/2007 | 4/20/2007 | A | PASS |
Tony Young
|
|
|
Zach; Phone #: ###-#### Internet Inspection Request from: Stacie Backus
|
BLD-Framing/Rough-in | 4/16/2007 | 4/17/2007 | 4/17/2007 | P | PASS |
Mike Jordan
|
|
|
zack; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. Needs to seal holes in draft stops. ok to insul.
|
BLD-Other | 3/9/2007 | 3/12/2007 | 3/12/2007 | P | PASS |
Mike Jordan
|
|
|
Ben Sheer Nail; Phone #: ###-#### Internet Inspection Request from: Stacie Backus. exterior and roof shear nailing ok. Need approved plans for exit corridors.
|
BLD-Footing | 1/29/2007 | 1/29/2007 | 1/29/2007 | P | PASS |
Mike Jordan
|
|
|
STEVE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Footing | 1/25/2007 | 1/26/2007 | 1/26/2007 | A | PASS |
Jim Storey
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
(F) Reprint permit | | | 1/19/2007 | | |
|
|
|
|
Print Occupancy Form | | | 1/18/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/18/2007 | | DONE |
|
|
|
|
Plan Reviewer's activity | | | 1/17/2007 | | PASS |
|
|
|
Reviewed and approved resubmitted revised plans. JCM
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/17/2007 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 11/30/2006 | | 1/17/2007 | | PASS |
|
|
|
1/17/2007 14:25:38 JCM - activity updated through activity BLDA022 from case BLD06-03378.
|
Routing - PLAN CHECK | 12/22/2006 | | 1/17/2007 | | PASS |
|
|
|
|
Plan resubmittals received | | | 1/16/2007 | | |
|
|
|
Rec'd 1cover transmittal - 2 copies of site plans, foundation plans, floor plans, elevations, electric & HVAC - taken to John Menard
|
Routing - PLANNING | 1/8/2007 | | 1/8/2007 | | PASS |
|
|
|
Approved per DRH06-00203 and CUP04-00026 MOD #4
|
1st review completed | | | 12/22/2006 | | FAIL |
|
|
|
|
Routing - FIRE | 12/19/2006 | | 12/22/2006 | | PASS |
|
|
|
Attached review comments to plans. Plans have red lined annotatiions which are to be field verified.
|
Plan resubmittals requested | | | 12/19/2006 | | DONE |
|
|
|
E-mailed the architect and applicant a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 12/13/2006 | | 12/19/2006 | | FAIL |
|
|
|
John Menard
|
Routing Off Site - STRUCTURAL | 11/30/2006 | | 12/18/2006 | | PASS |
|
|
|
Called Action Courier for pick up @1:50 on 11/30/06 BAS Received a letter from the consulting structural engineer approving the plans and calculations as submitted. JCM
|
Routing - PLANNING | 12/12/2006 | | 12/13/2006 | | FAIL |
|
|
|
The applicant must provide Design Review staff with revised drawings that comply with the conditions of approval for DRH06-00203. The landscaping plan within the building permit application does not show compliance with condition 1a for landscaping within parking lot planters. Travis Burrows at Dave Evans Construction was contacted about these issues.
|
Routing - PUBLIC WORKS | 12/7/2006 | | 12/12/2006 | | PASS |
|
|
|
|
Routing - Erosion and Sediment | 12/12/2006 | | 12/12/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PLUMBING | 12/12/2006 | | 12/12/2006 | | PASS |
|
|
|
per plans and 2003 upc
|
Routing - PLANNING Land Div | 11/30/2006 | | 12/7/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 11/30/2006 | | |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 11/30/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/30/2006 | | DONE |
|
|
|
|
Application received | | | 11/28/2006 | | |
|
|
|
|