Third Notice BLD | 5/25/2007 | 5/25/2007 | 6/1/2007 | | DONE |
|
|
|
Second Notice has not been responded to.
|
Second Notice BLD | 5/9/2007 | 5/9/2007 | 5/25/2007 | | DONE |
|
|
|
First Notice has not been responded to.
|
First Notice | 4/26/2007 | 4/26/2007 | 5/9/2007 | | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 4/25/2007 | 4/26/2007 | 4/26/2007 | A | PASS |
Mike Jordan
|
|
|
zach; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles
|
DOC - Permit Finaled | 4/26/2007 | 4/26/2007 | 4/26/2007 | P | PASS |
Mike Jordan
|
|
|
|
Code Occupancy Approval | 4/25/2007 | 4/25/2007 | 4/25/2007 | P | PASS |
Scott M.Brown
|
|
|
all in as required final ok
|
Code Occupancy Approval | 4/24/2007 | 4/25/2007 | 4/25/2007 | P | CANC |
Wm. Michael Meloy
|
|
|
zach; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles. Reassigned to Scott Brown
|
FIRE-Final Inspection | 4/24/2007 | 4/24/2007 | 4/24/2007 | P | PASS |
Troy Cobbley
|
|
|
life safety passed.
|
BLD-Framing/Rough-in | 3/5/2007 | 3/6/2007 | 3/6/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/5/2007 at 11:37:26 AM. Correct truss engineering on job site. Framing ok.
|
BLD-Framing/Rough-in | 3/2/2007 | 3/5/2007 | 3/5/2007 | A | FAIL |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 3/2/2007 at 1:03:48 PM. Contact: ###-####. Incorrect Truss enginnering on job site. No insp. done. Contractor was notified.
|
BLD-Framing/Rough-in | 3/1/2007 | 3/2/2007 | 3/2/2007 | A | PART |
Mike Jordan
|
|
|
zac; Phone #: ###-#### Internet Inspection Request from: Victoria Beall. ok to insul. Need truss engineering to complete framing inspection. Verified double layer 5/8 type x at soffit and can lights boxed out with double layer 5/8 typex. All penetrations were fire caulked.
|
BLD-Framing/Rough-in | 2/28/2007 | 3/1/2007 | 3/1/2007 | P | CANC |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/28/2007 at 2:05:47 PM. Contact: ###-####. Inspection cancelled from web by: Victoria Beall
|
BLD-Framing/Rough-in | 2/26/2007 | 2/27/2007 | 2/27/2007 | A | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/26/2007 at 4:07:01 PM. Contact: ###-####. Shear nailing ok. ok to cover exterior walls.
|
BLD-Framing/Rough-in | 2/25/2007 | 2/26/2007 | 2/26/2007 | A | PART |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/25/2007 at 1:35:44 PM. Contact: ###-####. Roof sheating ok to cover. Engineer noted staples to be at 2" oc.
|
BLD-Framing/Rough-in | 2/22/2007 | 2/23/2007 | 2/23/2007 | P | PART |
Mike Jordan
|
|
|
zack - shear wall ; Phone #: ###-#### Internet Inspection Request from: Patricia Smith. wip. 95% complete. Contractor used 1/2" x 1 1/2 " 16 gauge nails for attachment rather than the 10d nails listed on approved plans. Contractor to get conversion from engineer and restaple if neccessay. Everything at 3 and 6, east wall at 2 and 6.
|
BLD-Other | 2/21/2007 | 2/22/2007 | 2/22/2007 | P | NR |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 2/21/2007 at 11:52:46 AM. Contact: ###-####. shear nail insp. not ready. wip. Contractor to reschedule for tommorrow.
|
BLD-Foundation | 1/30/2007 | 1/30/2007 | 1/30/2007 | P | PASS |
Mike Jordan
|
|
|
Scheduled by a contractor via Hello! on 1/30/2007 at 10:05:21 AM. Contact: ###-####.
|
BLD-Footing | 1/29/2007 | 1/29/2007 | 1/29/2007 | P | PASS |
Mike Jordan
|
|
|
STEVE; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD-Footing | 1/25/2007 | 1/26/2007 | 1/26/2007 | P | NR |
Jim Storey
|
|
|
steve; Phone #: ###-#### Internet Inspection Request from: Victoria Beall
|
(F) Reprint permit | | | 1/10/2007 | | |
|
|
|
|
Inspection Record Card- Bld | | | 1/9/2007 | | DONE |
|
|
|
|
Telephone call | | | 1/9/2007 | | DONE |
|
|
|
lft ms with secretary for wes steele ###-#### that permit and fees are ready to be picked up but needs ACHD
|
Permit Ready to Issue | | | 1/9/2007 | | DONE |
|
|
|
|
Issue PAID IN FULL permit | | | 1/9/2007 | | DONE |
|
|
|
|
Routing - PLAN CHECK | 12/22/2006 | | 1/8/2007 | | |
|
|
|
|
Routing - PLANNING | 1/8/2007 | | 1/8/2007 | | PASS |
|
|
|
Approved per DRH06-00298 and CUP04-00026 MOD #4.
|
Routing - PLAN CHECK | 1/8/2007 | | 1/8/2007 | | PASS |
|
|
|
|
PLANS/APPL TAKEN TO FRONT DESK | | | 1/8/2007 | | DONE |
|
|
|
|
Plan assigned to (JCM) | 12/4/2006 | | 1/8/2007 | | PASS |
|
|
|
1/8/2007 14:42:06 JCM - activity updated through activity BLDA022 from case BLD06-03413.
|
Routing - FIRE | 12/18/2006 | | 12/22/2006 | | PASS |
|
|
|
Attached review comments to plans.
|
1st review completed | | | 12/22/2006 | | FAIL |
|
|
|
|
Plan resubmittals received | | | 12/20/2006 | | |
|
|
|
Received transmittal letter and two copies of pages 3 & 4; taken to John Menard
|
Plan Reviewer's activity | | | 12/18/2006 | | FAIL |
|
|
|
Reviewed plans for structural and nonstructural requirements. JCM
|
Plan resubmittals requested | | | 12/18/2006 | | DONE |
|
|
|
Faxed the applicant and architect a copy of the plan review requesting revisions. JCM
|
Routing - PLAN CHECK | 12/13/2006 | | 12/18/2006 | | FAIL |
|
|
|
John Menard
|
Routing - PLANNING | 12/13/2006 | | 12/13/2006 | | FAIL |
|
|
|
The applicant must provide Design Review staff with revised drawings that show compliance with conditions of approval from DRH06-00298. Travis Burrows at Dave Evans Construction was contacted concerning these issues.
|
Routing - PLUMBING | 12/12/2006 | | 12/13/2006 | | PASS |
|
|
|
shell no plumbing
|
Routing - Erosion and Sediment | 12/12/2006 | | 12/12/2006 | | PASS |
|
|
|
ESC plan approved with attached conditions.
|
Routing - PUBLIC WORKS | 12/7/2006 | | 12/12/2006 | | PASS |
|
|
|
|
Routing - PLANNING Land Div | 12/4/2006 | | 12/7/2006 | | PASS |
|
|
|
|
Plan routing begun/NEW & ADDTN | | | 12/4/2006 | | |
|
|
|
|
Pending Assignment by MYS | 12/1/2006 | | 12/4/2006 | | DONE |
|
|
|
12/4/2006 09:02:47 JCM - activity updated through activity BLDA166 from case BLD06-03413.
|
Plans ACCEPTED BY PLAN TECH | | | 12/4/2006 | | |
|
|
|
|
Application received | | | 12/1/2006 | | |
|
|
|
|
Recd Pcfee & Taken To Pln CK | | | 12/1/2006 | | DONE |
|
|
|
|