Third Notice BLD | 12/11/2007 | 12/11/2007 | 1/15/2008 | | DONE |
Cathy Brown
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 11/13/2007 | 11/13/2007 | 12/11/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | | 10/9/2007 | 11/13/2007 | | DONE |
|
|
|
|
Permanent Occupancy | | | 10/9/2007 | | DONE |
|
|
|
|
BLD-Final | 10/1/2007 | 10/2/2007 | 10/2/2007 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 10/1/2007 at 1:36:37 PM. Contact: ###-####.
|
BLD-Final | 8/23/2007 | 8/24/2007 | 8/24/2007 | A | PART |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 8/23/2007 at 12:38:56 PM. Contact: ###-####.final ok for perm pending ele final aproval.
|
FIRE-Final Inspection | 8/22/2007 | 8/23/2007 | 8/23/2007 | A | PASS |
Forrest France
|
|
|
Corrections are complete, fire life safety inspection passed.
|
FIRE-Final Inspection | 8/20/2007 | 8/21/2007 | 8/21/2007 | A | PART |
Forrest France
|
|
|
Final pending correction of fire sprinkler coverage at the basement storage area due to a new wall which disrupts design density.
|
FIRE-Final Inspection | 8/20/2007 | 8/20/2007 | 8/20/2007 | A | NR |
Forrest France
|
|
|
Final pending satisfactory FA testing, on site conference regarding changes to EM lights as well.
|
BLD-Framing/Rough-in | 4/12/2007 | 4/13/2007 | 4/13/2007 | A | PART |
Jim Storey
|
|
|
Dan ; Phone #: ###-#### Internet Inspection Request from: Stacie Backus fire stopping core board ok
|
BLD-Framing/Rough-in | 3/8/2007 | 3/9/2007 | 3/9/2007 | A | PART |
Jim Storey
|
|
|
DAVE; Phone #: ###-#### Internet Inspection Request from: Victoria Beall conf.
|
Issue PAID IN FULL permit | | | 3/8/2007 | | DONE |
|
|
|
|
Print Occupancy Form | | | 3/7/2007 | | DONE |
|
|
|
|
Permit Ready to Issue | | | 3/7/2007 | | |
|
|
|
|
Telephone call | | | 3/7/2007 | | |
|
|
|
left mess for john reseigh at ###-#### that permit is ready
|
Plan resubmittals received | | | 3/6/2007 | | |
|
|
|
Received 1 transmittal letter and 2 copys of sheets A1.00R,A1.01R,A1.02R,A1.03R,A1.04R,A3.05R,G3.01,G3.02,G3.03 taken to Dan S.
|
Case Summary (BLD) | | | 3/6/2007 | | |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 3/6/2007 | | PASS |
|
|
|
Approved as noted on and all attached plan review of all reviewing agencies.
|
Print Pending Permit.LaserJet4 | | | 3/6/2007 | | |
|
|
|
|
Plan assigned to (DRS) | 12/12/2006 | | 3/6/2007 | | PASS |
|
|
|
3/6/2007 19:09:10 DRS - activity updated through activity BLDA022 from case BLD06-03408.
|
Routing - PLAN CHECK | 2/26/2007 | | 3/6/2007 | | PASS |
|
|
|
Plan resubmittals for upgrade of supporting structure & walls of center stair to upgrade to a 2-hour exit enclosure were provided and inserted into the plans. The center stair enclosure is required to provide the two required exits to all areas of the second floor based on this new tenant build-out. All columns, beams, floor system and enclosure walls are to be protected with 2-hour fire reisitive assemblies from an approved testing agency. copies of proposed systems/assemblies are to be provided to structural inspector for approval prior to beginning construction.
|
Telephone call | | | 3/5/2007 | | DONE |
|
|
|
Call from Jared Miller, mechanical design, concerning use of exception 1023 for exit discharge from the to-be upgraded 2-hour stair enclosure. With the exiting changes to the second floor connecting all areas to the exterior stair enclosure, the central stair becomes the 50% exception allowed in this code section. The support structure under the first floor lobby(s) exit discharge is required to be of 2-hour construction (if lobby discharge is in both directions on first floor, entire lobby / non-rated corridor floor supporting this area is required to be rated for 2-hours per sec. 1023. This eliminates the need for ducts and non-occupied area door opening into and exit passageway to be removed or modified to be out of the passageway per sec. 1019 IBC.
|
Routing - FIRE | 2/21/2007 | | 2/26/2007 | | PASS |
|
|
|
Attached updated review comments to plans.
|
Telephone call | | | 2/23/2007 | | DONE |
|
|
|
Phone message from Kelly asking for permission for contractor to continue working on T.I. while resubmittals were being prepared. I called him back to let him know I could not approve his request; that a permit to allow work up through framing in new shell builds had not been issued and I could not approve the process until the permit was issued. I gave him Marlene, George, Jenifer & Bruce as persons of authority to discuss his request with.
|
Plan Reviewer's activity | | | 2/23/2007 | | DONE |
|
|
|
E-mail to George slane and Marlene Southard concerning Kelly Patricks request to continue working on a project that does not have any permits at this time to allow work. I told them I had given there names to Kelly to contact if he wanted to pursue his request.
|
Routing - PLAN CHECK | 1/19/2007 | | 2/21/2007 | | FAIL |
|
|
|
Plan resubmittals provided. Location of two hour support system, listed assemblies for protection of columns, beams, floor, etc. for upgrade of the non-rated center stairway to become a 2-hour stair enclosure to allow use as an required exit from second and third floors were not part of the full size sheets. Architect provided 8-1/2" x 11" sheets with 2-hour wall system specified but only a note that other requirements were applicable without defining what where and how. Portions of the support system for the shell at elevator and mechanical shaft enclosure were required but additional support structure protection is needed. discussed on phone with Kelly Patrick and Glenn Walker. Also 2-hour exit passageway extension cannot have non-habitable rooms as defined by code opening into them. The access to the telephone/electrical room will need to be moved.
|
Plan resubmittals requested | | | 2/20/2007 | | DONE |
|
|
|
Reviewed with Glenn Walker, shell architect and Kelly Patrick, Hansen-Rice.
|
Plan resubmittals received | | | 2/15/2007 | | |
|
|
|
received letters 2 copies from hansen-rice (8) pages each. & letter of transmittal. also sets of plans with each TO.O1, A1.OO, A1.O1, A1.O2, A3.OO, A5.OO, A5.O2, A5.O3, A6.OO, A6.O1, A9.OO, M1.O, M1.1, M2.1, EO.O, E1.O, E2.O, E3.O- plans taken to dan stuart
|
1st review completed | | | 1/19/2007 | | FAIL |
|
|
|
Failed plan check and fire.
|
Routing - FIRE | 1/17/2007 | | 1/19/2007 | | FAIL |
|
|
|
Emailed applicant and architect resubmittal items. Attached fire review comments to plans.
|
Plan resubmittals requested | | | 1/17/2007 | | DONE |
|
|
|
Faxed copy of plan review to John Reseigh for response.
|
Routing - PLAN CHECK | 12/13/2006 | | 1/17/2007 | | FAIL |
|
|
|
Plan resubmittals required. Faxed plan review list of items needing to be addressed to John Reseigh, architect.Routing to fire code analys for review.
|
Routing - PUBLIC WORKS | 12/12/2006 | | 12/13/2006 | | PASS |
|
|
|
|
Routing - Addressing | 12/12/2006 | | 12/12/2006 | | PASS |
|
|
|
|
Plans ACCEPTED BY PLAN TECH | | | 12/4/2006 | | |
|
|
|
|
Application received | | | 11/30/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 11/30/2006 | | DONE |
|
|
|
|